Grant Reporting Requirements by Agency (2026)

Updated 21 official sources

Quick Answer: Federal awards can require SF-425 financial reports and agency-specific performance reports at the frequency and in the system stated in the award.

Full answer and how we checked it

NIH uses RPPR workflows in eRA Commons, NSF uses Research.gov for project reports and ACM$ instead of the SF-425 for finances, DOJ uses JustGrants, SAMHSA uses eRA Commons and PMS, and other agency systems vary by program. Late reports can lead to specific conditions, payment restrictions, suspension, termination, or other remedies authorized by the award and 2 CFR 200.339.

Data note: Reporting requirements reflect official Uniform Guidance, NIH, NSF, DOJ, and agency guidance checked July 26, 2026, with NSF and SAMHSA reporting rechecked October 13, 2026. Your Notice of Award controls the final report list, reporting frequency, system, and role.

In this guide

If you're a grants manager responsible for post-award compliance across multiple federal funders, this guide maps the reporting requirements and systems by agency.

Universal Reports: What Every Federal Grantee Submits

Before getting into agency-specific requirements, two report categories apply across virtually all federal grants under the Uniform Guidance (2 CFR 200) (opens in a new tab).

SF-425: The Federal Financial Report

The SF-425 is the standardized financial report used by most federal agencies (NSF is the main exception, covered below). It captures total federal funds authorized, expenditures during the reporting period, unliquidated obligations, and unobligated balances.

Reporting frequency depends on your award terms:

  • Quarterly or semiannual: Due no later than 30 calendar days after the reporting period under the 2 CFR 200.328 baseline
  • Annual: Due no later than 90 calendar days after the reporting period under that baseline

Your Notice of Award specifies which frequency applies. Under 2 CFR 200.328 (opens in a new tab), agencies can't require reporting more frequently than quarterly or less frequently than annually except in unusual circumstances.

Final SF-425: Due within 120 days of the award end date under 2 CFR 200.344 (opens in a new tab). This is the financial closeout report.

Performance/Progress Reports

Every federal award requires periodic reporting on project activities, accomplishments, and outcomes. The format varies wildly by agency (covered below), but the core requirements under 2 CFR 200.329 include:

  • Comparison of actual accomplishments to established goals
  • Reasons why goals weren't met (if applicable)
  • Additional pertinent information, including cost overruns or changes in project scope
  • If applicable, analysis and explanation of cost overruns or high unit costs

Performance reports are typically due at the same frequency as financial reports, though some agencies decouple the two.

Single Audit (For Recipients Meeting the Current $1 Million Threshold)

Organizations that expend $1 million or more in federal awards during a fiscal year beginning on or after October 1, 2024 must undergo a Single Audit under 2 CFR 200 Subpart F (opens in a new tab). The audit report must be submitted to the Federal Audit Clearinghouse within 30 days of receipt or 9 months after the end of the audit period, whichever comes first.

The Single Audit isn't a report you submit to your granting agency directly. It's an independent audit that covers all your federal spending, and the results are available to every agency that funds you. Findings in a Single Audit can trigger additional monitoring from multiple agencies simultaneously.

For organizations approaching the $1 million threshold, understanding federal grant compliance requirements is essential for audit readiness.

Looking for your next grant?

About once a week, we email a short list of open grant calls with real deadlines from different funders. It lists open calls only.

No spam. Unsubscribe anytime.

NIH: RPPR Through eRA Commons

NIH has the most structured reporting system among federal agencies. All progress reports are submitted through the eRA Commons RPPR module (opens in a new tab).

Annual RPPR

The Research Performance Progress Report covers:

  • Scientific progress during the reporting period
  • Personnel changes (new key personnel, departures, effort changes)
  • Publications and products resulting from the award
  • Inventions and patents
  • Plans for the next budget period
  • Budget requests for the upcoming year (non-SNAP awards)
  • Human subjects and clinical trial updates
  • Inclusion enrollment data (sex, gender, race, ethnicity)

Deadlines:

  • SNAP (Streamlined Noncompeting Award Process) awards: Due 45 days before the next budget period start date
  • Non-SNAP awards: Due 60 days before the next budget period start date
  • Multi-year funded awards: Due annually on or before the anniversary of the budget period start date

According to NIH's RPPR guidance (opens in a new tab), only Signing Officials (SOs) or PIs with delegated submit authority can submit RPPRs. This means your institution's research office is always involved in the submission process.

