Skip to content

Cooperative Agreements vs Grants Explained

Updated 18 official sources

Quick Answer: A cooperative agreement requires substantial federal involvement in your project; a standard grant does not. This distinction comes from 31 USC 6304 and 6305.

Full answer and how we checked it

In practice, federal staff will participate in program decisions, review work plans, and sometimes redirect activities. According to USAspending.gov's FY2025 award data (opens in a new tab), cooperative agreements carried about 90% of CDC's project-type obligations but only about 20% of NIH's, where they're reserved mainly for U-series consortium and clinical trial awards.

Data note: Amounts may shift with annual appropriations.

In this guide

If you're a grant writer or program manager trying to understand the difference between grants and cooperative agreements, the distinction affects more than just terminology.

If you've applied for federal funding, you've probably noticed that some opportunities say "grant" and others say "cooperative agreement." It's easy to treat them as interchangeable. They're not. The instrument type on your award changes how you'll interact with the federal agency, how much autonomy you have over your project, and how much time you'll spend on coordination and reporting.

This guide explains the legal distinction, what it looks like in practice, how it affects your budget and staffing, and which agencies favor which instrument.

Both grants and cooperative agreements transfer federal funds to a non-federal entity for a public purpose. The legal difference is one thing: the anticipated level of federal involvement. That rule has stood for 49 years: three sections of Title 31 (6303, 6304 and 6305) sort every federal funding relationship into a contract, a grant, or a cooperative agreement.

The Federal Grant and Cooperative Agreement Act of 1977 (opens in a new tab) established the framework, codified at 31 USC 6303-6305:

  • 31 USC 6304 (opens in a new tab) (Grants): Used when the agency's principal purpose is to transfer a thing of value to carry out a public purpose authorized by federal law, and no substantial involvement by the agency is expected during performance.
  • 31 USC 6305 (opens in a new tab) (Cooperative Agreements): Used when the same conditions apply, but substantial involvement by the agency is expected during performance.
  • 31 USC 6303 (Contracts): Used when the principal purpose is the acquisition of property or services for the direct benefit of the federal government.

That's it. The only legal variable is whether the federal agency plans to be substantially involved in carrying out the work. Everything else, including eligibility rules, cost principles under 2 CFR 200, reporting requirements, and audit obligations, applies equally to both grants and cooperative agreements.

The Uniform Guidance repeats the same split. According to 2 CFR 200.1 (eCFR text (opens in a new tab)), a grant agreement "is distinguished from a cooperative agreement in that it does not provide for substantial involvement," while a cooperative agreement is the instrument that does. One detail in those definitions gets missed: both cover the relationship between a pass-through entity and a subrecipient, not only between a federal agency and a recipient. If your state health department passes CDC money to you under a cooperative agreement, the state can be the party that's substantially involved.

The agency makes this determination before publishing the Notice of Funding Opportunity (NOFO). You don't get to choose, and it's not negotiable.


Looking for your next grant?

About once a week, we email a short list of open grant calls with real deadlines from different funders. It lists open calls only.

No spam. Unsubscribe anytime.

What "Substantial Involvement" Actually Looks Like

The law says "substantial involvement" but doesn't define it precisely. In practice, agencies have developed their own interpretations, and the terms show up even on small awards: a CDC case registry award of $82,500 for one budget period carries a full involvement clause (see the 3 documents below). Here's what substantial involvement typically includes:

Activities That Count as Substantial Involvement

  • Approving work plans before activities begin each year or phase
  • Reviewing and directing technical approaches, such as study design, survey instruments, or intervention protocols
  • Participating in steering committees or technical advisory groups with decision-making authority
  • Approving key personnel changes beyond the standard PI/PD change process
  • Collaborating on data analysis and interpretation of results
  • Redirecting project activities based on emerging findings or changing priorities
  • Providing federal staff who work alongside recipient staff on project tasks
  • Reviewing deliverables before dissemination (publications, toolkits, training materials)

Activities That Don't Count

Normal federal oversight doesn't qualify as substantial involvement. These are standard for all grants:

  • Reviewing annual progress reports
  • Monitoring financial reports and drawdowns
  • Conducting routine site visits
  • Processing budget modifications and no-cost extensions
  • Enforcing terms and conditions

The line isn't always clean. An agency that provides "technical assistance" could be offering standard monitoring or actively shaping your project. The NOFO and award Terms and Conditions should spell out exactly what the agency plans to do.

