Broadband Grants Guide 2026: BEAD, ReConnect & E-Rate
Updated 12 official sources
Quick Answer: The federal government is distributing over $50 billion for broadband through BEAD ($42.45 billion), USDA ReConnect ($5.5 billion since 2018), E-Rate (a $5.20 billion cap for funding year 2026 (opens in a new tab)), and other programs.
Full answer and how we checked it
NTIA's BEAD dashboard (as of September 8, 2026) says all 56 states and territories have NTIA-approved Final Proposals, NIST has approved 55, and 54 have signed award agreements. As of October 9, 2026, the E-Rate FY2026 Form 471 window is closed, ReConnect has no open round, and USDA Community Connect's FY2026 window closed June 29, 2026. The one open digital equity opportunity is NTIA's Native Entities Grant Program, due November 17, 2026. Most funding flows through state broadband offices.
This guide is for: Rural providers, local governments, tribes, schools, libraries, ISPs, and nonprofit partners trying to choose the right broadband grants route.
Data note: Funding amounts and program-window notes reflect federal source checks on June 18, 2026, drawn from NTIA, BroadbandUSA, USDA, FCC, USAC, USASpending.gov, and Grants.gov. Amounts may shift with annual appropriations.
In this guide
- October 2026 Broadband Grant Search Path
- BEAD: The $42.45 Billion Program That's Reshaping American Broadband
- USDA ReConnect: Rural Broadband Loans and Grants
- E-Rate: Broadband Discounts for Schools and Libraries
- The Digital Equity Act: $2.75 Billion, Mostly Terminated
- FCC Emergency Connectivity Fund: Completed
- State Broadband Offices: Your Gateway to Most Broadband Funding
- Compliance Requirements for Broadband Grant Recipients
- The June 2025 NTIA Restructuring Changed Everything
- How to Position for Broadband Funding in 2026
- What NTIA's Broadband Portal Doesn't Tell You About Broadband Grants
- Related Guides
- How Grantsights Checked This Guide
- Sources
Broadband funding in the United States has never been larger or more complicated. The Infrastructure Investment and Jobs Act (IIJA) alone committed over $65 billion to broadband and digital equity programs, with the $42.45 billion BEAD program representing the single largest broadband investment in American history. Add USDA ReConnect, E-Rate, and various state programs, and you're looking at tens of billions in active or imminent funding.
Whether you're a rural community seeking broadband infrastructure funding, a local government applying for BEAD subgrants, or an ISP pursuing federal broadband programs, this guide covers the major broadband grant sources.
But here's what makes broadband grants uniquely confusing: most of this money doesn't flow directly from the federal government to applicants. BEAD funds go to state broadband offices, which then run their own subgrant competitions. E-Rate works through a discount system, not traditional grants. ReConnect is a loan and grant hybrid. And most of the Digital Equity Act's $2.75 billion was terminated in May 2025, except for a Native Entities program NTIA reopened in 2026.
Broadband is one of the most complex areas of grant funding. This guide covers every major program, its current status as of June 18, 2026, who's eligible, and how to actually access the funding.
October 2026 Broadband Grant Search Path
Use this 7-step path before choosing BEAD, ReConnect, E-Rate, or a local partner route.
| Step | What to check | Why it matters | Grantsights route |
|---|---|---|---|
| 1 | Applicant role: ISP, cooperative, tribe, local government, school, library, or nonprofit partner | Broadband funding changes by applicant, not only by project type | Start with the grant database |
| 2 | State BEAD status and subgrant window | BEAD applications run through state broadband offices, and 54 states or territories have signed award agreements | Check your state broadband office's subgrant schedule before spending on engineering |
| 3 | FCC map and state challenge status | A served location can fall out of BEAD eligibility even when local conditions are worse than the map shows | Pair state map review with eligibility checks |
| 4 | Technology and cost per location | The June 2025 restructuring made cost and technology-neutral validation central to BEAD strategy | Compare fiber, fixed wireless, hybrid, and anchor-institution costs against your state's scoring rules |
| 5 | Rural-only fit | ReConnect is USDA-direct and rural-specific, while BEAD is state-administered | Search USDA rural grant routes before picking one source |
| 6 | School or library discount path | E-Rate is a discount and invoicing system, not an ISP capital grant; the FY2026 Form 471 window closed April 1, 2026 | Use E-Rate for eligible schools and libraries, then search grant records for related routes |
| 7 | Compliance and failure modes | BABA, NEPA, match, procurement, and audit rules can change the true project cost | Build a compliance checklist for each funder when the project has more than one |
Grantsights pattern: broadband applicants lose time when they treat "broadband grants" as one program. The resilient route is applicant role, state status, map eligibility, technology choice, match, compliance, and then the funding source.
