Grants for Renewable Energy: DOE, IRA & REAP Programs

Updated 21 official sources

Quick Answer: Federal grants for installing renewable energy are scarce in late 2026. P.L. 119-21 repealed the $27B EPA Greenhouse Gas Reduction Fund and cut off wind and solar tax credits for projects that didn't begin construction by July 4, 2026 unless they're placed in service by December 31, 2027.

Full answer and how we checked it

USDA isn't accepting REAP grant applications, and its October 16, 2026 rule limits future REAP grants to projects already running for 12 months. What's left: 30% clean electricity credits (cash for nonprofits and governments through elective pay), longer-lived storage and geothermal credits, REAP guaranteed loans, and state incentives.

Data note: Amounts may shift with annual appropriations. Tax credit deadlines and program status were rechecked on October 20, 2026 against the text of P.L. 119-21, IRS Notice 2025-42, USDA's October 2026 REAP rule, USDA's ARC and PART funding notices, EPA's GGRF page, DOE's eXCHANGE portal, and Grants.gov (opens in a new tab).

In this guide

Quick Facts

Agency
USDA
Deadline
Check official source
Status
Closed

Assistance Listing 10.868: all awards

Source: USASpending.gov FY2024

These figures cover all Rural Business-Cooperative Service awards under Assistance Listing 10.868, of every award type. They are not figures for the award this guide describes, and one award of that kind can be far smaller.

Total Awards (FY2024, whole listing)
4,449
Avg Award (whole listing)
$162,770
Median Award (whole listing)
$77,250
Total Funding (FY2024, whole listing)
$677.8M
YoY Funding Trend
+61.9%

Data last verified: May 20, 2026

If you're a business owner, nonprofit leader, farmer, tribal energy office, local government official, or developer looking to fund a solar, wind or other renewable project, you're working in a funding environment that changed sharply in 2025 and again in 2026. The Inflation Reduction Act built a large incentive stack, and P.L. 119-21 then removed or shortened much of it, which makes it hard to figure out which pieces apply to your specific project. Grants for renewable energy come from at least five federal agencies, 50 state programs, and dozens of utilities and foundations.

What's actually open, October 20, 2026: Grantsights checked every DOE and USDA Rural Development opportunity posted on Grants.gov (opens in a new tab) against its eligibility rules and stated purpose. Grantsights analysis of those 17 listings found none that would pay a nonprofit, local government, farm or small business to install a commercially available solar or wind system. Method: Grantsights pulled all 867 posted and 598 forecasted opportunities from the public Grants.gov search2 API (opens in a new tab), kept the 17 posted by DOE and USDA Rural Development (none were forecasted), and read each listing's eligibility and description. The practical advice that follows: a standard commercial or community solar installation is a bad fit for a DOE research NOFO. A rural farm solar project should test a REAP guaranteed loan plus the investment credit first (if it can be placed in service by the end of 2027), while a new storage technology may fit DOE or ARPA-E.

This guide maps every major funding source, explains who qualifies for what, and shows you how to stack multiple programs to minimize your out-of-pocket costs.

What DOE and USDA Have Posted Right Now

Of 17 DOE and USDA Rural Development listings on Grants.gov (opens in a new tab) on October 20, 2026, 0 fund deployment of an existing solar or wind technology by a nonprofit, local government or small business. Here's how they break down:

GroupListingsWhat they fundWho can apply
DOE notices, RFIs and notices of intent6Nothing yet: 2 notices of intent (PROSPECT, alternative chemicals and fuels), 3 requests for information, 1 sequestration notice from 2013Varies
DOE research, scale-up and licensing5ARPA-E SCALEUP Ready, ASPECT chemical scale-up ($2M to $20M awards), silicon carbide nuclear fuel cladding, advanced nuclear licensing cost share, university nuclear scholarshipsBroad on paper, but the work is research, scale-up or nuclear licensing; scholarships are universities only
USDA ARC Energy Program1$175 million for nuclear power supply and transmissionRural electric cooperatives only
USDA REAP grant listing1A 2018 record still on Grants.gov (opens in a new tab); USDA's REAP page says grant applications aren't being acceptedAgricultural producers, rural small businesses
Other USDA Rural Development4Agriculture innovation centers, a catfish processing program, solid waste and water technical assistanceNot energy programs

DOE's own consolidated eXCHANGE portal (opens in a new tab) told the same story the same day: its open list held lab calls for national laboratories, teaming-partner lists, notices of intent, one request for information and the ASPECT chemical NOFO.