Federal Financial Report (FFR/SF-425)

NIH requires annual FFRs except for awards under the Streamlined Noncompeting Award Process. The FFR is due no later than 90 days after the end of the calendar quarter in which the budget period ends. For most NIH awards, you'll submit one FFR per year, not quarterly.

Final Reporting

NIH requires:

  • Final RPPR: Includes all Annual RPPR elements plus a project outcomes section summarizing results for a public audience
  • Final FFR: Due within 120 days of the project period end date
  • Final invention statement: Required even if no inventions were made

The Final RPPR is particularly important because NIH publishes the project outcomes section on NIH RePORTER, making it publicly visible. Write it carefully.

NSF: Annual Reports Through Research.gov

NSF grantees submit reports through Research.gov (opens in a new tab), which has a dedicated reporting module.

Annual Project Report

Due 90 days before the end of each budget period (for continuing grants) or 90 days before the award anniversary date.

The annual report covers:

  • Project activities and accomplishments
  • Products (publications, software, datasets, etc.)
  • Participants and collaborators
  • Impacts (on the discipline, other disciplines, human resource development, and society)
  • Changes and problems encountered
  • Special reporting requirements specified in the award

Final Project Report

Due within 120 days of the award expiration date. The final report includes everything from the annual report plus a summary of overall project outcomes. NSF won't process new awards to a PI who has overdue project reports.

Financial Reporting Through ACM$

NSF recipients don't file SF-425s. According to NSF's PAPPG Chapter VIII (opens in a new tab), the Award Cash Management Service (ACM$) "replaced both the reporting of expenditures on the Federal Financial Report (FFR) and the Cash Request Function." Recipients report award-level expenditures in Research.gov each time they request a payment, and closeout still has to be finished within 120 days of the award end date.

Important NSF Quirk

NSF holds future funding hostage more aggressively than most agencies. If you have an overdue annual or final project report, NSF will not make new awards to you as PI until the delinquent report is submitted. This policy is enforced automatically through Research.gov.

SAMHSA: GPRA Performance Data Through SPARS

SAMHSA's reporting requirements are among the most data-intensive in the federal government. In addition to standard financial and progress reports, SAMHSA grantees must collect and report client-level performance data.

GPRA/GPRA Modernization Act Reporting

The Government Performance and Results Act (GPRA) requires SAMHSA grantees to collect standardized client outcome data. According to SAMHSA's performance measures page (opens in a new tab), these data include:

  • Demographics
  • Substance use patterns
  • Mental health functioning
  • Employment and education status
  • Criminal justice involvement
  • Housing stability
  • Social connectedness

Data are collected at baseline, discharge, and 6-month follow-up using SAMHSA-approved instruments specific to each center (CSAT, CMHS, or CSAP). Grantees enter this data into SAMHSA's Performance Accountability and Reporting System (SPARS).

SAMHSA now posts its SAMHSA Unified Performance Reporting Tool (SUPRT) baseline, reassessment and annual forms on that page alongside the center-specific GPRA tools. Reporting instruments and systems can vary by center, program, cohort, and award. Confirm the current data-collection instrument, reporting cadence, and system in the Notice of Award and current SAMHSA program guidance.

Progress Reports

According to SAMHSA's reporting requirements page (opens in a new tab), all SAMHSA awards require performance and progress reports, and your Notice of Award sets the frequency and submission instructions. SAMHSA handles post-award work, including continuation applications and correspondence, in eRA Commons. These narrative reports cover program implementation, challenges, and progress toward stated goals.

Financial Reports

SAMHSA requires an annual SF-425 in the Payment Management System (PMS), due 90 days after the end of the budget period. The final FFR is due in PMS 120 days after the end of the period of performance, and a late or inaccurate FFR can restrict your PMS account.

DOJ: Performance Reports Through JustGrants

DOJ grantees report through JustGrants (opens in a new tab), the department's grants management system.

Performance Reports

DOJ performance reporting varies by program office:

  • OJP (Office of Justice Programs): Requires quarterly performance metrics reports (PMTs) with program-specific data elements, plus semi-annual progress reports with narrative descriptions of activities
  • OVW (Office on Violence Against Women): Requires semi-annual progress reports with detailed activity data
  • COPS Office: Requires quarterly and annual progress reports depending on the program

According to DOJ's grant reporting guidance (opens in a new tab), performance reports are submitted through JustGrants and must be completed by the Grant Award Administrator (GAA).

