DOT Grants Guide 2026: RAISE, INFRA, SS4A & More
Updated 24 official sources
Quick Answer: DOT's biggest competitive grant rounds for FY2026 have closed, and most are awarded: BUILD (formerly RAISE) gave $1.73 billion to 127 projects on July 7, 2026, and INFRA awarded about $626 million in October 2026.
Full answer and how we checked it
Safe Streets and Roads for All (SS4A) closed May 26, 2026, and DOT posted 297 FY2026 awards worth $1.01 billion at the end of October 2026. This guide is for cities, counties, transit agencies, tribes, ports, MPOs, and nonprofits that partner with them. Most programs need a 20% local match, and P.L. 119-103 extends IIJA's surface transportation authorities only to December 11, 2026.
Data note: Amounts may shift with annual appropriations. Program amounts, deadlines, award announcements, and federal shares were rechecked on October 20, 2026 against DOT, FTA, FAA and MARAD program pages, DOT's published BUILD award and application spreadsheets, Grants.gov listings, P.L. 119-103, Congress.gov, and 49 U.S.C. 5339, 47109 and 48103.
Source review by Grantsights, October 20, 2026: Grantsights checked DOT's BUILD, INFRA, SS4A, FTA bus, MARAD port, FAA airport, and FHWA pages, the FY2026 BUILD notice, Grants.gov (opens in a new tab) listings, and DOT press releases through October 19, 2026 against this guide. Where official sources stop: DOT explains each program, but it doesn't tell a local sponsor whether a project belongs in BUILD, INFRA, SS4A, FTA formula, FAA AIP, state highway suballocation, or a planning grant first. The FY2026 BUILD win rates in the analysis section below are one way to answer that.
In this guide
- DOT Grant Status in October 2026: Open, Closed, or Awarded
- DOT Competitive Grant Programs: The Big Three
- Grantsights Analysis of FY2026 BUILD Applications and Awards
- FTA Transit Grant Programs
- FAA Airport Improvement Program (AIP)
- Federal Highway Formula Funds
- NEPA and Environmental Review Requirements
- Grant Management Systems You'll Need to Know
- Local Match Requirements by Program
- IIJA Expiration: The Extension to December 11, 2026
- Tips for Winning DOT Competitive Grants
- What DOT Grant Program Pages Don't Tell You
- Related Guides
- Sources
The U.S. Department of Transportation is the largest infrastructure funder in the federal government, distributing more than $100 billion annually through a mix of formula programs (money allocated by population, road miles, and other metrics) and competitive discretionary grants (money you apply for directly).
If you're a state or local transportation agency, a transit authority, a port, a tribal government, or a planning organization seeking federal infrastructure funding, this guide covers DOT's major competitive and formula grant programs. Nonprofits usually come in as partners: Kawerak, Inc., listed in DOT's award file as a 501(c)(3), won a $3.97 million FY2026 BUILD planning grant for the Elim Subsistence Harbor in rural Alaska, but most DOT money goes to public sponsors. For a broader view of what local governments can apply for, see our federal grants for local governments guide.
DOT funding is some of the most complicated in the federal system. Money moves through multiple sub-agencies (FHWA, FTA, FAA, FRA, MARAD, PHMSA), uses different application systems, and follows different rules depending on whether it's a formula allocation or a competitive grant.
Here's what you need to know: FY2026 was the last full year of the Infrastructure Investment and Jobs Act (IIJA), which added $550 billion in new infrastructure spending over five years, and a short-term extension now carries its authorities to December 11, 2026. According to the DOT IIJA Funding Status page (opens in a new tab), much of this money has been allocated but not all of it has been spent. Programs created or expanded by IIJA, including several competitive grant programs, face an uncertain future after the extension ends.
This guide covers every major DOT grant program, who can apply, how much is available, and the practical steps to put together a winning application.
DOT Grant Status in October 2026: Open, Closed, or Awarded
As of October 20, 2026, none of the 8 program pages below listed an open notice. Here's where each stands, with the official source for each line.
| Program | Latest round | Status on October 20, 2026 | Official source |
|---|---|---|---|
| BUILD (formerly RAISE) | $1.73 billion, 127 projects | Closed February 24, 2026; awarded July 7, 2026; no FY2027 notice posted | DOT BUILD page (opens in a new tab) |
| INFRA Track 1 | About $426.7 million | Closed July 1, 2026; awarded October 1, 2026 (12 states) | DOT press release (opens in a new tab) |
| INFRA Track 2 (truck parking) | $200 million | Closed July 15, 2026; awarded October 14, 2026 (14 projects, 12 states) | DOT press release (opens in a new tab) |
| Safe Streets and Roads for All | About $993.5 million | Closed May 26, 2026; FY2026 selections not posted | SS4A page (opens in a new tab) |
| FTA Bus and Low-No | About $610 million | Closed September 21, 2026; selections pending | FTA Low-No page (opens in a new tab) |
| CRISI (rail) | FY2025-2026 notice, $2.34 billion | Awarded October 19, 2026 (105 projects, 45 states and DC) | FRA CRISI page (opens in a new tab) |
| Port Infrastructure Development | $488.6 million | Closed June 1, 2026; FY2026 selections not posted | MARAD PIDP page (opens in a new tab) |
| Reconnecting Communities Pilot | No newer notice listed | Awards listed only for FY2022 to FY2024; notice page last updated July 10, 2024 | DOT RCP page (opens in a new tab) |
The practical read: there's no DOT discretionary deadline to chase this fall. The next BUILD, SS4A, and INFRA rounds depend on what Congress passes before the December 11, 2026 extension date, so this is the window for design, NEPA, cost estimates, and match commitments. You can track new notices for free in the Grantsights grant search.