Next route: Compare the broadband overview with the grant database and the free eligibility checker. Use this page for BEAD, ReConnect, and E-Rate context before choosing an active program.
Get grant deadline alerts by email
About once a week, we email a short list of open grant calls with real deadlines from different funders. It isn't limited to the programs in this guide.
No spam. Unsubscribe anytime.
BEAD: The $42.45 Billion Program That's Reshaping American Broadband
The Broadband Equity, Access, and Deployment (BEAD) program is the centerpiece of federal broadband investment. Authorized by the IIJA and administered by the National Telecommunications and Information Administration (NTIA), BEAD's goal is straightforward: connect every unserved and underserved location in America to reliable, high-speed internet.
How BEAD Works
Unlike traditional federal grants where applicants apply directly to a federal agency, BEAD uses a state-administered model:
- NTIA allocated funds to all 56 states and territories based on the number of unserved and underserved locations identified through FCC broadband maps
- State broadband offices developed Five-Year Action Plans and Initial Proposals describing how they'd use the funds
- States submitted Final Proposals to NTIA for approval, detailing their subgrant process, scoring criteria, and deployment timeline
- NTIA and NIST approved the proposals, making grant funds available
- State broadband offices run subgrant competitions to select ISPs and other entities to build broadband infrastructure
- Subgrantees deploy broadband to unserved and underserved locations
As of September 8, 2026, according to the NTIA BEAD Progress Dashboard (opens in a new tab):
- All 56 states and territories have received NTIA approval of their Final Proposals
- NIST has approved 55 of those, making grant funds available
- 54 states and territories have signed and returned their award agreements
- First BEAD-funded construction projects are breaking ground in early 2026
Largest State Allocations
The top 10 BEAD allocations, based on NTIA data (opens in a new tab), give you a sense of the scale:
| State | BEAD Allocation |
|---|---|
| Texas | $3.31 billion |
| California | $1.86 billion |
| Missouri | $1.74 billion |
| Michigan | $1.56 billion |
| North Carolina | $1.53 billion |
| Virginia | $1.48 billion |
| Alabama | $1.40 billion |
| Louisiana | $1.36 billion |
| Georgia | $1.31 billion |
| Pennsylvania | $1.16 billion |
Who Can Apply for BEAD Subgrants
You don't apply to NTIA for BEAD funding. You apply to your state broadband office. Eligible applicants vary by state but typically include:
- Internet service providers (ISPs): The primary target applicants, including incumbent telecom companies, cable operators, fixed wireless providers, and fiber-optic companies
- Electric cooperatives and utilities: Many rural electric co-ops are deploying fiber alongside their power lines
- Tribal entities: Tribal nations and organizations can apply in most states
- Local governments and municipal broadband authorities: Eligible in states that don't restrict municipal broadband
- Nonprofits: Usually in partnership with a qualified ISP that handles the technical deployment
BEAD Speed and Technology Requirements
BEAD sets minimum performance standards for funded projects:
- Speed floor: 100 Mbps download / 20 Mbps upload (100/20)
- Technology route: After NTIA's June 2025 restructuring notice, the program is technology-neutral when a proposed network can meet the performance, latency, scalability, and state validation rules
- Latency: Must meet reasonable latency standards (typically under 100ms)
- Scalability: NTIA encourages networks that can scale to higher speeds over time
States must prioritize unserved locations first (those lacking 25/3 Mbps service), then underserved locations (those lacking 100/20 Mbps service). Only after covering all unserved and underserved locations can states use remaining BEAD funds for community anchor institutions or other eligible uses.