Financial Reports

DOJ requires quarterly SF-425 reports for most awards, due 30 days after each calendar quarter. The Federal Financial Report is submitted through JustGrants by the assigned Financial Manager.

Consequences of Late DOJ Reports

DOJ is notably aggressive about enforcing reporting compliance. According to the DOJ Grants Financial Guide (opens in a new tab), consequences include:

  • Withholding of payments
  • Placement on reimbursement-only payment status (you spend first, get reimbursed later)
  • High-risk designation with additional award conditions
  • Suspension or termination of existing awards
  • Recommendation for government-wide debarment

HHS (Non-NIH): Reporting Through GrantSolutions

HHS agencies other than NIH, including ACF (Administration for Children and Families), HRSA (Health Resources and Services Administration), and others, generally use GrantSolutions for grant management and reporting.

HRSA

HRSA requires performance reports through its Electronic Handbooks (EHBs) (opens in a new tab) system. Reporting frequency and content vary by program, but most HRSA grantees submit:

  • Annual performance reports with program-specific measures
  • Annual or semi-annual SF-425 financial reports
  • Program-specific data (e.g., Uniform Data System reports for Health Centers)

ACF

According to ACF's reporting page (opens in a new tab), ACF grantees submit:

  • SF-425 Federal Financial Reports (quarterly, semi-annually, or annually depending on the program)
  • Performance progress reports at intervals specified in the award terms
  • Program-specific data reports (varies widely by ACF program)

CDC

CDC grantees report through CDC's grants management system (opens in a new tab). Requirements include:

  • SF-425 financial reports (typically annually)
  • Annual performance reports
  • Subaward data for first-tier subawards of $30,000 or more, reported in SAM.gov (opens in a new tab) (the FSRS system was retired on March 8, 2025), due by the end of the month following the obligation

Department of Energy Office of Science grantees submit technical progress reports through E-Link (DOE's scientific and technical information system) and financial reports through the agency's financial system.

Technical Progress Reports

DOE technical-reporting requirements, submission systems, and cadence depend on the program and award. Confirm the current system and due dates in the award terms and DOE program guidance.

Financial Reports

SF-425 reports are typically required annually for DOE grants, with the specific frequency stated in the award document.

Reporting Frequency Comparison Table

AgencyFinancial Report (SF-425)Performance/Progress ReportSystem
NIHAnnual (90 days after quarter end)Annual RPPR (45-60 days before budget period)eRA Commons
NSFNo SF-425; expenditures reported through ACM$ with each payment requestAnnual (90 days before budget period end)Research.gov
SAMHSAAnnual (90 days after budget period, in PMS)Per Notice of Award + GPRA/SUPRT data ongoingeRA Commons/PMS/SPARS
DOJQuarterly (30 days after quarter)Quarterly PMTs + semi-annual narrativeJustGrants
HRSAAnnual or semi-annualAnnual (program-specific)EHBs
ACFQuarterly, semi-annual, or annualPer award termsGrantSolutions
CDCAnnualAnnualCDC Grants Portal
DOEAnnualAnnual technical reportE-Link/PAMS
EDPer award termsAnnualG5/agency system
FEMAPer NOFO (often quarterly)Per NOFO (varies by program)FEMA GO

What Happens When You Miss a Reporting Deadline

Late reports don't just generate reminder emails. The consequences escalate quickly and can affect your organization's entire federal funding portfolio.

Stage 1: Warning Notice

Most agencies send a reminder when a report is past due. This is your last easy off-ramp. Submit the report immediately.

Stage 2: Withholding of Funds

Under 2 CFR 200.339 (opens in a new tab), agencies can withhold payments until delinquent reports are submitted. For organizations that depend on federal reimbursements for cash flow, this can create an immediate financial crisis.

Stage 3: Additional Award Conditions

Agencies can impose specific conditions including:

  • More frequent reporting (quarterly instead of annual)
  • Additional financial documentation requirements
  • Required prior approval for budget changes that would normally be automatic
  • Reimbursement-only payment status (no advance payments)

Stage 4: High-Risk Designation

A high-risk designation is the compliance equivalent of a credit downgrade. It affects not just the award with the late report, but all your federal awards and future applications. According to the DOJ Grants Financial Guide (opens in a new tab), high-risk grantees face additional restrictions on every federal award they hold, and new applications are scrutinized more heavily.