Get grant deadline alerts by email
About once a week, we email a short list of open grant calls with real deadlines from different funders. It isn't limited to the programs in this guide.
No spam. Unsubscribe anytime.
DOT Competitive Grant Programs: The Big Three
These are the programs most people think of when they hear "DOT grants." They're open to direct competition, they fund specific projects, and together they awarded more than $2.3 billion in FY2026 BUILD and INFRA money alone.
BUILD Grants (Formerly RAISE, Formerly TIGER)
This program has been renamed three times, which tells you something about how politicized transportation funding can be. According to the BUILD program page (opens in a new tab), it started as TIGER under the 2009 Recovery Act, ran on annual appropriations until IIJA authorized it in November 2021, and has carried the RAISE and now BUILD names. DOT's BUILD spreadsheets label rounds TIGER through 2017, BUILD from 2018 to 2020, RAISE from 2021 to FY2025 Round 1, and BUILD again from FY2025 Round 2. The FY2026 BUILD NOFO (opens in a new tab) was published in December 2025.
FY2026 selections: DOT announced $1.73 billion for 127 projects on July 7, 2026, and the round is fully awarded. Per the FY2026 BUILD NOFO, applications were due through Valid Eval by 5:00 p.m. Eastern on February 24, 2026, and the notice offered at least $1.5 billion in FY2026 IIJA funds plus any money from "recently cancelled or withdrawn RAISE projects."
What it funds: Surface transportation capital projects (highways, bridges, transit, passenger and freight rail, ports, and intermodal facilities) and planning, design, and pre-construction work for those projects. Projects must have a significant local or regional impact.
Who can apply: Per the FY2026 BUILD NOFO, eligible applicants are states and the District of Columbia, territories, units of local government, public agencies or publicly chartered authorities, special purpose districts and port authorities, federally recognized tribes or tribal consortia, transit agencies, and multi-jurisdictional groups of eligible entities. Regional bodies win too: in FY2026 the San Luis Valley Council of Governments in Colorado received $7.05 million for the La Veta Pass Rail Project, and the Mid-America Regional Council in Missouri received $9.06 million for I-29 corridor planning.
Award range: The maximum is $25 million. The minimum request for a capital project is $1 million in a rural area and $5 million in an urban area, and planning projects have no minimum. The FY2026 notice also capped both rural and urban projects at no more than 50% of the funds ($750 million each), set at least 5% ($75 million) aside for planning projects, and limited any one state to 15% ($225 million).
Local match: The federal share can't exceed 80% for urban projects. Projects in rural areas, Areas of Persistent Poverty, or Historically Disadvantaged Communities can be funded up to 100% federal. An urban project outside those designations that asks for more than 80% federal funding is ineligible. For BUILD, "urban" means inside a 2020 Census urban area with more than 200,000 people; everything else is rural.
Next round: DOT hadn't posted an FY2027 BUILD notice as of October 20, 2026. The FY2026 notice says unfunded applications that reached the Highly Rated list become "Projects of Merit" and carry into FY2027 BUILD, "subject to authorization and appropriation." DOT's FY2026 application file flags 232 of the 1,198 eligible applications that way.
Key tip: The FY2026 notice scored projects on safety, environmental sustainability, quality of life, mobility and community connectivity, economic competitiveness and opportunity, state of good repair, partnership and collaboration, and innovation. A capital project needed a Medium or High benefit-cost rating and a construction start within 18 months to reach the Highly Rated list. Don't just say your project will reduce congestion. Estimate the dollar value of travel time savings using DOT's published value of time figures.
INFRA Grants
The Nationally Significant Multimodal Freight and Highway Projects program, known as INFRA, funds large-scale freight and highway projects of national or regional significance. According to the INFRA program page (opens in a new tab), this program prioritizes projects that improve the movement of freight and people.