Build America, Buy America (BABA) Requirements
All BEAD-funded infrastructure projects must comply with the Build America, Buy America Act, which requires the use of American-made iron, steel, manufactured products, and construction materials. This affects:
- Fiber optic cable: Must be manufactured in the United States
- Conduit and duct: American-made steel and iron required
- Electronics and networking equipment: Subject to BABA manufactured products requirements, though waivers may apply for certain components
- Construction materials: Concrete, aggregates, and other materials must be domestically sourced
BABA compliance adds cost and complexity. Subgrantees should factor these requirements into their project budgets and supply chain planning. For a broader overview of infrastructure-related federal requirements, our infrastructure grants guide covers BABA compliance across all IIJA programs.
Current BEAD Timeline
Based on state progress reports and NTIA's timeline (opens in a new tab):
- 2024 to 2025: States developed and submitted Final Proposals
- 2025 to 2026: NTIA and NIST approved proposals; states launched subgrant competitions
- 2026 to 2027: Most subgrants awarded; construction begins
- 2026 to 2030: Major construction and deployment phase
- Post-2030: Program closeout and verification
If you're an ISP or broadband deployer, now is the time to engage with your state broadband office. Most states are actively accepting or about to accept subgrant applications.
USDA ReConnect: Rural Broadband Loans and Grants
The USDA ReConnect Loan and Grant Program has been one of the most productive federal broadband programs since its launch in 2018, deploying over $5.5 billion in loans and grants for rural broadband projects, according to the USDA ReConnect program page (opens in a new tab).
How ReConnect Works
ReConnect offers three funding options:
100% Grant: Covers up to 75% of eligible project costs, with the applicant providing a 25% match. Maximum award varies by funding round.
50% Loan / 50% Grant Combination: The loan portion carries a 2% interest rate with terms up to 35 years. Less competitive than 100% grants because the loan component reduces risk for applicants.
100% Loan: Lowest interest rate (2%), longest terms (up to 35 years), and least competitive because applicants bear all repayment risk.
Eligibility
ReConnect targets rural areas specifically:
- Service area must be in a rural community (population under 20,000 for most funding rounds)
- At least 50% of households in the proposed service area must lack access to broadband at 100/20 Mbps
- Applicants must demonstrate financial feasibility and technical capability
- Eligible applicants include ISPs, cooperatives, tribal entities, state and local governments, and nonprofits
Current Source Status
USDA's public ReConnect page still describes the program family and says the fifth-round application window closed May 21, 2024; Grants.gov shows no later round as of October 9, 2026. That matters for applicant planning: ReConnect is a rural broadband source to monitor, but the public program page should not be read as proof that a current application window is open.
USDA Community Connect is a separate rural broadband route. USDA Rural Development said FY2026 Community Connect applications were accepted from May 13, 2026 through June 29, 2026, and that window is now closed. Check USDA's Community Connect Grants page for the FY2027 window. If you're planning a rural broadband project and want to understand federal-to-state funding flows more broadly, our USDA grants guide covers the full range of USDA programs.
ReConnect vs. BEAD
Many applicants wonder whether to pursue ReConnect, BEAD, or both. Here's how they compare:
| Factor | BEAD | ReConnect |
|---|---|---|
| Funding source | IIJA / NTIA | USDA Farm Bill / Appropriations |
| Total funding | $42.45 billion | Annual appropriations plus about $1.93 billion from IIJA (FY2022-FY2026) |
| Administered by | State broadband offices | USDA directly |
| Area focus | All unserved/underserved | Rural only (population <20K) |
| Application | To state broadband office | To USDA |
| Speed requirement | 100/20 Mbps minimum | 100/20 Mbps minimum |
| BABA compliance | Required | Required |
| Match requirement | At least 25% of project costs by statute (reduced in high-cost areas or by NTIA waiver) | 25% for grants |
The two programs can complement each other. An ISP might pursue BEAD for its state's priority locations and ReConnect for rural areas outside the BEAD service obligation.