What 3 Real Award Documents Say

Grantsights checked the substantial involvement language in 3 public award documents, one each from CDC, NIH and EPA, picked because the full terms were posted online and the award or notice was current in 2026. It's a small sample meant to show what the clause looks like on paper, not a rate for any agency.

DocumentAgency role it spells outWhat stays with the recipient
CDC notice of award NU58DP007682 (opens in a new tab), SUID and SDY Case Registry, New Jersey Department of Children and Families, $82,500 for the budget period starting September 30, 2026Quarterly CDC-generated data reports discussed on a monthly call, quarterly feedback on case categorization, review of the annual evaluation plan update, an annual reverse site visitRunning the registry and meeting the NOFO's benchmarks
NIH PAR-25-149 (opens in a new tab), NINDS U01 clinical trial renewals, expiring November 2027A Project Scientist who sets milestones with the team and holds one vote on the steering committee, oversight of the IRB-approved protocol, the right to reduce funding or end the trial if milestones are missedStudy design, conduct, data analysis and publications; primary rights to the data
EPA EPA-OLEM-OBLR-26-01 (opens in a new tab), FY27 Brownfields Job Training, up to 20 awards of up to $300,000Close monitoring, collaboration on the scope of work, review of proposed procurement, approval of key personnel qualifications, review and comment on reportsHiring (EPA can't select your staff or contractors) and the final say on report content

All 3 go beyond the normal oversight listed above, but in different ways. The CDC award adds a standing meeting rhythm. The NIH notice gives federal staff a vote and a funding lever tied to milestones. The EPA notice reaches into procurement and staffing approvals. That's why the word "cooperative agreement" alone won't tell you how much staff time to budget; the involvement list will.


Grants vs Cooperative Agreements vs Contracts: Comparison Table

Grants and cooperative agreements sit side by side in federal spending data: in FY2025, project grants carried $218.9 billion and cooperative agreements $56.4 billion in net obligations, according to USAspending.gov's award records (opens in a new tab). Contracts are tracked separately because they're procurement, not assistance.

FeatureGrantCooperative AgreementContract
Legal authority31 USC 630431 USC 630531 USC 6303
Primary purposeSupport a public purposeSupport a public purposeAcquire goods/services for the government
Federal involvementOversight onlySubstantial involvementFull direction and control
Who defines the workRecipient proposesRecipient proposes, agency shapesAgency specifies requirements
Autonomy levelHighModerateLow
Who benefitsPublic/recipientPublic/recipientFederal government
Intellectual propertyRecipient typically retainsRecipient typically retainsGovernment often retains
Governed by2 CFR 2002 CFR 200Federal Acquisition Regulation (FAR)
Application processNOFO on Grants.gov (opens in a new tab)NOFO on Grants.gov (opens in a new tab)Solicitation on SAM.gov (opens in a new tab)
Common recipientsNonprofits, universities, statesStates, health depts, nonprofitsFor-profit contractors
Payment methodDrawdown via PMS or ASAPDrawdown via PMS or ASAPInvoicing

The key takeaway: grants and cooperative agreements are far more similar to each other than either is to a contract. Both are assistance instruments governed by the Uniform Guidance. Contracts are procurement instruments governed by the FAR, and they work completely differently.


Which Agencies Use Cooperative Agreements (and Which Don't)

Agencies vary dramatically in how often they use cooperative agreements. This matters because if you're applying to a cooperative-agreement-heavy agency, you need to budget and plan differently.

Grantsights analysis of FY2025 USAspending.gov (opens in a new tab) award data found that cooperative agreements carried $56.4 billion in net obligations across 46,474 awards, which is 20.5% of the dollars and 14.4% of the awards in the two discretionary assistance types (project grants, type code 04, and cooperative agreements, type code 05). Method: we pulled net obligations (new money minus deobligations) for transactions dated October 1, 2024 through September 30, 2025, and counts of awards with a transaction in that window, from the public USAspending.gov search API, split by awarding agency. Block and formula grants (codes 02 and 03) are separate award types, so they're left out of the share; they added another $969.6 billion, including $687.0 billion from the Centers for Medicare and Medicaid Services.