FY2026 funding and awards: According to the INFRA listing on Grants.gov (opens in a new tab) (NSMFHP-26-INFRA, posted June 2, 2026), DOT intended to use about $626.7 million: $319.8 million in FY2023 INFRA funds, $106.9 million in FY2024 INFRA funds, and $200 million in FY2026 commercial motor vehicle parking funds. Track 1 closed July 1, 2026, and Track 2 (truck parking) closed July 15, 2026. DOT announced $426 million for Track 1 projects in 12 states on October 1, 2026, including $85 million to the Florida DOT for I-4 lanes in Seminole and Volusia Counties and $11.3 million to the City of Savannah for a connector from I-516. On October 14, 2026, it announced $200 million for 14 truck parking projects, including $24.5 million to the Iowa DOT for I-80 rest areas and $11.95 million to the Georgia Ports Authority.
What it funds: Highway and freight projects on the National Highway Freight Network or National Highway System, plus freight rail, port, grade crossing, wildlife crossing, and border crossing projects. Large projects generally must cost at least $100 million or a set share of the state's highway apportionment (check the NOFO for the exact test), though smaller projects of $5 million or more can also compete.
Who can apply: States, MPOs serving urbanized areas over 200,000 people, local governments, political subdivisions, tribal governments, special purpose districts and port authorities, federal land management agencies applying with a state, and multistate corridor organizations.
Federal share: Up to 60% of project costs from INFRA funds. Total federal assistance (including other federal programs) can't exceed 80% of project costs.
Key tip: INFRA heavily weights project readiness. Applications with completed NEPA reviews, secured non-federal match, and engineering at 30% or higher design stage are in a far better position than conceptual projects.
Safe Streets and Roads for All (SS4A)
IIJA created SS4A with $5 billion in appropriated funds over FY2022 to FY2026. It funds local safety improvements with the goal of eliminating roadway fatalities and serious injuries. According to the SS4A program page on transportation.gov (opens in a new tab), the FY2022 through FY2025 rounds provided $3.9 billion to more than 2,000 communities in all 50 states and Puerto Rico.
FY2026 funding: About $993.5 million and roughly 500 awards, with an award floor of $100,000 and a ceiling of $25 million, according to the Grants.gov listing (opens in a new tab) and the FY2026 SS4A NOFO (opens in a new tab).
Two grant types:
- Planning and Demonstration grants (the notice's overall award floor is $100,000): Fund the development of a safety action plan for your jurisdiction, or supplemental planning and demonstration work. They need the same 20% local match as implementation grants. At least 30% of FY2026 SS4A funds must go to action plan grants.
- Implementation grants (up to the FY2026 ceiling of $25 million): Fund specific safety infrastructure projects identified in an existing action plan. Require a 20% local match.
Who can apply: MPOs, cities, counties, towns, special districts, certain transit agencies, other political subdivisions of a state or territory, and federally recognized tribes. States themselves aren't eligible.
FY2026 status: Closed May 26, 2026 at 5:00 p.m. EDT. Applications went through Valid Eval, not Grants.gov (opens in a new tab). DOT's FY2026 SS4A awards page (opens in a new tab), last updated October 30, 2026, lists 297 awards totaling $1,012,969,919: 197 Planning and Demonstration Grants ($329,291,958) and 100 Implementation Grants ($683,677,961). Grantsights rechecked this section against that page and the FY2026 NOFO's cost-sharing section on November 6, 2026.
Key tip: You must have a qualifying action plan before you can apply for an implementation grant. If your jurisdiction doesn't have one yet, a planning grant is the first step, and an implementation grant would come in a later round (assuming the program is reauthorized). Many jurisdictions adopted "Vision Zero" plans that satisfy the action plan requirement.
Grantsights Analysis of FY2026 BUILD Applications and Awards
DOT publishes two spreadsheets on its BUILD page (opens in a new tab): every eligible application since 2009 and every award since 2009. Grantsights matched each of the 127 FY2026 awards in the TIGER 2009 to BUILD 2026 awards file (opens in a new tab) to its row in the eligible applications file (opens in a new tab) (1,198 FY2026 rows) by project name, then compared win rates by applicant type, urban or rural label, size of request, and the share of project cost requested from BUILD.
Grantsights analysis of the FY2026 BUILD files found that 127 of 1,198 eligible applications won (10.6%). Applications offering more than 20% non-federal money won about twice as often as those asking BUILD to pay everything, and state applicants won nearly three times as often as cities and towns.
| FY2026 BUILD applicant group | Eligible applications | Awards | Win rate |
|---|---|---|---|
| State DOTs and state agencies | 120 | 27 | 22.5% |
| Regional organizations and MPOs | 53 | 10 | 18.9% |
| Special districts and port authorities | 73 | 9 | 12.3% |
| Counties | 258 | 25 | 9.7% |
| Cities and towns | 582 | 48 | 8.2% |
| Federally recognized tribal governments | 62 | 1 | 1.6% |
| Asked BUILD for less than 80% of project cost | 386 | 57 | 14.8% |
| Asked BUILD for 80% to 99% of project cost | 377 | 40 | 10.6% |
| Asked BUILD to pay 100% of project cost | 435 | 30 | 6.9% |
| Labeled urban on the application | 443 | 72 | 16.3% |
| Labeled rural on the application | 748 | 55 | 7.4% |
Three findings change how a local sponsor should approach BUILD:
Rural applications won at less than half the urban rate, even with up to 100% federal share available. Using the urban or rural label on each application, rural projects made up 62% of eligible FY2026 applications, but the notice caps rural projects at no more than half the money. DOT's award file labels 59 FY2026 awards rural ($850.8 million) and 68 urban ($887.1 million), so the dollars split close to evenly while rural applications outnumbered urban ones 748 to 443.