E-Rate: Broadband Discounts for Schools and Libraries
E-Rate is the longest-running federal broadband program, operating continuously since 1997. Unlike BEAD and ReConnect, E-Rate isn't a grant. It's a discount program that reduces the cost of broadband services and internal connections for schools and libraries.
How E-Rate Works
The program is funded through the Universal Service Fund (USF), which is administered by the Universal Service Administrative Company (USAC). The Supreme Court upheld the USF mechanism in a 6-3 decision in June 2025, resolving years of constitutional uncertainty.
Annual funding cap: $5,200,279,829 for funding year 2026 (July 1, 2026 to June 30, 2027), up 2.8% from $5,058,637,966 in 2025, according to FCC public notice DA 26-291 (opens in a new tab). See the FCC's E-Rate page (opens in a new tab) for program rules.
Discount rates: 20% to 90% of eligible costs, based on:
- The percentage of students eligible for the National School Lunch Program (higher poverty = higher discount)
- Whether the applicant is in a rural or urban area (rural gets higher discounts)
Eligible services (Category 1):
- Internet access (fiber, cable, fixed wireless)
- Data transmission services
- Leased dark fiber and self-provisioned fiber
Eligible services (Category 2):
- Internal connections (switches, routers, access points)
- Managed internal broadband services
- Basic maintenance of internal connections
2026 to 2030 Budget Cycle
Starting July 1, 2026, revised E-Rate budgets for the 2026 to 2030 cycle provide:
- $201.57 per student over 5 years for schools
- $5.43 per square foot over 5 years for libraries
- $30,175 minimum for schools with fewer than 149 students
- $66,385 minimum for tribal libraries
Recent Changes
The FCC voted in September 2025 to remove school bus Wi-Fi and internet hotspots from E-Rate eligibility for FY2025 and beyond. This reversed a 2024 expansion and ended E-Rate support for those hotspot and school bus Wi-Fi services. Schools that relied on E-Rate-funded hotspots for student connectivity need to find alternative funding sources.
How to Apply for E-Rate
The E-Rate application process runs on an annual cycle:
- File FCC Form 470 (request for services) to solicit bids from service providers
- Wait 28 days for the competitive bidding period
- Select a service provider based on cost-effectiveness
- File FCC Form 471 (application for discount) through USAC's online portal
- USAC reviews and approves applications
- Receive services and file for reimbursement or direct discount
The FY2026 application window ran from January 21 to April 1, 2026. For FY2027, expect a similar timeline starting in January 2027.
The Digital Equity Act: $2.75 Billion, Mostly Terminated
The Digital Equity Act was originally the second pillar of the IIJA's broadband strategy, alongside BEAD. While BEAD funds infrastructure deployment, the Digital Equity Act targeted digital inclusion: making sure people have the skills, devices, and support they need to use broadband effectively.
What the Digital Equity Act Funded
Congress provided $2.75 billion through the IIJA, as advance appropriations spread over FY2022-FY2026, across three programs:
- State Digital Equity Planning Grants ($60 million, awarded in 2022): Funded all 50 states, D.C., Puerto Rico, and territories to develop digital equity plans
- State Digital Equity Capacity Grants ($1.44 billion): Funded states to implement their digital equity plans through subgrants to local organizations
- Digital Equity Competitive Grants ($1.25 billion): Direct federal grants to nonprofits, local governments, and other organizations for digital equity projects
Current Status: Terminated, Litigated, and One Open Native Entities Program
On May 9, 2025, the administration terminated all Digital Equity Act grants, contacting grantees with termination notices. The administration argued the program was unconstitutional.
The legal response has been significant, according to reporting from the American Library Association (opens in a new tab):
- States and digital inclusion groups filed lawsuits challenging the termination
- Check the ALA page and your state broadband office for the current status of those cases
Open now: NTIA posted the Native Entities Grant Program (opens in a new tab) (2026-NTIA-NEGP) on Grants.gov on June 17, 2026. It combines the Native Entity set-asides from the State Capacity and Competitive programs, and applications are due November 17, 2026. If you're a tribe, Alaska Native entity, or Native Hawaiian organization working on digital skills, devices, or adoption, this is the one Digital Equity Act route still accepting applications.