Stage 5: Suspension, Termination, and Debarment

In extreme cases, agencies can suspend or terminate active awards and recommend the organization for government-wide debarment. Debarment means you can't receive any federal awards, including grants, contracts, or cooperative agreements, for a period of up to 3 years. Per NIH's enforcement guidance (opens in a new tab), suspension can happen while an investigation is ongoing, even before a final determination.

How Reporting Connects to Closeout

Grant closeout begins when your project period ends, and reporting is the core of the closeout process. Under 2 CFR 200.344, you have 120 days after the award end date to submit all final reports.

Required Closeout Reports

At minimum:

  1. Final SF-425 showing total expenditures and any remaining unobligated balance (which must be returned to the agency)
  2. Final performance/progress report documenting outcomes and accomplishments
  3. Final invention statement for research awards where the agency requires one (NIH requires it even if no inventions occurred)
  4. Equipment inventory for federally-funded equipment items costing $10,000 or more per unit
  5. Property report (if applicable)

The 120-Day Clock

The 120-day closeout window is firm. If you don't submit final reports within 120 days, the agency can close out the award unilaterally, using whatever financial data is available. This often means disallowed costs and required returns of funds that you might have been able to justify with a proper final report.

For a complete walkthrough of the closeout process, see our guide on how to write a grant progress report.

Common Reporting Mistakes and How to Avoid Them

Mistake 1: Treating Reports as Administrative Afterthoughts

Reports aren't just paperwork. They're the legal documentation that your organization used federal funds appropriately. If an auditor or inspector general reviews your award 3 years from now, your reports are the primary evidence. Write them with that audience in mind.

Mistake 2: Waiting Until the Deadline to Start

Financial reports require reconciled accounting data. Performance reports require compiled outcome data. Neither can be assembled accurately in a single afternoon. Start gathering data at least 2 weeks before each reporting deadline.

Mistake 3: Inconsistent Numbers Between Financial and Performance Reports

If your SF-425 shows you spent $200,000 during the period but your performance report describes activities consistent with $75,000 in spending, that discrepancy will trigger questions from the grants management specialist. Reconcile financial and performance data before submitting either report.

Mistake 4: Not Tracking Subaward Reporting Requirements

If you issue subawards of $30,000 or more, you must report them in SAM.gov (opens in a new tab). The old FSRS system (fsrs.gov) was retired on March 8, 2025. This requirement applies regardless of which agency funded you. The report is due by the end of the month following the month in which the subaward obligation was made.

Mistake 5: Ignoring the MTDC Threshold for Subawards

The first $50,000 of each subaward is included in your modified total direct cost (MTDC) base for calculating indirect costs. Amounts above $50,000 are excluded. Getting this wrong on your SF-425 is a common audit finding. Your indirect cost rate calculation should account for this correctly.

Mistake 6: Losing Track of Which System Each Report Goes Into

When you're managing grants from 4 or 5 different agencies, it's easy to forget that NIH reports go to eRA Commons, NSF reports go to Research.gov, DOJ reports go to JustGrants, and SAMHSA GPRA data goes to SPARS. Build a reporting matrix that lists each active award, the required reports, the submission system, the deadline, and the responsible person.

Tips for Staying on Track

Build a Reporting Calendar

Create a shared calendar with every reporting deadline for every active award. Include:

  • Report type (financial, performance, GPRA, etc.)
  • Submission system
  • Due date
  • Internal preparation start date (2 weeks before)
  • Responsible staff member

Set Up Internal Deadlines

Financial data should be reconciled 10 business days before the reporting deadline. Performance data should be compiled 10 business days before. Draft reports should be reviewed by a second person 5 business days before. Final submission should happen at least 2 days before the deadline.

Maintain a Reporting Procedures Manual

Document the step-by-step process for submitting each type of report in each system. Include screenshots, login information (stored securely), and contact information for agency help desks. When staff turn over, this manual prevents the "nobody knows how to submit the report" problem.

Reconcile Monthly, Not Just at Reporting Time

If you reconcile your grant expenditures against your accounting system monthly, reporting periods become straightforward data pulls rather than frantic catch-up exercises. Monthly reconciliation also catches errors early, when they're easier to correct.

Keep Your Program Staff Informed

Program staff generate the performance data. If they don't understand what needs to be reported and when, you'll be chasing information at the last minute. Brief your program team at the start of each budget period on what data they need to track and how to document it.