Asking BUILD to pay for everything was a red flag in the results. The FY2026 notice says the Secretary may prioritize projects that "have a higher percent of non-federal funding committed." Applications asking BUILD to cover the whole cost won 6.9% of the time, and those asking for less than 80% won 14.8%. These are win rates, not scores, and DOT doesn't publish application ratings, so the gap also reflects project size and readiness. But rural sponsors who can offer some match shouldn't assume asking for 100% is free.
Planning grants are a real door for small sponsors. 47 of the 127 FY2026 awards (37%) were planning grants, with a median of $2.5 million and $169.6 million in total, more than double the $75 million planning floor. The median capital award was $23.4 million. Small winners included the City of Perry, Oklahoma ($3.44 million planning grant), the Municipality of Barceloneta, Puerto Rico ($1.2 million for complete streets design), the City of Cambridge, Maryland ($1.15 million planning grant), and the Port Isabel San Benito Navigation District in Texas ($330,000 to plan a mobile boat lift). For example, Tontitown received $17.57 million for the Barrington Road reconstruction in Arkansas, and the City of Milan, Missouri received $9.37 million for a multimodal and stormwater project.
What this means for a small local project: a bad fit for BUILD capital money is a small local project with no NEPA progress, no committed match, no benefit-cost support, and no state DOT backing. In FY2026, that profile lined up with the groups that won least often. If that's your project, consider a BUILD planning grant, an SS4A planning grant, or state sub-allocation first. For example, a rural intersection safety project with no action plan may fit SS4A planning before BUILD, while a freight corridor with 30% design and secured match is closer to INFRA readiness. Tribal governments filed 62 eligible FY2026 BUILD applications and won one (the Native Village of Eyak, $6.86 million for Shepard Point port planning in Alaska); our grants for Native American tribes guide covers other federal routes for tribal governments, including DOT's formula-based Tribal Transportation Program.
FTA Transit Grant Programs
The Federal Transit Administration runs both formula and competitive programs. Its FY2026 bus notice put about $610 million up for competition, and the formula programs move several times that each year.
Section 5307: Urbanized Area Formula Grants
This is FTA's largest program by dollar amount. It provides formula funding to transit agencies in urbanized areas (populations over 50,000) for capital, operating, and planning expenses.
Annual funding: Approximately $6 billion under IIJA.
How it works: Funding is allocated by formula based on population, population density, transit route miles, and ridership data. For urbanized areas with populations over 200,000, the designated recipient is typically the transit agency. For urbanized areas between 50,000 and 200,000, the state DOT is the designated recipient.
Federal share: 80% federal, 20% local match for capital expenses. 50% federal, 50% local match for operating expenses (operating assistance is only available to transit agencies in areas under 200,000 population).
Application system: Transit agencies apply through the Transit Award Management System (TrAMS) (opens in a new tab), FTA's online grant management portal.
Section 5339: Bus and Bus Facilities
This program funds the purchase and rehabilitation of buses and bus-related equipment and facilities. It has both a formula component and a competitive component.
Formula component: Allocated to states and designated recipients based on formulas. Under 49 U.S.C. 5339(a) (opens in a new tab), each state receives $4,000,000 per fiscal year (each territory $1,000,000) before the population and service factor distribution.
Competitive component: Transit agencies apply for larger capital projects like maintenance facilities and bus replacements. According to the FTA bus program pages (Low-No page (opens in a new tab)), FTA announced the FY2026 notice for both bus programs on July 27, 2026, with about $610 million available (about $21 million for Bus and Bus Facilities and about $589 million for Low-No), and applications were due September 21, 2026. FTA's previous selections were about $390 million for 34 bus projects in 19 states and Puerto Rico, announced February 20, 2026.
Federal share: The statute sets capital grants at 80% of net capital costs, so plan on a 20% local match. It has no separate 90% rural share.
Low or No Emission Vehicle Program (Low-No)
This competitive program (49 U.S.C. 5339(c)) funds the purchase or lease of zero-emission and low-emission transit buses, plus supporting facilities like charging infrastructure. It predates IIJA (FTA lists selections back to FY2016), and FTA cites IIJA section 30018 and Division J among its current statutory references. FTA announced about $2 billion in combined Low-No and bus selections for 165 projects in 45 states and the District of Columbia on November 20, 2025.
Who can apply: Direct or designated recipients of FTA grants, states, local governmental authorities, and Indian tribes. Except for tribal projects, proposals for rural (non-urbanized) areas must be submitted as part of a consolidated state proposal.