State-Level Alternatives
Some states have stepped in to fill the gap:
- New York: The ConnectALL Office has announced state-funded digital equity grants
- Several other states are using state funds, BEAD non-deployment funds, or other federal sources to continue digital equity work
If you were relying on Digital Equity Act funding, check the Native Entities program if you're eligible, watch the litigation and check with your state broadband office about alternative funding sources.
FCC Emergency Connectivity Fund: Completed
The Emergency Connectivity Fund (ECF) was a $7.17 billion program created during the COVID-19 pandemic to fund connected devices and broadband connections for schools and libraries. The program reached approximately 18 million students, providing over 13.5 million connected devices and 8 million broadband connections, according to the FCC (opens in a new tab).
ECF is no longer accepting applications. The program's sunset date was June 30, 2024. All eligible purchases must have been made by that date.
For schools and libraries that relied on ECF, the transition pathway is:
- E-Rate for ongoing broadband service and internal connections
- State and local funding for devices and hotspots
- BEAD non-deployment funds may be available in some states for anchor institution connectivity
State Broadband Offices: Your Gateway to Most Broadband Funding
For BEAD and many other broadband programs, your state broadband office is the most important point of contact. Every state and territory has designated a broadband office to administer BEAD and coordinate broadband planning.
What State Broadband Offices Do
- Administer BEAD subgrant competitions: They set eligibility criteria, scoring rubrics, application timelines, and award decisions
- Manage state broadband maps: Many states maintain their own mapping efforts alongside the FCC's national broadband map
- Coordinate with federal agencies: They serve as the intermediary between NTIA and subgrantees
- Distribute other state broadband funds: Many states have their own broadband grant programs in addition to BEAD
How to Engage with Your State Broadband Office
- Find your office: The BroadbandUSA website (opens in a new tab) links to all state broadband office resources and BEAD plans
- Read the Final Proposal: Your state's BEAD Final Proposal describes the exact subgrant process, scoring criteria, match requirements, and deployment timeline
- Register for notifications: Most state offices maintain email lists for upcoming application windows
- Attend stakeholder meetings: State offices hold public meetings during the planning and subgrant development phases
- Understand your state's priority areas: Review the state broadband map to identify where your service area overlaps with unserved or underserved locations
States Moving Fastest
As of early 2026, according to industry reporting (opens in a new tab), states making the most progress on BEAD deployment include Louisiana, Texas, Mississippi, Nevada, and Hawaii. Wisconsin anticipates BEAD construction beginning in spring 2026 after environmental reviews are completed.
Compliance Requirements for Broadband Grant Recipients
Broadband grants come with significant compliance obligations that can trip up first-time federal grant recipients.
Build America, Buy America (BABA)
All IIJA-funded broadband projects, including BEAD and some ReConnect rounds, must comply with BABA. This means:
- Iron and steel must be produced in the United States
- Manufactured products must be manufactured in the United States (with some waiver processes)
- Construction materials must be domestically sourced
- Waivers are available but require documentation and public comment periods
Financial Management
- Organizations spending $1,000,000 or more in federal awards in a fiscal year must complete a Single Audit under 2 CFR 200 Subpart F
- Equipment purchases over $10,000 are classified as capital equipment and require property management procedures
- Only the first $50,000 of each subaward counts in the modified total direct cost (MTDC) base for indirect costs; the rest of the subaward is excluded
- If you don't have a federally negotiated indirect cost rate, you can use the de minimis rate of 15% of MTDC
Reporting
BEAD subgrantees must report on:
- Construction progress and milestones
- Speed test results for completed locations
- Subscriber uptake in served areas
- Financial expenditures and match contributions
- BABA compliance documentation
Environmental and Historical Preservation Review
Broadband infrastructure projects often trigger environmental review requirements under the National Environmental Policy Act (NEPA). Burying fiber requires trenching or boring, which may affect wetlands, endangered species habitat, or historical sites. State broadband offices typically coordinate these reviews, but they can add 3 to 6 months to project timelines.