The red flag for applicants is the vendor pitch that a "DOE solar grant" will cover part of an installation. In October 2026 that money doesn't exist on Grants.gov (opens in a new tab). Treat any quote that assumes it as a quote that needs to be rerun with tax credits, state and utility incentives, and loans only.

IRA Clean Energy Tax Credits After P.L. 119-21

The Inflation Reduction Act's tax credits aren't technically grants, but they function like them and are still the largest pool of renewable energy funding. For nonprofits and governments, elective pay makes them effectively identical to grants. P.L. 119-21 changed the deadlines, and the change depends on the technology.

CreditRateEligible ProjectsDuration
Clean electricity investment credit (48E)30% of costsWind and solarConstruction must have begun before July 5, 2026 (passed), or the project must be placed in service by Dec 31, 2027
Clean electricity investment credit (48E)30% of costsStorage, geothermal, hydropower, other zero-emission sourcesFull credit for construction beginning through 2033, then 75% in 2034, 50% in 2035, none after; storage keeps the credit even at a wind or solar site
Clean electricity production credit (45Y)Inflation-adjusted rate per kWh, 10 yearsWind and solarSame 2026/2027 cutoff as 48E
Advanced Manufacturing Credit (45X)VariesManufacturing clean energy componentsWind components end after 2027; critical minerals phase down 2031-2033
Clean Hydrogen Credit (45V)Up to $3/kgClean hydrogen productionConstruction must begin before Jan 1, 2028
Residential Clean Energy Credit (25D)30%Homeowner solar, wind, geothermal, batteriesEnded for expenditures made after Dec 31, 2025

According to IRS Notice 2025-42 (opens in a new tab), a wind or solar facility that hadn't begun construction before September 2, 2025 has to show it began construction by meeting the Physical Work Test, meaning physical work of a significant nature. The old 5% spending safe harbor survives only for solar facilities of 1.5 megawatts (AC) or less. The July 4, 2026 start deadline has passed, so a wind or solar project that hadn't started physical work by then only gets the credit if it's placed in service by December 31, 2027. A project that did start in time is presumed to meet the continuity rule if it's placed in service by the end of the fourth calendar year after construction began. P.L. 119-21 also added prohibited foreign entity restrictions for projects beginning construction after 2025, and section 70506 of the law (opens in a new tab) ended the 25D homeowner credit for expenditures made after December 31, 2025.

The base ITC rate is 30% for projects that meet prevailing wage and apprenticeship requirements (6% without). Bonus credits can push the effective rate much higher:

BonusAdditional CreditRequirements
Energy Community+10%Located in fossil fuel or brownfield communities
Domestic Content+10%Meet domestic sourcing thresholds
Low-Income Community+10% to +20%Located in or serving low-income communities

A solar project in a former coal community using domestic panels and serving low-income residents could theoretically stack credits to 70% or more of project costs, but only if it meets the 2026 construction or 2027 placed-in-service deadline.

The direct pay revolution: Before the IRA, nonprofits, governments, and tribal entities couldn't use tax credits. They had to find tax equity investors, giving up 10% to 20% of the credit value in transaction costs. The IRA's direct pay provision allows these entities to claim credits as cash payments from the IRS. It still works, but only for credits that remain available to the project. According to the IRS elective pay page (opens in a new tab), an entity must register with the IRS before filing, and the registration number has to appear on the return or the election isn't effective. P.L. 119-21 left elective pay in place, but a payment later disallowed for overstating a project's foreign-entity content is treated as an excessive payment, so keep the supplier certifications.

For more on clean energy business funding, see our grants for clean energy businesses guide. Nonprofits weighing elective pay on their own buildings should read the best clean energy grants for nonprofits, and the Inflation Reduction Act grants and funding guide tracks which IRA programs survived.

DOE Office of Energy Efficiency and Renewable Energy (EERE)

EERE has been the Department of Energy's main grant-making office for renewable energy research, development, demonstration, and deployment. DOE has since moved this work under the Office of Critical Minerals and Energy Innovation (CMEI), which now issues the NOFOs EERE used to (the September 2026 ASPECT notice, for example, runs $2 million to $20 million per award). DOE also cancelled a number of previously announced awards in 2025, so check the current office and funding opportunity before you plan a proposal. There's no reliable fixed annual total; funding depends on each year's appropriation.