Federal share: Up to 85% of the cost of a bus, and 90% for low- or no-emission bus equipment and facilities. Projects involving zero-emission vehicles must also spend 5% of the award on workforce development and training unless the applicant certifies a lower need.
FAA Airport Improvement Program (AIP)
The Federal Aviation Administration's AIP provides grants for airport planning and development projects at public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).
Annual funding: 49 U.S.C. 48103 (opens in a new tab) makes $4.0 billion available for each of FY2025 through FY2028, up from $3.35 billion a year through FY2024. Airports receive entitlement funding each year based on passenger volume, and FAA adds discretionary money when a project needs more.
What it funds: Runway construction and rehabilitation, taxiway improvements, airport lighting and signage, noise mitigation, land acquisition for airport development, and certain terminal building projects. AIP does not fund revenue-producing areas of terminals (gates, concessions, parking) at large airports.
Who can apply: Airport sponsors, which include cities, counties, airport authorities, state aeronautical agencies, and tribal governments that own and operate public-use airports.
Federal share: Under 49 U.S.C. 47109(a) (opens in a new tab), 75% for medium and large hub airports and 90% for any other airport. A 95% share applies only to certain successive phases of multiphase projects that received a grant in FY2011. Equipment costing more than $10,000 must be tracked and managed according to federal property standards.
Application process: Airport sponsors work directly with their FAA regional office. AIP applications don't go through the federal grants portal. Your regional FAA Airports Division office is your primary point of contact.
Federal Highway Formula Funds
While these aren't competitive grants in the traditional sense, Federal Highway Administration (FHWA) formula programs represent the single largest category of DOT funding and deserve attention.
IIJA provides approximately $350 billion for federal highway programs over five years (FY2022 through FY2026), according to the FHWA IIJA funding page (opens in a new tab). Most of this money is apportioned to states based on formulas.
Key formula programs:
- National Highway Performance Program (NHPP): Funds condition and performance improvements on the National Highway System. About $29 billion annually.
- Surface Transportation Block Grant (STBG): The most flexible federal highway program. States and MPOs can use these funds for almost any surface transportation project. About $14 billion annually.
- Highway Safety Improvement Program (HSIP): Dedicated to reducing traffic fatalities and serious injuries. About $3 billion annually.
- Carbon Reduction Program: Created by IIJA, funds projects that reduce transportation emissions. About $1.2 billion annually.
- PROTECT Program: Funds projects that improve infrastructure resilience to natural disasters and climate impacts. About $1.4 billion annually.
How local governments access these funds: Formula money goes to state DOTs, not directly to local governments. To access these funds, local agencies must work with their state DOT or MPO. Many states have competitive sub-allocation processes where local agencies apply to the state for a share of federal formula funds. Check with your state DOT's local programs division.
NEPA and Environmental Review Requirements
Every DOT-funded project must comply with the National Environmental Policy Act (NEPA). A full Environmental Impact Statement can take 2 to 5 years, which makes NEPA one of the biggest factors in project timelines and costs.
Three levels of review:
- Categorical Exclusion (CE): For projects with no significant environmental impact, like routine maintenance, small-scale safety improvements, or equipment purchases. Processing time: weeks to a few months.
- Environmental Assessment (EA): For projects where the environmental impact is uncertain. Requires public comment and can result in either a Finding of No Significant Impact (FONSI) or a requirement for a full EIS. Processing time: 6 to 18 months.
- Environmental Impact Statement (EIS): For major projects with significant environmental impacts, like new highway construction or major transit expansions. Requires extensive public involvement and detailed analysis of alternatives. Processing time: 2 to 5 years, sometimes longer.
Practical advice: Start NEPA early and separately from your grant application. You can begin NEPA review with your own funds or state funds before applying for federal money. The FY2026 BUILD notice asked capital applicants to show they could start construction within 18 months of selection, which is hard to promise without a completed or well-advanced NEPA review.
Grant Management Systems You'll Need to Know
DOT doesn't use a single application system. Its grant-making agencies, including FHWA, FTA, FAA, FRA, and MARAD, run their own processes, and the FY2026 BUILD and SS4A notices, worth $1.5 billion and $993.5 million, both took applications through Valid Eval instead of the federal grants portal.
TrAMS (Transit Award Management System): FTA's grant management system for all transit grants. You'll submit applications, manage awards, and report through TrAMS. It replaced the older TEAM system. Find it at transit.dot.gov/TrAMS (opens in a new tab).
Grants.gov (opens in a new tab) and Valid Eval: DOT posts its discretionary notices on the federal grants portal, but the submission system varies by notice. The FY2026 SS4A listing said applicants "must submit their applications via Valid Eval," and the FY2026 BUILD notice used Valid Eval too. Read each NOFO's submission section before you register, and keep an active registration with an authorized organization representative for notices that do use Grants.gov.
FHWA systems: Federal highway formula programs are managed through the Fiscal Management Information System (FMIS). State DOTs interact with FMIS directly. Local agencies work through their state DOT.