Multi-Agency Reporting Problems to Plan For

The multi-agency picture looks clean in guides like this one. In practice, it creates coordination problems that nobody warns you about.

The NIH "two system" problem trips up almost every new grantee. Your RPPR goes into eRA Commons. Your Federal Financial Report (SF-425) goes to NIH's Payment Management System (PMS), which is a completely separate platform managed by HHS. Even well-organized research offices can submit the RPPR on time and forget the FFR because they assume it all goes to the same place. PMS has its own login, its own deadlines, and its own consequences for late submission. Bookmark both.

NSF's automated hold is unforgiving in a way that surprises PIs. A common cause of NSF holds isn't the current award, it's an old one. A PI forgets to submit a final project report on a supplement that ended 2 years ago. NSF's system flags them, and when their major grant comes up for renewal, the hold blocks processing. The grants office discovers this problem 6 weeks before submission when it's nearly impossible to reconstruct data for a project that wrapped years ago. A simple rule: any time an NSF award closes, submit the final project report the same week, not the week before the 120-day deadline.

SAMHSA's move from legacy GPRA instruments to SUPRT can catch grantees mid-data-collection. SAMHSA's performance measures page now lists SUPRT baseline, reassessment and annual forms next to the older center-specific GPRA tools. A grantee that enrolled clients under one instrument has to know which form applies to their follow-up interviews. If you have an older SAMHSA grant and you haven't checked your data collection instruments against the current SUPRT requirements and your Notice of Award, check now.

The honest picture on DOJ quarterly deadlines: DOJ requires SF-425s 30 days after each calendar quarter. That means your Q3 financial report (July-September) is due October 30. For social services organizations that operate programs over the summer, staff are often stretched thin in early fall and financial data reconciliation gets deprioritized. A missed October deadline can trigger the remedies described above, such as withheld payments, even on a program that is otherwise running well. DOJ's enforcement is less forgiving than NIH or NSF, and reimbursement-only status creates cash flow problems that cascade into the next quarter.

Last updated: October 13, 2026.

What Federal Grants Compliance Officers Doesn't Tell You

Each agency has its own reporting system, and none of them talk to each other. NIH uses the Research Performance Progress Report (RPPR) in eRA Commons, NSF uses Research.gov, SAMHSA uses eRA Commons and PMS, and several other HHS operating divisions use GrantSolutions. If you have grants from multiple agencies, you're logging into multiple systems with different deadlines and formats.

Late reports trigger automatic restrictions in most agency systems. NIH places a "late report" flag that blocks new award processing. NSF holds future funding until overdue reports are submitted. The restriction is automated, meaning your program officer can't override it even if they want to.

Financial reports (SF-425) and performance reports have different deadlines at most agencies. Don't assume they're due at the same time. NIH performance reports are due 45 days (SNAP) or 60 days (non-SNAP) before the next budget period starts, while financial reports follow a different schedule. Track them separately.

How Grantsights Checked This Guide

RequirementOfficial source checkedWhat it means in practice
Financial reporting2 CFR 200.328 (opens in a new tab)Agencies can require financial reports no more often than quarterly and no less often than annually unless an exception applies.
Performance reporting2 CFR 200.329 (opens in a new tab)Progress reports must compare actual work to approved goals and explain missed goals, scope issues, or high unit costs.
Closeout2 CFR 200.344 (opens in a new tab)Final reports are due within 120 days after the period of performance ends unless the agency approves an extension.
NIH RPPRNIH RPPR guidance (opens in a new tab)NIH progress reporting is a scientific, personnel, publication, invention, and next-budget-period workflow, not just a narrative update.
DOJ reportingJustGrants performance reporting tips (opens in a new tab)DOJ reports must be submitted in JustGrants by the correct award user, so role errors can become late reports.

Where official sources stop: The Uniform Guidance gives the baseline, but the award file tells you which agency system, due date, role, and report package applies. Grantsights data review separates universal rules from agency-specific portal duties so grantees can build one master calendar without flattening the differences.

Bad fit check: Stop using a generic "quarterly report" template if the award is NIH, NSF, SAMHSA, or DOJ. Each system asks for different data, and a finance-only calendar misses performance, invention, closeout, and user-role risks.

This guide is for grantees managing active federal awards, especially teams with more than one agency in the portfolio. For example, one nonprofit with DOJ and SAMHSA awards may need quarterly finance reports, program metrics, and client-outcome data in separate systems. According to 2 CFR 200.344, final reports are due within 120 days after the period of performance ends unless an extension applies. According to NIH, RPPRs are due at least annually and must be approved for non-competing funding. According to 2 CFR 200.328, financial reporting cannot usually be more frequent than quarterly. According to DOJ reporting guidance, the correct JustGrants user must complete performance reports.