The June 2025 NTIA Restructuring Changed Everything
On June 6, 2025, NTIA issued a Restructuring Policy Notice that fundamentally altered the BEAD program. If you read anything about BEAD before that date, much of it is now outdated. Here's what actually changed and what it means for applicants.
The original BEAD program had a strong "fiber-first" preference. States were expected to prioritize fiber-to-the-premises deployments, and alternative technologies like fixed wireless had to clear additional justification hurdles. The June 2025 Policy Notice eliminated that preference entirely. BEAD is now technology-neutral: any technology that meets the 100/20 Mbps speed floor with under 100ms latency and demonstrates scalability can compete on equal footing with fiber. Fixed wireless providers that were previously disadvantaged in state scoring rubrics are now explicitly eligible under new technical validation criteria outlined in Appendix A of the Policy Notice.
The more disruptive change is the new primary scoring criterion: lowest total BEAD program cost per location. States were instructed to redo their subgrant programs within 90 days to comply. That means states that spent 18 months building fiber-focused scoring rubrics had to scrap them and rebuild around cost efficiency. For ISPs, this is a seismic shift. A fixed wireless provider that can connect a rural location for $3,000 now scores higher than a fiber provider proposing $12,000 per location, even though the fiber connection is objectively superior long-term.
The Policy Notice also removed requirements for fair labor practices, climate resilience considerations, consumer protections, and affordability measures that were in the original BEAD NOFO. Those removals reduce compliance burden for subgrantees but also mean that BEAD-funded networks have no federal mandate to offer affordable service tiers. Some states are adding their own affordability requirements to fill the gap, but many aren't.
For applicants with a fiber-first design, a hybrid approach can lower the blended cost per location: fiber to the denser clusters and fixed wireless to the most remote locations.
If you're applying for BEAD subgrants in 2026, read your state's revised final proposal, not the original one. The rules changed under your feet.
How to Position for Broadband Funding in 2026
If you're an ISP, cooperative, tribal entity, or local government looking to build broadband, here's a practical roadmap:
Step 1: Identify Your Service Area
Use the FCC National Broadband Map (opens in a new tab) to identify unserved (below 25/3 Mbps) and underserved (below 100/20 Mbps) locations in your target area. Challenge any inaccurate data through the FCC's challenge process.
Step 2: Engage Your State Broadband Office
Contact your state broadband office, review their BEAD Final Proposal, and register for notifications about upcoming subgrant windows. Attend any stakeholder meetings or pre-application conferences.
Step 3: Develop Your Project Plan
Build a detailed plan covering:
- Network design and technology choice that meets state rules, performance needs, and total cost-per-location review
- Construction timeline and milestones
- BABA compliance plan for materials and equipment
- Financial projections showing long-term sustainability
- Community engagement and adoption strategy
Step 4: Prepare Your Compliance Infrastructure
If you haven't received federal grants before, you'll need:
- SAM.gov registration: Required for all federal award recipients. Our SAM.gov registration guide explains the process.
- Accounting system: Capable of tracking federal funds separately and supporting audit requirements
- Procurement policies: Written policies that comply with 2 CFR 200 procurement standards
- BABA compliance procedures: Supply chain documentation and domestic sourcing plans
Step 5: Stack Funding Sources
Don't rely on a single program. Combine:
- BEAD subgrants for priority unserved/underserved areas
- USDA ReConnect for rural areas outside BEAD coverage
- E-Rate for schools and libraries in your service territory
- State broadband programs for additional matching funds or gap financing
- Private capital for network expansion beyond grant-funded areas
What NTIA's Broadband Portal Doesn't Tell You About Broadband Grants
The BEAD (Broadband Equity, Access, and Deployment) program is the largest broadband grant program in history at $42.45 billion, but the money flows through states, not directly to ISPs or communities. Each state submitted a 5-year action plan and an initial proposal to NTIA. The actual subgrant process varies by state, and some states are only now beginning to accept applications from providers.
Challenge processes are critical in BEAD and the FCC's Broadband Data Collection. If your area is incorrectly mapped as 'served' when it lacks adequate broadband, you need to file a challenge during the designated challenge window. Missing the challenge window means your area won't be eligible for BEAD funding in this round, even if the data is wrong.