FAA systems: AIP applications go through FAA's regional offices, not through an online portal. Your regional FAA Airports Division coordinates the application and review process.
For all DOT programs, your organization needs an active SAM.gov registration and a Unique Entity Identifier (UEI).
Local Match Requirements by Program
Match requirements run from 0% for rural BUILD projects to 40% or more for INFRA. Here's a summary of the major programs:
| Program | Federal Share | Local Match | Notes |
|---|---|---|---|
| BUILD/RAISE (urban) | Up to 80% | 20% minimum | Above 80% makes an urban application ineligible |
| BUILD/RAISE (rural or APP/HDC) | Up to 100% | None required | Offering match still helped win rates in FY2026 |
| INFRA | Up to 60% | 40%+ | Total federal assistance capped at 80% |
| SS4A (Planning) | Up to 80% | 20% minimum | Tribes can count Tribal Transportation Program funds as match |
| SS4A (Implementation) | Up to 80% | 20% minimum | |
| FTA 5307 (Capital) | 80% | 20% | |
| FTA 5307 (Operating) | 50% | 50% | Only for areas under 200K population |
| FTA 5339 | 80% | 20% | Statutory capital share |
| FTA Low-No (buses) | Up to 85% | 15% | 90% for related equipment and facilities |
| AIP (Medium and Large Hubs) | 75% | 25% | 49 U.S.C. 47109(a)(1) |
| AIP (All Other Airports) | 90% | 10% | 95% only for certain multiphase projects |
What counts as match: State funds, local tax revenue, bond proceeds, private donations, toll credits, and in-kind contributions like donated right-of-way or volunteer services. Other federal funds generally can't be used as match unless a specific statute allows it. A common mistake is counting money that isn't committed yet. The FY2026 BUILD notice favors non-federal funding that's "committed," and its readiness review checks the financial completeness of project funding, so an adopted budget line is stronger than a letter promising future council approval. Our cost sharing and matching guide covers documentation in more detail.
IIJA Expiration: The Extension to December 11, 2026
The Infrastructure Investment and Jobs Act authorized DOT programs through September 30, 2026. According to the Surface Transportation Extension Act of 2026 (opens in a new tab) (Division C of P.L. 119-103, signed September 2, 2026), those authorities continue for a 72-day extension period that ends on December 11, 2026. The covered laws include IIJA's highway, safety, and transit divisions and chapter 67 of title 49, where BUILD is codified.
Where reauthorization stands: The House Transportation and Infrastructure Committee ordered the BUILD America 250 Act (H.R. 8870 (opens in a new tab)) reported by a 62-2 vote on May 22, 2026. Congress.gov listed that committee vote as the latest action as of October 20, 2026, so the bill hadn't passed the House or Senate. Before December 11, Congress needs to pass a reauthorization or another extension.
What's at stake: If Congress doesn't act by December 11, 2026, program authorities would need new legislation; there's no automatic reversion to pre-IIJA funding levels. Competitive programs created by IIJA, including SS4A, Carbon Reduction, and PROTECT, depend on reauthorization or new authority after the current period. Funding levels in a new bill could differ from IIJA's.
What's already changed: The FY2026 BUILD notice let DOT re-award money from "recently cancelled or withdrawn RAISE projects," so some earlier RAISE awards were cancelled or withdrawn. DOT's Reconnecting Communities Pilot page lists awards only for FY2022 through FY2024. If you hold an older award, keep your grant agreement milestones current. Check DOT's IIJA funding status page (opens in a new tab) for what remains available in a given program.
What to do now: The FY2026 BUILD, INFRA, SS4A, and FTA bus rounds have all closed, so use this period to finish NEPA work, design, and match commitments for the next notices. Our IIJA infrastructure grants guide tracks the IIJA programs outside DOT, and our state grants guide covers state-level alternatives.
Tips for Winning DOT Competitive Grants
DOT's FY2026 BUILD files show 1,071 eligible applications that didn't win, so the details below matter.
Quantify everything. DOT reviewers want numbers. Don't say "this project will reduce crashes." Say "based on 5-year crash data, this intersection averages 12 injury crashes per year, and the proposed roundabout is expected to reduce injury crashes by 72% based on FHWA CMF data, preventing approximately 8.6 injuries annually." Use the FHWA Crash Modification Factors Clearinghouse (opens in a new tab) for evidence-based safety estimates.
Show project readiness. Readiness is scored directly, so a good project that can't move quickly is at a disadvantage. Complete your NEPA review, get to at least 30% design, secure your local match commitment in writing, and have a realistic construction timeline. BUILD's Highly Rated list in FY2026 required a construction start within 18 months of selection for capital projects.
Build multi-modal connections. BUILD's merit criteria include mobility and community connectivity, so a highway project that also improves transit access, bike infrastructure, and pedestrian safety has more to show reviewers than a highway-only project.