Use this with the federal grant reporting guide, federal grant closeout process, federal grant compliance requirements, grant continuation and renewal, federal grant management systems, and the grant database.

Winning a federal grant is only the beginning of the compliance work. From the day your award starts until 120 days after it ends, you're responsible for submitting financial reports, performance reports, and agency-specific data on schedules that vary by funder. Miss a deadline, and you won't just get a sternly worded email. You'll face funding holds, high-risk designations, and restrictions that follow your organization across every federal agency.

The reporting picture is fragmented because each agency built its own system. NIH grantees submit RPPRs through eRA Commons. NSF grantees file annual reports through Research.gov. DOJ grantees use JustGrants. SAMHSA grantees enter GPRA performance data into SPARS. The forms are different, the portals are different, the deadlines are different, and the consequences of non-compliance are real.

This guide covers the reporting requirements for 10 major federal grant-making agencies, the universal reports that apply to everyone, and the mistakes that land organizations on high-risk lists.

Sources

Frequently Asked Questions

What is the SF-425 and when is it due?

The SF-425 is the Federal Financial Report, the standard form used across all federal agencies to report grant expenditures, unliquidated obligations, and unobligated balances. Reporting frequency varies by agency and award: quarterly reports are due 30 days after the end of each quarter (calendar quarters ending 3/31, 6/30, 9/30, 12/31), semi-annual reports are due 30 days after the reporting period, and annual reports are due 90 days after the reporting period ends. Final SF-425s are due 120 days after the award end date under 2 CFR 200.344. The specific frequency is stated in your Notice of Award.

What happens if I submit a federal grant report late?

Late reports trigger escalating consequences. The first step is usually a warning notice from the grants management specialist. Continued delinquency can result in withholding of funds on the current award, placement of additional award conditions, designation as a high-risk grantee (which affects all your federal awards, not just the one with the late report), suspension or termination of the award, and being barred from receiving future federal funding. Under 2 CFR 200.339, agencies can impose specific conditions on awards from recipients who fail to meet reporting requirements. DOJ can place grantees on reimbursement-only payment status, meaning you must spend your own funds first and get reimbursed only after submitting documentation.

What is the NIH RPPR and how do I submit it?

The Research Performance Progress Report (RPPR) is NIH's annual progress report submitted through eRA Commons. There are three types: Annual RPPR (submitted each budget period as part of the non-competing continuation process), Final RPPR (submitted during closeout with project outcomes), and Interim RPPR (submitted with a renewal application). Annual RPPRs are due 45 days before the next budget period start date for SNAP awards or 60 days before for non-SNAP awards. The RPPR covers scientific progress, personnel changes, publications, inventions, and plans for the next budget period. Only Signing Officials or delegated PIs can submit.

Do all federal agencies require the same reports?

No. The SF-425 Federal Financial Report is common, but not universal: NSF replaced FFR expenditure reporting with its Award Cash Management Service (ACM$). Performance and progress reporting requirements vary significantly by agency. NIH requires RPPRs through eRA Commons. NSF requires annual and final project reports through Research.gov. SAMHSA collects performance data through SPARS, including its SUPRT instruments, and handles post-award work in eRA Commons. DOJ requires performance reports through JustGrants using program-specific metrics. HRSA requires performance reports through the Electronic Handbooks (EHBs). Each agency has its own reporting portal, format, metrics, and deadlines. Your Notice of Award and the original NOFO specify exactly which reports are required and when.

What reports are required for federal grant closeout?

Under 2 CFR 200.344, grantees must submit all required reports within 120 days of the award end date. At minimum, closeout requires a final SF-425 Federal Financial Report showing all expenditures and any remaining unobligated balances, and a final performance or progress report documenting outcomes and accomplishments. Research awards also need a final invention statement under 37 CFR 401 and agency terms, and NIH requires one even if no inventions were made. NIH requires a Final RPPR. NSF requires a Final Project Report. Some agencies also require a final equipment inventory for items over $10,000, a final property report, and documentation of any program income earned. Failure to complete closeout can result in disallowed costs, required fund returns, and negative impact on future funding.

Last updated October 13, 2026. Corrected October 13, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.