Awarding agency (FY2025)Cooperative agreements (05)Project grants (04)Cooperative agreement share of dollarsShare of awards
All federal agencies46,474 awards, $56.44B276,821 awards, $218.95B20.5%14.4%
CDC851 awards, $2.33B289 awards, $0.25B90.4%74.6%
USAID984 awards, $2.04B438 awards, $0.29B87.7%69.2%
Department of Energy3,818 awards, $13.04B5,484 awards, $7.83B62.5%41.0%
Department of State2,657 awards, $0.70B6,533 awards, $0.56B55.4%28.9%
EPA1,964 awards, $7.00B2,265 awards, $6.18B53.1%46.4%
NSF1,148 awards, $2.60B21,796 awards, $5.58B31.8%5.0%
Department of Justice1,208 awards, $0.17B6,347 awards, $0.53B24.4%16.0%
NIH5,897 awards, $6.69B89,005 awards, $27.24B19.7%6.2%
HRSA0 awards, $0.00B15,983 awards, $10.90B0% recorded0% recorded

Two patterns change how you should read an opportunity. First, at NIH and NSF a cooperative agreement is a big-ticket exception: few awards, much larger dollars per award. Second, the HRSA row is a reporting artifact, not a policy. The type code is whatever the agency reports, and HRSA records its awards as project grants even when the notice says otherwise (more on that near the end of this guide). Net totals also shrink in a year with large deobligations, so treat them as a floor on new money, not a measure of it.

Heavy Cooperative Agreement Users

CDC (Centers for Disease Control and Prevention): CDC uses cooperative agreements "when CDC anticipates substantial involvement," per CDC's grants information page (opens in a new tab). CDC doesn't publish a percentage split on that page, but its USAspending.gov records do: cooperative agreements were 851 of CDC's 1,140 project-type awards with FY2025 activity and 90% of the dollars. CDC's public health mission requires close coordination between federal epidemiologists and state/local health departments. CDC program staff actively participate in defining performance measures, reviewing surveillance data, and approving program modifications. If you're applying to CDC, assume it's a cooperative agreement unless the NOFO says otherwise. For more on how CDC structures its funding, see our CDC grants and cooperative agreements guide.

EPA (Environmental Protection Agency): According to EPA's grants overview (opens in a new tab), EPA awards more than $4 billion a year in assistance agreements, and FY2025 ran far higher: USAspending.gov shows $25.6 billion in net EPA obligations, $12.4 billion of it in formula awards, led by $10.6 billion for the Drinking Water and Clean Water State Revolving Funds. Among EPA's discretionary awards, cooperative agreements carried $7.0 billion, slightly more than project grants. EPA's policy is straightforward: according to EPA's funding instruments page (opens in a new tab), it uses a cooperative agreement when "substantial programmatic involvement is anticipated" and a grant when it isn't.

Department of Energy: DOE isn't usually on grant writers' lists, but it obligated more through cooperative agreements in FY2025 than any other single awarding agency: $13.0 billion across 3,818 awards. About $9.1 billion of that sat in two programs, Clean Energy Demonstrations and Grid Infrastructure Deployment and Resilience.

DOJ Office of Justice Programs: OJP frequently uses cooperative agreements for training and technical assistance programs, demonstration projects, and programs where the agency wants to actively guide implementation across multiple sites.

USAID: USAID historically issued most of its international development awards as cooperative agreements. It ceased independent operations in 2025, and its remaining foreign assistance functions moved to the State Department on July 1, 2025, so check State Department notices for current awards. USAspending.gov (opens in a new tab) still shows $2.04 billion in net USAID cooperative agreement obligations for FY2025, and 55% of the State Department's own project-type dollars went out as cooperative agreements.

Moderate Users

SAMHSA: Uses a mix. Discretionary grants for community-level programs are often standard grants. Larger technical assistance and systems-level programs often use cooperative agreements; Grants.gov (opens in a new tab) lists 86 past SAMHSA notices under the cooperative agreement instrument, though none was open or forecast in October 2026. Its FY2025 USAspending.gov records show only 14 awards coded as cooperative agreements, so don't use those records to judge how a SAMHSA program is run.

HRSA: Similar mix. Many HRSA programs are grants, but cooperative agreements appear in programs requiring close federal-state collaboration, such as the FY2027 State and Regional Primary Care Association cooperative agreements (opens in a new tab) (HRSA-27-014).