DetailInformation
Annual fundingSet by each year's appropriation
Administering agencyDOE Office of Critical Minerals and Energy Innovation (former EERE programs)
Eligible applicantsVaries by NOFO: businesses, universities, nonprofits, governments
Award rangeSet in each NOFO; ASPECT (September 2026) offers $2 million to $20 million
Application portalDOE eXCHANGE (opens in a new tab), which replaced EERE Exchange and the Office of Indian Energy's IE Exchange

EERE has historically worked through technology-specific offices. CMEI is regrouping them, so check which office now runs your topic:

  • Solar Energy Technologies Office (SETO): Funds solar research, manufacturing, and deployment. Recent priorities include perovskite solar cells, agrivoltaics, and community solar.
  • Wind Energy Technologies Office (WETO): Funds onshore and offshore wind technology development.
  • Geothermal Technologies Office (GTO): Funds enhanced geothermal systems and direct-use applications.
  • Water Power Technologies Office: Funds hydropower modernization and marine energy.
  • Building Technologies Office: Funds energy efficiency in buildings, including heat pump deployment.

Bottom line: EERE grants are highly competitive. They're best suited for organizations doing something genuinely new or different, not installing off-the-shelf solar panels. If you're a university, national lab partner, or technology company with a new approach, EERE is your primary federal funder. If you're a community organization installing a standard solar array, look at tax credits (if your project meets the deadlines), state incentives, and REAP loans for eligible rural businesses instead.

Energy Efficiency and Conservation Block Grants (EECBG): This formula program, funded by the 2021 infrastructure law, sent money to states, cities, counties and tribes for efficiency and renewable projects. The application windows have closed. According to USAspending.gov (opens in a new tab) data for assistance listing 81.128, DOE obligated $181.9 million in EECBG grants in FY2024 and $31.1 million in FY2025, then recorded a net $1.76 million deobligation in FY2026. Nonprofits and businesses can't apply to DOE for these funds. If your city or county still holds an uncommitted allocation, a public-building solar project may fit as a subaward, so ask before you write anything.

DOE Office of Indian Energy: According to DOE's March 25, 2026 announcement (opens in a new tab), the office offered $50 million through the Unleashing Tribal Energy Development NOFO for community-scale and, for the first time, large-scale tribal energy project planning and development. Applications closed July 24, 2026. Tribes that missed it should watch DOE eXCHANGE (opens in a new tab) for the next round and see the tribal grants guide for other federal sources.

USDA Rural Energy for America Program (REAP)

REAP has been the main direct grant program for small-scale renewable energy projects in rural areas. It provides grants and loan guarantees to agricultural producers and rural small businesses only, and in 2026 USDA rebuilt the grant side from scratch.

USDA halted the old round first. Its April 15, 2026 Federal Register notice (opens in a new tab) rescinded the October 2024 funding notice that covered FY2025 through FY2027, and any applicant without a fully executed award agreement has to reapply under the new rules. Then a final rule published October 1, 2026 (opens in a new tab) and effective October 16, 2026 turned REAP grants into a pay-after-performance program.

DetailInformation (October 2026 rule)
Current statusGrant applications not being accepted; USDA says a funding notice "will publish soon"; guaranteed loans open
Administering agencyUSDA Rural Development
Eligible applicantsAgricultural producers (majority owner earns at least 50% of income from agriculture), rural small businesses
When you applyAfter the system is built and operating, with 12 months of actual production or savings data plus 12 months of pre-installation data
Grant requestMinimum $1,500; maximum $500,000 for renewable energy systems, $250,000 for energy efficiency
Cost shareAt least 75% of project cost, so the grant covers at most 25%
Grant + guaranteed loanApplied for separately; combined up to 75% of project cost
Guaranteed loanUp to 75% of eligible costs; 80% guarantee for FY2025 loans; 1% initial fee and 0.25% annual retention fee

REAP funds both renewable energy systems (solar, wind, geothermal, biomass, small hydro, hydrogen, ocean energy) and energy efficiency improvements. The rule says it focuses REAP on "appropriately scaled, on farm" systems: it limits oversized ground-mount solar, protects cropland, makes multi-location projects ineligible, and replaces state-level competitions with a single national scoring process.

The money before the change shows what applicants lost. According to USAspending.gov (opens in a new tab) records for assistance listing 10.868, USDA obligated $677.8 million in REAP grants in FY2024 and $360.3 million across 2,336 grants in FY2025, with a median award of $58,630. USAspending shows no REAP grant obligations from October 1, 2025 through October 19, 2026. One company in New Mexico, Adams Produce, Inc., received two FY2025 renewable energy system grants totaling $1,787,100, and JBJ Kilpatrick Farms Inc in North Carolina received a $1 million renewable energy system grant and a $500,000 efficiency grant. Under the new rule, no single request can exceed $500,000 for a renewable energy system or $250,000 for efficiency, half of what Kilpatrick received.