Get letters of support. Letters from your state DOT, your governor's office, your congressional delegation, your MPO, and affected communities show broad buy-in. State DOTs won 22.5% of their FY2026 BUILD applications, so a state partner on the application, not just a letter, is worth asking for. Our guide on how to write a letter of support for a grant covers what makes a letter specific.
Apply again if you don't win. Grantsights compared applicant names across DOT's files: at least 96 of the 127 FY2026 BUILD winners (76%) had filed an eligible TIGER, BUILD, or RAISE application under the same applicant name, in the same state, in an earlier round. That's a floor, since name spellings vary between years. DOT offers debriefs to applicants not selected; ask for one. For general advice on strengthening a resubmission, check our grant rejection reasons guide.
What DOT Grant Program Pages Don't Tell You
DOT's program pages list eligibility and amounts. Here's what they leave out, based on the FY2026 BUILD files and notices.
Honest friction: BUILD odds are low, and they differ sharply by who applies. Only 10.6% of eligible FY2026 BUILD applications won, and cities and towns won 8.2% of theirs. Application development is expensive: a benefit-cost analysis, cost estimates no older than a year, and a project readiness file. For a city with no design work, no match, and no state partner, the expected return on a BUILD capital application is poor. A planning application, or waiting a cycle to finish design, is often the better use of staff time.
The benefit-cost analysis is a common failure point. Under the FY2026 notice, a capital project needed at least a Medium BCA rating to be considered Highly Rated. A common mistake is using optimistic travel time savings without accounting for induced demand, or stating economic impacts without showing the method. DOT publishes BCA guidance and a spreadsheet template on its BUILD site; use them, and keep your assumptions conservative enough that a reviewer won't discount the whole analysis.
Selection isn't purely a score. The FY2026 BUILD notice says the Secretary may prioritize projects that can start construction within 18 months, sit in a Qualified Opportunity Zone, have a higher share of non-federal funding, or have never received a BUILD, RAISE, or TIGER grant, and that statute requires DOT to consider geographic and modal diversity. Final selections come from DOT leadership after the technical review. Congressional letters are normal and worth getting, but they won't rescue a project that misses the Highly Rated bar.
Honest friction: smaller communities are often better served by state sub-allocation than direct federal applications. Federal highway formula funds flow to state DOTs first. Most states have sub-allocation programs that distribute portions to MPOs and rural areas, with lower application burdens than BUILD or INFRA. For projects under $10 million, state sub-allocation is often a more efficient path than a national pool where rural applicants won 7.4% of the time in FY2026. Our federal grants for rural organizations guide covers other rural funding routes.
Formula money can sit unused. FTA formula programs distribute billions to transit agencies based on service area population and ridership data. They aren't competitive; they're apportioned. Before you chase a competitive bus grant, check your agency's unobligated FTA formula balance in TrAMS and how long those funds stay available. Spending formula money you already have is faster than winning new money.
Related Guides
Sources
- DOT BUILD Grant Program (opens in a new tab)
- FY2026 BUILD Grants NOFO (opens in a new tab)
- DOT Awarded Projects for TIGER/RAISE/BUILD, 2009 to 2026 (spreadsheet page) (opens in a new tab)
- DOT TIGER 2009 to BUILD 2026 Eligible Applications (spreadsheet page) (opens in a new tab)
- DOT press release: FY2026 BUILD selections, July 7, 2026 (opens in a new tab)
- DOT INFRA Grant Program (opens in a new tab)
- DOT press release: INFRA awards, October 1, 2026 (opens in a new tab)
- DOT press release: INFRA truck parking awards, October 14, 2026 (opens in a new tab)
- DOT press release: CRISI awards, October 19, 2026 (opens in a new tab)
- FRA CRISI Program (opens in a new tab)
- DOT Safe Streets and Roads for All (SS4A) (opens in a new tab)
- FTA Low or No Emission Grant Program (opens in a new tab)
- MARAD Port Infrastructure Development Program (opens in a new tab)
- DOT Reconnecting Communities Pilot Program (opens in a new tab)
- DOT IIJA Funding Status (opens in a new tab)
- P.L. 119-103, Surface Transportation Extension Act of 2026 (opens in a new tab)
- H.R. 8870, BUILD America 250 Act, actions (Congress.gov) (opens in a new tab)
- 49 U.S.C. 48103, AIP funding (opens in a new tab)
- 49 U.S.C. 47109, AIP federal share (opens in a new tab)
- 49 U.S.C. 5339, Bus and Bus Facilities (opens in a new tab)
- FHWA IIJA Competitive Grant Programs Matrix (opens in a new tab)
- FTA Transit Award Management System (TrAMS) (opens in a new tab)
Frequently Asked Questions
What's the local match requirement for DOT competitive grants?