The Digital Equity Act ($2.75 billion) is a separate program from BEAD but administered alongside it. Digital equity funding covers devices, digital literacy training, and accessibility for people with disabilities. Many organizations focused on community development, education, or workforce training are eligible for digital equity subgrants but don't realize it because they don't think of themselves as 'broadband' organizations.
Related Guides
- Grants For Rural Internet
- USDA Grants
- USDA NIFA Grants
- USDA Grants
- USDA Rural Development Grants
- DOJ Grants
How Grantsights Checked This Guide
Grantsights reviewed NTIA BEAD dashboards, BroadbandUSA resources, USDA ReConnect, FCC E-Rate, USAC E-Rate filing-window materials, state broadband office materials, and USASpending broadband awards in June 2026. Those federal pages explain BEAD, ReConnect, and E-Rate separately, but applicants need a route map showing whether they apply to a state office, USDA, FCC/USAC, or a local partner.
| Source checked | What it confirms | Applicant decision |
|---|---|---|
| NTIA BEAD Progress Dashboard (opens in a new tab) | BEAD Final Proposal and award-agreement progress | Check state status before spending on an application |
| BroadbandUSA BEAD program (opens in a new tab) | $42.45 billion BEAD program structure | Apply through state subgrant processes, not NTIA |
| USDA ReConnect overview (opens in a new tab) | Rural broadband loan and grant model | Use for eligible rural deployment projects |
| FCC E-Rate (opens in a new tab) | School and library broadband discount route | Use for eligible schools and libraries, not ISP capital |
| USAC FY2026 E-Rate filing window (opens in a new tab) | FY2026 Form 471 window ran January 21 to April 1, 2026 | Track review and next-cycle dates if the window was missed |
| USDA Community Connect (opens in a new tab) | FY2026 applications were accepted from May 13, 2026 through June 29, 2026; that window has closed | Compare this separate rural route before assuming ReConnect is open |
According to the National Telecommunications and Information Administration's BEAD dashboard (opens in a new tab) (as of September 8, 2026), all 56 states and territories submitted Final Proposals and received NTIA approval, NIST had approved 55, and 54 had signed award agreements. According to BroadbandUSA, BEAD is a $42.45 billion federal grant program. According to USDA, ReConnect can provide loans and grants for construction, improvement, or acquisition of rural broadband facilities and equipment, but USDA's public ReConnect page still points to a fifth-round application window that closed May 21, 2024. According to USAC, the FY2026 E-Rate Form 471 window closed April 1, 2026. According to USDA Rural Development, Community Connect FY2026 applications were accepted until June 29, 2026, and that window has closed. Watch USDA's Community Connect Grants page for the FY2027 application dates. According to USASpending.gov award data and Grants.gov notices, the applicant route still needs to be checked program by program because broadband dollars can be federal-direct, state-administered, local, loan-based, reimbursement-based, or discount-based.
Our analysis of broadband grant routes shows that the right route depends on applicant role: state broadband office subgrantee, rural provider, school/library applicant, tribe, local government, or nonprofit partner. For example, an ISP with construction capacity should monitor state BEAD subgrant windows, while a public library should use E-Rate and a rural electric cooperative may compare BEAD with ReConnect. A nonprofit digital-skills program is a bad fit for BEAD deployment unless paired with a qualified network builder. Use this page with rural grant routes, telehealth grants, state grant guides, and Grantsights matches.
Sources
- NTIA BEAD Program Page (opens in a new tab)
- NTIA BEAD Progress Dashboard (opens in a new tab)
- USDA ReConnect Loan and Grant Program (opens in a new tab)
- USDA Community Connect Grants (opens in a new tab)
- FCC E-Rate Program (opens in a new tab)
- USAC FY2026 E-Rate Filing Window (opens in a new tab)
- FCC Emergency Connectivity Fund (opens in a new tab)
- BroadbandUSA State Resources (opens in a new tab)
Best follow-up
Compare broadband programs before planning
Free eligibility check: answer 9 questions and see ranked matches with deadlines and fit reasons.
Free. No payment on this step.
Frequently Asked Questions
Who can apply for BEAD funding?