Rare Users

NIH (National Institutes of Health): NIH uses cooperative agreements for a small share of its awards: 5,897 of 94,902 project-type awards with FY2025 activity, or 6.2%, though they carried $6.69 billion. The vast majority of NIH research funding goes through standard grant mechanisms (R01, R21, R03, K-series, etc.). NIH reserves cooperative agreements (U-series mechanisms like U01, U10, U19, U54) for large multi-site clinical trials, consortium projects, and collaborative research networks where NIH program staff need to coordinate across sites. If you see a "U" mechanism at NIH, that's a cooperative agreement.

NSF (National Science Foundation): NSF rarely uses cooperative agreements outside of major facility awards, large center grants (like Science and Technology Centers), and a handful of infrastructure programs. That's only 1,148 of its FY2025 awards (5.0%), but because those awards are large they carried $2.60 billion, about 32% of NSF's project-type dollars. The standard NSF research grant is not a cooperative agreement.

Department of Education: Most formula and discretionary programs use standard grants. Cooperative agreements appear mainly in technical assistance programs and select demonstration projects.


How Cooperative Agreements Affect Your Day-to-Day Operations

Here's where the rubber meets the road. If you've only managed standard grants, a cooperative agreement will change your workflow.

More Reporting and Communication

Expect quarterly or even monthly check-ins with your federal program officer. Case in point: the CDC notice of award to New Jersey's Department of Children and Families, specifically a $82,500 budget period on the SUID and SDY Case Registry, commits CDC to send quarterly data reports that are then discussed on a monthly call. That's 12 calls a year on a small award. Many cooperative agreements require:

  • Quarterly progress calls or meetings
  • Semi-annual or quarterly written progress reports (versus annual for most grants)
  • Prior approval for changes that would be routine under a grant
  • Regular submission of program data, not just at reporting periods

Federal Staff in Your Meetings

Under a cooperative agreement, the federal program officer isn't just reviewing your reports. They may attend your team meetings, sit on your advisory board, review your training curricula, or weigh in on which communities you target. This is by design, not overreach.

Slower Decision-Making

When the agency has to approve your work plan, data collection tools, or publications, it adds time. Build federal review time into your project timeline for each approval point, and ask the program officer how long reviews usually take. During government shutdowns, continuing resolutions, or staffing transitions, this can stretch longer.

The Upside: More Federal Support

It's not all burden. A good federal program officer on a cooperative agreement can be a genuine asset. They can connect you with other funded sites doing similar work, share data and best practices from across the portfolio, help you troubleshoot implementation challenges, and advocate for your program within the agency. The CDC award above, for instance, folds in learning collaboratives, expert presentations and peer-to-peer learning as part of CDC's side of the deal.


Implications for Your Budget and Staffing

The cooperative agreement instrument affects how you build your proposal budget, even though the same cost principles and budget categories apply.

Staff Time for Coordination

Budget adequate staff time for federal coordination. This typically means:

  • PI or Project Director time for agency meetings and reviews (budget more effort than you would for a grant)
  • A dedicated project coordinator to manage the relationship, track deliverables, and prepare for agency check-ins
  • Travel to Washington, D.C. or other meeting locations if the agency requires in-person grantee meetings (many cooperative agreements require annual all-grantee meetings)

Equipment and Supply Approvals

Under a cooperative agreement, you may need prior approval for equipment purchases over $10,000 or changes to your approved budget categories. While grants also require prior approval for certain changes, cooperative agreements tend to have additional approval layers specified in the Terms and Conditions.

Indirect Costs

Indirect costs work the same way under both instruments. You'll apply your negotiated rate to your modified total direct costs (MTDC) base. Remember that MTDC includes only the first $50,000 of each subaward; the portion above $50,000 is excluded (2 CFR 200.1 (opens in a new tab)). The instrument type doesn't change your indirect cost rate or how you calculate it. For details on calculating your rate, see our indirect cost rate guide.

Subaward Monitoring

If your project includes subawards, your subrecipient monitoring responsibilities are the same under both instruments. However, under a cooperative agreement, the federal agency may want to review and approve your subawardees or participate in monitoring activities.