Eligibility requirements:

  • Rural location: Project must be in a rural area (population 50,000 or less). Use the USDA eligibility map at https://eligibility.sc.egov.usda.gov/eligibility/welcomeAction.do (opens in a new tab).
  • Agricultural producer or rural small business: Ag producers' majority owners must earn at least 50% of their income from agricultural operations. Small businesses must meet SBA size standards.
  • Completed project: The project must have finished 12 to 24 months before you apply (12 to 36 months for the first window under the new rule). The old technical report appendices are gone because the project is already built.

A common mistake is reading the terms on USDA's REAP grant page, which on October 20, 2026 still listed IRA-era limits (grants up to 50% of costs and $1 million). The October 2026 rule's $500,000 cap and 75% cost share control the next window. Check the REAP guaranteed loan page (opens in a new tab) and your state energy coordinator before planning a project, and keep 12 months of utility bills before you build.

For more on USDA energy programs, see our USDA energy grants guide and the step-by-step USDA REAP grants guide.

USDA Rural Electric Programs: ARC and PART Replace New ERA and PACE

USDA reopened two Inflation Reduction Act rural electric programs in 2026 under new names, with about $585 million between them. Both serve utilities, not farms, nonprofits or small businesses.

ProgramFundingWho can applyWhat it pays forStatus
Affordable Rural Cooperative (ARC)About $175 million in loans and grants; grant up to 25% of award costs and $20 millionRural electric cooperatives and their subsidiariesNuclear energy and transmission efficiencyLetters of interest October 19 to November 20, 2026
Powering Affordable Reliable Technology (PART)About $410 million in loans forgivable up to 40%Operating utilities, including for-profits, state and local governments, and tribesRenewable generation and storage that supports itLetters of interest closed October 9, 2026

According to USDA's ARC funding notice (opens in a new tab), ARC uses IRA section 22004, the same authority that funded the Empowering Rural America (New ERA) program, but this round funds nuclear power supply and transmission, not wind or solar. PART uses IRA section 22001 and the same assistance listing (10.757) as the Powering Affordable Clean Energy (PACE) program, and its Federal Register notice (opens in a new tab) points to the full NOFO on Grants.gov (opens in a new tab). USDA says future ARC and PART notices will appear only on its website and Grants.gov, not in the Federal Register. A community solar developer that wants PART-style financing needs a utility partner that can apply.

EPA Greenhouse Gas Reduction Fund (GGRF): Repealed and in Litigation

The GGRF was a $27 billion Inflation Reduction Act program that capitalized green banks and community lenders to finance clean energy projects, especially in disadvantaged communities.

ComponentFundingStatus (October 2026)
National Clean Investment Fund$14 billionGrants terminated March 11, 2025; in litigation
Clean Communities Investment Accelerator$6 billionGrants terminated March 11, 2025; in litigation
Solar for All$7 billionEnded by EPA August 7, 2025; termination vacated by a Rhode Island federal court September 18, 2026

According to EPA's Greenhouse Gas Reduction Fund page (opens in a new tab), EPA terminated the $20 billion in NCIF and CCIA grants held by eight entities on March 11, 2025. P.L. 119-21 section 60002 then repealed the GGRF's authority in Clean Air Act section 134 and rescinded its unobligated balances. On August 4, 2026, the full D.C. Circuit ruled 6-4 for the grantees in Climate United v. Citibank and reinstated a preliminary injunction, but stayed its judgment so the government could seek Supreme Court review. Older advice to "find the green bank with GGRF money in your state" doesn't hold up while that case is unresolved. If a lender offers you GGRF-backed financing, ask it to confirm in writing that the funds are available to commit.

Solar for All was the most grant-like component, funding state, tribal, and municipal programs for residential solar in low-income households. According to EPA's Solar for All page (opens in a new tab), EPA announced on August 7, 2025 that it would no longer implement the program, because the new law "repealed EPA's authority to administer the program and rescinded all remaining funds." Court rulings since then have split. On September 18, 2026, a federal judge in Rhode Island ruled the termination unlawful and vacated it, according to Utility Dive's report on the ruling (opens in a new tab), and EPA said it was reviewing its options. Community organizations shouldn't plan installer or partner work around Solar for All without written confirmation from their state administrator.