You don't apply to the federal government for BEAD. NTIA allocated BEAD funds to states and territories, and each state broadband office runs its own subgrant process. Eligible subgrantees vary by state but typically include internet service providers (ISPs), electric cooperatives, tribal entities, local governments, and nonprofits partnering with ISPs. The applicant must demonstrate the technical and financial capacity to deploy broadband infrastructure that meets the 100/20 Mbps speed requirement. By statute ([47 U.S.C. 1702(h)(3)](https://www.law.cornell.edu/uscode/text/47/1702)), the state must provide or require subgrantees to provide a non-federal match of at least 25% of project costs, except in high-cost areas or where NTIA reduces or waives it, so check how your state applies it. Check your state broadband office website for specific eligibility and application timelines.
What broadband speed do you need for BEAD-funded projects?
BEAD requires a minimum download speed of 100 Mbps and upload speed of 20 Mbps (100/20) for funded projects. This is the floor, not the target. After NTIA's June 2025 restructuring notice, the program is technology-neutral when a proposed network can meet the speed, latency, scalability, and state validation rules. States must prioritize unserved locations first, then underserved locations. Technologies that cannot reliably deliver 100/20 Mbps will not qualify as BEAD solutions.
Is the Digital Equity Act still active?
Mostly not, with one open exception. The administration terminated the State Capacity and Competitive grants with notices on May 9, 2025, and lawsuits challenging the termination followed. But NTIA posted the Digital Equity Act Native Entities Grant Program (2026-NTIA-NEGP) on Grants.gov on June 17, 2026, combining the Native Entity set-asides from the State Capacity and Competitive programs, and it's open until November 17, 2026. Tribes and other eligible Native entities should look at it now. Some states have also created state-funded digital equity programs.
Can schools and libraries still get broadband funding through E-Rate?
Yes. E-Rate is an ongoing program funded through the Universal Service Fund with a funding year 2026 cap of $5,200,279,829, according to the FCC. The Supreme Court upheld the USF mechanism in a 6-3 decision in June 2025, resolving a constitutional challenge. Schools and libraries can receive discounts of 20% to 90% on eligible broadband services, with the discount rate based on the percentage of students eligible for the National School Lunch Program and whether the applicant is in a rural or urban area. The FY2026 Form 471 application window ran from January 21 to April 1, 2026, so applicants now need to track review, funding commitments, invoicing, and the next annual cycle.
What happened to the USDA ReConnect program?
USDA's public ReConnect page still describes the program family, but the page points to a fifth-round application window that closed May 21, 2024, and no later round had been posted on Grants.gov as of October 9, 2026. Treat ReConnect as a rural broadband source to monitor, not proof that a current grant window is open. USDA Community Connect is a separate rural broadband route; its FY2026 applications were accepted from May 13, 2026 through June 29, 2026, and that window has closed. Monitor USDA Rural Development's Community Connect page for the FY2027 dates.
Last updated October 9, 2026. Corrected October 9, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
EDA Grants 2026: Public Works, Who Qualifies, 40% Match
EDA grants fund public works and economic adjustment for local governments, tribes, universities and nonprofits. Most need a 40% match. How to apply.
SBA Disaster Loans vs Grants 2026: Rates & How to Apply
SBA disaster loans aren't grants. Learn about 4 loan types, rates from 2.875% to 8%, the $2M max, and how FEMA referrals work in 2026.
SBA Grants Guide: What SBA Actually Funds (2026)
SBA funds 16 training programs but no startup grants. See which SBA grants exist, who gets them, how SBIR fits, and why most SBA money is loans.
USDA Grants Guide 2026: Eligibility & How to Apply
Compare 3 USDA grants application routes, program-specific documents, eligibility rules, and the current checklists that control each submission.
NIFA Grants Guide 2026: AFRI & How to Apply
Compare 3 NIFA funding routes, current open NOFOs, applicant fit, award evidence, deadlines, and the right USDA next step.
Workforce Development Grants 2026: WIOA, DOL & How to Apply
DOL awards $3B+ a year through WIOA formula grants plus competitive programs like YouthBuild and RESTART reentry grants. Full eligibility guide.