When Agencies Choose One Instrument Over the Other

Agencies don't pick the instrument at random, and the FY2025 numbers show it: NIH issued 89,005 standard project grants for investigator-led research but kept 5,897 cooperative agreements for consortia and trials that need cross-site coordination. Internal grants policy offices evaluate several factors:

Factors Favoring a Cooperative Agreement

  • The program involves multi-site coordination where the agency needs to standardize approaches
  • Federal technical expertise is essential to the project's success (e.g., CDC epidemiologists supporting state surveillance systems)
  • The agency needs to redirect activities based on emerging data (common in outbreak response)
  • The program involves sensitive populations or high-risk activities requiring federal oversight
  • The program is a demonstration project and the agency wants to actively shape the model

Factors Favoring a Standard Grant

  • The recipient has the expertise to carry out the work independently
  • The project is investigator-initiated research where federal direction would compromise scientific integrity
  • The agency's role is purely to fund and monitor, not to participate
  • There's no need for cross-site coordination or standardization

The Gray Area

Some programs could go either way. An agency might issue a grant for a program in one fiscal year and switch to a cooperative agreement the next, or vice versa, depending on the program office's assessment of how involved they need to be. When there's ambiguity, some agencies default to cooperative agreements because it gives them more flexibility to engage. Others default to grants to reduce administrative burden on both sides.


Real-World Examples

The terms aren't reserved for huge awards. EPA's FY27 Brownfields Job Training cooperative agreements top out at $300,000 each, and the CDC case registry award in the sample above was $82,500 for one budget period.

Example 1: CDC Immunization Cooperative Agreement

CDC's Immunization and Vaccines for Children program awards cooperative agreements to all 64 state and local immunization programs. Federal involvement includes: CDC provides technical assistance on vaccine storage and handling, reviews immunization coverage data, approves state immunization plans, and can redirect activities during outbreak response. Recipients submit quarterly immunization data and participate in annual grantee meetings.

Example 2: NIH U01 Cooperative Agreement

NIH's U01 mechanism funds collaborative research projects. For a multi-site clinical trial, NIH program staff participate in the steering committee, review protocol amendments, coordinate data sharing across sites, and may have authority to halt enrollment based on interim safety data. NINDS's PAR-25-149 (opens in a new tab) puts this in writing: the NINDS Project Scientist holds one vote on the steering committee, each awardee's PI holds one, and missing the agreed milestones "may result in reduced funding or early termination." Disagreements go to a 3-member panel with one NIH designee, one steering committee designee chosen without NIH staff voting, and a third expert picked by the other two. This level of involvement would be inappropriate for a standard R01 grant.

Example 3: EPA Brownfields Grant vs Cooperative Agreement

EPA's Brownfields program (opens in a new tab) calls them "Brownfield grants," but both assessment and cleanup awards are issued as cooperative agreements. The FY2026 Assessment Coalition notice, for example, offered about $58.7 million for roughly 39 cooperative agreements, and the federal listing names the funding instrument as a cooperative agreement. The EPA project officer approves the work plan and stays involved in the project. It's a good reminder that a program's everyday name ("grant") doesn't tell you the legal instrument: read the NOFO's funding instrument line.


Key Takeaways

  1. The only legal difference between a grant and a cooperative agreement is whether the federal agency anticipates substantial involvement in the funded activity.
  2. Cooperative agreements mean more coordination. Budget additional staff time, build agency review periods into your timeline, and expect more frequent reporting.
  3. Know your agency. CDC put 90% of its FY2025 project-type dollars into cooperative agreements. NIH issues mostly standard grants, with cooperative agreements at about 20% of dollars. The agency's culture shapes your experience.
  4. Read the Terms and Conditions. The NOFO and award document spell out exactly what "substantial involvement" means for your specific award.
  5. It's not a contract. Even under a cooperative agreement, you're the recipient, not a contractor. You retain intellectual property, you have flexibility within your approved budget, and the agency can't direct your day-to-day operations the way they could under a contract.

What the Federal Award Terms Don't Tell You About Cooperative Agreements

A cooperative agreement means your program officer will be involved in your work, and that's not always a good thing. Some program officers are helpful partners who connect you with resources and peer organizations. Others will second-guess your decisions and slow down your work. You won't know which type you're getting until after the award.