P.L. 119-21 section 60016 also rescinded the unobligated balance of EPA's Environmental and Climate Justice Block Grants, another IRA program that some community solar groups had counted on.

State and nonprofit green banks that existed before the IRA still lend with their own capital. The Coalition for Green Capital, itself one of the terminated NCIF grantees, lists them at cgc.org (opens in a new tab).

State Clean Energy Programs

Every state operates some form of clean energy incentive program, though funding levels and structures vary enormously.

StateKey ProgramFunding LevelNotable Features
CaliforniaSelf-Generation Incentive Program$1B+Storage focused, equity adders
New YorkNY-Sun$1.8BSolar incentives, community solar
MassachusettsSMART Program$500M+Solar tariff incentive
IllinoisAdjustable Block Program$400M+Community solar, low-income set-asides
ColoradoRenewable Energy StandardVariesUtility-funded incentives
TexasProperty Tax ExemptionVaries100% property tax exemption for renewables

The Database of State Incentives for Renewables and Efficiency (DSIRE) at https://www.dsireusa.org (opens in a new tab) maintains a searchable database of every state and local incentive program. Check DSIRE before applying for any renewable energy funding to identify programs you might be missing.

State programs often stack with federal programs. A solar project that meets the federal 2026/2027 deadlines might combine the 30% investment credit with a state rebate. With REAP grants paused and the federal wind and solar credits ending for late projects, state and utility programs carry more of the load for new solar in 2027 and beyond. The funding levels in the table are program-scale figures that weren't rechecked in October 2026; DSIRE has current terms.

DOE Loan Programs Office (LPO)

The LPO provides loan guarantees and direct loans for large energy projects, and it now operates as the Office of Energy Dominance Financing (EDF) (opens in a new tab) with all of LPO's authorities and appropriations. It's not a grant program, but its below-market financing can make projects feasible that wouldn't work with conventional bank loans. P.L. 119-21 changed its funding sharply:

ProgramChange under P.L. 119-21Eligible Projects
Title 17 Clean Energy FinancingUnobligated IRA credit subsidy (IRA sec. 50141) rescindedNew or significantly improved energy technology
ATVMIRA ATVM funding (sec. 50142) repealed and unobligated balance rescindedAdvanced vehicle manufacturing
Section 1706, now "Energy Dominance Financing"Unobligated IRA funds (sec. 50144) rescinded; $1 billion newly appropriated through Sept 30, 2028; commitment authority extended to 2028Projects that increase capacity or output, or support grid reliability, at existing energy infrastructure
Tribal Energy Loan GuaranteeUnobligated IRA credit subsidy (sec. 50145) rescindedTribal energy projects

Large authority figures you may see quoted for these programs, such as "$250 billion" for section 1706, describe IRA-era loan authority before the 2025 rescissions. LPO financing is best suited for utility-scale generation, storage, transmission, and manufacturing projects, and the application process typically runs 12 to 18 months.

For smaller projects, SBA loans and USDA guaranteed loans are more practical financing options.

Grants for Renewable Energy in Climate Adaptation

The intersection of renewable energy and climate resilience opens additional funding sources, particularly for microgrids, battery storage, and resilient power systems.

FEMA's Hazard Mitigation Grant Program can fund renewable energy systems when they're designed to provide backup power during disasters. FEMA ended the Building Resilient Infrastructure and Communities (BRIC) program on April 4, 2025; a court ordered it reinstated, and FEMA then issued a single combined FY2024-25 BRIC funding notice, so check FEMA for current BRIC status before counting on it. Solar-plus-storage systems for community shelters, hospitals, and critical facilities are strong candidates.

HUD's CDBG-Disaster Recovery funds can include renewable energy components in rebuilding efforts. Several communities have used CDBG-DR to install solar on rebuilt housing.

Learn more in our grants for climate adaptation guide.

Project Economics: How to Stack Multiple Programs

The key to making renewable energy projects pencil out is stacking multiple incentive programs. Here's an illustrative (not real) example for a 500kW community solar project in a rural, low-income area that began physical construction before July 5, 2026:

Funding SourceAmount% of $1.5M Total Cost
Federal investment credit (30% base)$450,00030%
Low-income bonus (+20%, if allocated)$300,00020%
State rebate$75,0005%
Total incentives$825,00055%
Project out-of-pocket$675,00045%

A REAP grant could add up to 25% for an eligible rural small business or agricultural producer owner, but under the October 2026 rule it arrives only after the system has run for 12 months, so it can't finance construction. A community solar project owned by a nonprofit isn't an eligible REAP applicant at all. The same project starting construction today gets no federal solar credit unless it's placed in service by December 31, 2027.