It varies by program. BUILD (formerly RAISE) caps the federal share at 80% for urban projects, so plan on a 20% match, but projects in rural areas or in designated Areas of Persistent Poverty or Historically Disadvantaged Communities can be funded up to 100% federal. INFRA covers up to 60% of project costs from INFRA funds, with total federal assistance capped at 80%. SS4A requires at least a 20% local match on planning and implementation grants alike, though tribes can count Tribal Transportation Program funds toward it. FTA Section 5339 bus capital grants are set by statute at 80% federal. Low-No buses can reach an 85% federal share, and Low-No equipment and facilities 90%. The match can come from state, local, or private sources, but generally can't come from other federal funds unless a statute allows it.
Can cities and counties apply directly for DOT grants?
Yes, for most competitive DOT grant programs. BUILD, SS4A, and INFRA all accept applications from units of local government, including cities, counties, and townships. For FTA formula programs like Section 5307, the designated recipient is usually the transit agency, or the state for smaller urbanized areas. FAA Airport Improvement Program grants go to airport sponsors, which can be cities, counties, or airport authorities. The one major exception is Federal Highway formula funds, which flow to state DOTs and reach local governments only through state sub-allocation or specific state programs.
How competitive are DOT discretionary grants?
Very. DOT's FY2026 BUILD files list 1,198 eligible applications and 127 awards worth $1.73 billion, a 10.6% success rate. Grantsights matched the two files and found the odds varied a lot by applicant: state DOTs won 27 of 120 applications (22.5%), cities and towns won 48 of 582 (8.2%), and tribal governments won 1 of 62. Applications that asked BUILD for less than 80% of the project cost won 14.8% of the time, compared with 6.9% for applications asking BUILD to pay the whole cost. INFRA is competitive at a larger project size. SS4A has two tracks, and planning grants don't need a finished action plan, which makes it the more realistic first step for many small jurisdictions.
Do I need to complete NEPA review before applying for DOT grants?
You don't need a completed NEPA review to apply, but readiness is scored. Under the FY2026 BUILD notice, a capital project needed a Medium or High benefit-cost rating, favorable project readiness ratings, and a start of construction within 18 months of selection to reach DOT's Highly Rated list. INFRA weights readiness too. For SS4A planning grants, NEPA isn't an issue because you're developing a plan, not building anything. For implementation projects, you'll need to complete NEPA before DOT can obligate construction funds, even after an award. NEPA reviews range from a Categorical Exclusion (weeks to months) to an Environmental Assessment (6 to 18 months) to a full Environmental Impact Statement (2 to 5 years). Start NEPA early.
What happens to DOT grant programs now that IIJA's original authorization period has ended?
They haven't lapsed yet. IIJA's authorization ran through September 30, 2026, but the Surface Transportation Extension Act of 2026 (Division C of P.L. 119-103, signed September 2, 2026) continues the highway, safety, and transit authorities through December 11, 2026. The House Transportation and Infrastructure Committee approved a five-year reauthorization, the BUILD America 250 Act (H.R. 8870), by a 62-2 vote on May 22, 2026, but Congress.gov showed no floor vote as of October 20, 2026. Congress needs that bill, another bill, or another extension before December 11. Programs that IIJA created or expanded, like SS4A, depend on it for new rounds. Funds already appropriated and awarded remain available until their deadlines.
Which DOT grant programs are open right now?
As of October 20, 2026, none of the big DOT discretionary programs covered here had an open notice. FY2026 BUILD closed February 24, 2026 and was awarded July 7, 2026. INFRA's two FY2026 tracks closed in July and were awarded on October 1 and October 14, 2026. SS4A closed May 26, 2026, and the FTA bus and Low-No notice closed September 21, 2026; selections for both were still pending. The next round of most programs depends on reauthorization after the December 11, 2026 extension date. Use the gap to finish design, NEPA, cost estimates, and match commitments.
Last updated November 6, 2026. Corrected November 6, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
Complete Guide
Federal Grants for Nonprofits 2026: Where to Apply
Federal grants for nonprofits 2026: nonprofits got $42.7B in direct federal grants in FY2025, $25.4B from HHS. How to register, apply, and win subgrants.
Grants for Senior Transportation Programs 2026: Funders
Grants for senior transportation programs in 2026: 90 foundations gave 145 grants worth $3.89 million to volunteer driver and paratransit groups.
AmeriCorps Grants 2026: NOFO, Living Allowance & Match
The FY2027 AmeriCorps State and National NOFO is open until Jan. 13, 2027. Full-time living allowance: $20,954 to $41,908. Match starts at 24%.
EMPG Grant Guide 2026: Eligibility, 50/50 Match & More
EMPG provided $337.25M in FY2026 to 56 states and territories. Learn the 50/50 cost share, eligible activities, reporting, and how locals apply.
EPA Grants Guide 2026: Brownfields, Clean Water, IRA & More
Compare EPA Brownfields, state revolving funds, P2 and education grants across 10 EPA regions, and see which IRA and EJ programs ended in 2025.
FEMA Grants Guide 2026: HSGP, PA, BRIC & More
Compare FEMA preparedness, disaster, mitigation, nonprofit-security, and fire-grant routes, then check the current program notice and window.