Cooperative agreements have higher administrative burden than grants. Expect more frequent reporting, mandatory attendance at grantee meetings, and required participation in cross-site evaluations. No federal source puts a percentage on the extra time, so size it from the involvement list: the $82,500 CDC award in the sample above means 12 monthly calls, 4 quarterly data reports to discuss, and a reverse site visit each year.

The "substantial involvement" clause is unusually vague. Each agency defines it differently, and sometimes individual program officers interpret it differently within the same agency. Read the terms of award carefully before you sign. If the involvement described would interfere with your operations, this is your best chance to push back. EPA's Brownfields Job Training notice, for example, says EPA "will negotiate precise terms and conditions relating to substantial involvement as part of the award process."

What USAspending.gov Doesn't Tell You

The award type in federal spending data is self-reported by each agency, and it isn't always the instrument on the award. HRSA's FY2027 Primary Care Association notice is listed on Grants.gov (opens in a new tab) as a cooperative agreement under Assistance Listing 93.129, yet 197 awards under 93.129 with FY2025 activity carry the project grant code (04) and none carries the cooperative agreement code (05) on USAspending.gov (opens in a new tab), and HRSA recorded no cooperative agreements at all that year. If you're studying past winners to plan a budget, a red flag is any agency with zero or near-zero type 05 awards: read a past notice of award or NOFO instead of trusting the code.

Why the "Substantial Involvement" Clause Changes Everything

A common mistake is treating cooperative agreements and grants as interchangeable when building a proposal budget, and it can cost an organization real money in year one. The "substantial involvement" clause in a cooperative agreement means the federal agency isn't just monitoring your progress from a distance. They're participating in your program decisions, reviewing your work plans before you can execute them, and sometimes redirecting your activities based on their own priorities. How much varies by award, not just by agency. In the 3 documents Grantsights checked, CDC's involvement was a meeting and data-review rhythm, NIH's was a steering committee vote and milestone-linked funding, and EPA's reached into procurement review and key personnel approval.

A team that budgets federal coordination time from one cooperative agreement can underestimate the next one, even at the same agency. One award may expect frequent calls with the program officer, regular data submissions, prior approval on community-facing materials, and participation in a national learning collaborative, while another asks for little beyond an annual meeting. Once the award is made, the budget is locked into the approved spending plan, so any extra coordination time has to come from other funds.

If you're responding to a cooperative agreement NOFO, read the Terms and Conditions section with extreme care before you finalize your budget. Count every approval point, every required meeting, and every data submission that will require staff preparation time. Then budget accordingly. Budget more personnel time for coordination than you would for a standard grant from the same agency, and on larger awards with monthly calls and quarterly data reviews, consider a dedicated coordination role. The federal program officer relationship can be genuinely valuable when it works well, but only if you've staffed for it from day one.


How Grantsights Checked This Guide

Grantsights checked 31 USC 6303 through 6305, the 2 CFR 200.1 definitions, Grants.gov (opens in a new tab) policy guidance, CDC and EPA grant guidance, FY2025 award data covering $275.4 billion in project-type obligations from the public USAspending.gov (opens in a new tab) API, and 3 award documents (one CDC notice of award, one NIH U01 notice, one EPA notice) in October 2026. Where official sources stop: they define grants, cooperative agreements, and contracts, but they don't show how the instrument choice changes staffing, review time, and work-plan control. That's what the agency table and the 3-document sample are for.

Source checkedWhat it confirmsApplicant decision
31 USC 6304 (opens in a new tab)Grant instrument when substantial federal involvement is not expectedExpect standard oversight, not day-to-day direction
31 USC 6305 (opens in a new tab)Cooperative agreement instrument when substantial federal involvement is expectedBudget staff time for agency review and technical direction
Grants.gov policy summary (opens in a new tab)Federal Grant and Cooperative Agreement Act frameworkConfirm the route before designing governance
2 CFR 200.1 (opens in a new tab)Grant agreement and cooperative agreement definitions, including pass-through relationshipsCheck whether your pass-through entity, not just the federal agency, will be involved
EPA funding instruments (opens in a new tab)EPA uses a cooperative agreement when substantial programmatic involvement is anticipatedRead terms before assuming autonomy
USAspending.gov (opens in a new tab) FY2025 award dataCooperative agreement share of project-type dollars and awards by agencyExpect involvement terms at CDC, EPA, DOE and State; check the notice at HRSA and SAMHSA

According to 31 USC 6304, a grant is used when no substantial federal involvement is expected during performance. According to 31 USC 6305, a cooperative agreement is used when substantial federal involvement is expected. According to Grants.gov's policy summary (opens in a new tab), the same 1977 Act separates grants, cooperative agreements, and procurement contracts. Grantsights analysis of FY2025 USAspending.gov records found that cooperative agreements carried $56.4 billion, or 20.5% of project-type obligations, but ranged from 90.4% of dollars at CDC to 19.7% at NIH, so the agency you apply to tells you more about the likely instrument than the program name does (EPA still calls its Brownfields cooperative agreements "grants"). Within the instrument, the 3-document sample shows the practical burden comes from the involvement list (call cadence, votes, approvals), which is why it belongs in your budget narrative.

Bad fit check: a cooperative agreement is the wrong route if your timeline cannot absorb federal review of work plans, data tools, or key milestones. For example, a 6-month pilot that needs weekly product decisions may stall if every protocol change needs agency clearance. A 3-year public health demonstration with a CDC technical officer, quarterly work-plan review, and shared performance measures may fit the cooperative model well. Pair this guide with 2 CFR 200 compliance, allowable costs, federal grant budget categories, and current grant opportunities.

Sources

Frequently Asked Questions

What is the legal difference between a grant and a cooperative agreement?

The legal difference comes from the Federal Grant and Cooperative Agreement Act of 1977, codified at 31 USC 6304 and 6305. Both instruments transfer funds from a federal agency to a non-federal entity for a public purpose. The sole legal distinction is the anticipated level of federal involvement. Under 31 USC 6304, a grant is used when no substantial involvement by the federal agency is expected beyond standard oversight. Under 31 USC 6305, a cooperative agreement is used when the agency anticipates substantial involvement in carrying out the funded activity. The agency decides which instrument to use before issuing the notice of funding opportunity.

What does substantial involvement mean in a cooperative agreement?

Substantial involvement means the federal agency will actively participate in the funded project beyond normal grant monitoring. This can include approving work plans before activities begin, collaborating on research design or protocol development, reviewing and approving key project decisions, providing technical assistance that shapes program direction, and having federal staff participate directly in project activities. Each cooperative agreement's terms and conditions spell out exactly what the agency's role will be. Normal grant monitoring activities like reviewing financial reports and conducting site visits do not count as substantial involvement.

Does a cooperative agreement give you less control over your project?

Yes, compared to a standard grant. With a cooperative agreement, the federal program officer has an active role in project decisions. They may need to approve changes to your work plan, review data collection instruments before you use them, participate in key project meetings, or sign off on milestones before you can move to the next phase. This doesn't mean the agency runs your project, but it does mean you'll need to build agency review time into your timelines, respond to technical direction, and coordinate more closely with your program officer. Some recipients find this helpful because they get expert federal input. Others find it slows down their work.

Which federal agencies use cooperative agreements most often?

CDC relies heavily on cooperative agreements, using them whenever it anticipates substantial involvement, which covers most of its funding to state, local, and territorial health departments. USAspending.gov records for FY2025 put cooperative agreements at about 90% of CDC's net project-type obligations ($2.33 billion of $2.58 billion), 88% of USAID's, 63% of the Department of Energy's, and 53% of EPA's, including Brownfields assessment and cleanup awards. The Department of Justice's Office of Justice Programs uses them for many technical assistance and demonstration programs. USAID was historically a heavy user, but it ceased independent operations in 2025 and its remaining foreign assistance functions moved to the State Department. NIH uses cooperative agreements for about 6% of its awards (the U-series, such as U01 and U54) but those awards carried about 20% of its FY2025 project-type dollars. NSF is similar: about 5% of awards, mostly large facility and center agreements, but about 32% of dollars.

Can a cooperative agreement be converted to a grant or vice versa?

It's extremely rare. The determination of whether to use a grant or cooperative agreement is made by the agency before publishing the NOFO, based on whether substantial involvement is anticipated. Once an award is made under one instrument, it generally stays that way for the life of the award. However, if an agency restructures a program and issues a new NOFO for continuation funding, it could change the instrument type. You can't request a conversion, and the instrument type isn't negotiable during the application or award process. The agency's internal grants policy office or Office of Acquisition Management typically makes the instrument determination.

Last updated October 18, 2026. Corrected October 18, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.