The remaining 45% has to come from debt or equity. A REAP guaranteed loan (for an eligible owner), a state green bank, or a CDFI can fill it, but the project economics are much thinner than the 2023-2024 stacks many developers still quote.

Bottom line: For wind and solar that missed the July 4, 2026 construction deadline, the binding constraint is now the December 31, 2027 placed-in-service date, on top of interconnection queues, permitting timelines, supply chain delays, and workforce availability. If you're applying for grants, make sure your project is shovel-ready. Programs are prioritizing applicants who can deploy quickly.

What DOE Doesn't Tell You

Here's what the funding announcements don't make clear.

Cost share requirements are real. Most DOE grants require 20% to 50% cost share from non-federal sources. A REAP grant covers at most 25% of eligible project costs, and a REAP grant plus guaranteed loan can't exceed 75%, so the owner must bring at least 25% from other sources. You need to have matching funds identified before you apply, and "we'll figure it out later" won't pass review.

Prevailing wage requirements affect project economics. The IRA's full tax credit rates (30% ITC, full PTC) require paying prevailing wages and using registered apprentices for projects over 1MW. The reduced rate without prevailing wage compliance is only 6% ITC. For small projects, prevailing wage compliance can add 10% to 20% to labor costs, but the 30% credit more than compensates. Budget for it.

Environmental review can delay your project by 6 to 12 months. Federal grants and tax credits can trigger NEPA review, Section 106 historic preservation review, and endangered species consultation. DOE grants almost always require NEPA. Start your environmental documentation early and factor the timeline into your project plan.

The domestic content bonus is hard to qualify for. The IRA offers a 10% ITC bonus for meeting domestic content thresholds, but the current supply chain makes full compliance difficult. Steel and iron must be 100% domestic. Manufactured products must meet percentage-of-cost tests that are complex to document. Don't count on this bonus unless you've confirmed your supply chain meets the requirements.

Warning: stacking IRA tax credits with DOE grants requires careful legal structure that many renewable energy developers underestimate in complexity, and treating them as additive without tax counsel is a trap. Developers who assume they can layer a 30% ITC and a DOE grant on the same project without legal complications can discover that the direct pay rules for tax-exempt entities and grant basis reduction rules make the combined benefits substantially less than they modeled. Projects that model tax credit and grant stacking without an experienced energy tax attorney can overestimate their project ROI.

Application Tips for Competitive DOE Grants

DOE EERE grants are among the most competitive in the federal government. Here's what differentiates winning applications.

Align precisely with the FOA. Each FOA specifies topic areas, technical metrics, and evaluation criteria in detail. Don't submit a general proposal. Tailor every section to the specific topic area and address every evaluation criterion explicitly.

Include credible cost-reduction pathways. DOE wants to fund technologies that will become cheaper over time and eventually compete without subsidies. Show how your project reduces costs for the broader market, not just for your organization.

Build a strong team. DOE evaluates team capabilities heavily. Include qualified technical leads, experienced project managers, and relevant subcontractors. Letters of commitment from team members strengthen your application.

Budget for real costs. Underbudgeting signals that you haven't thought through the project carefully. Include adequate labor rates, realistic material costs, and contingency appropriate to the project's risk level.

Farms and rural businesses comparing REAP with other USDA money can start with grants for rural small businesses. To see open federal and foundation grants that match your organization and state, use the Grantsights grant search.


Sources

Largest awards active in FY2024

One row per recipient, its largest award | 4,449 Assistance Listing records | Avg: $163K

REAL DATA
1

Quillys Magnolia RV Park

MS

$1.0M
2

Dairy Distillery Alliance, LLC

MI

$1.0M

Use the visible recipient rows as free source context

This program has no reviewed paid report today.

No reviewed paid report is currently offered for this program. The visible source rows remain free.

Frequently Asked Questions

How much total federal funding is available for renewable energy projects?

Less than the 2022 headlines suggest. The Inflation Reduction Act authorized about $370 billion in energy and climate investments, mostly as tax credits, but P.L. 119-21 (signed July 4, 2025) cut much of it back. It repealed the EPA Greenhouse Gas Reduction Fund and rescinded its unobligated money, rescinded unspent DOE loan credit subsidy, and set a cutoff for wind and solar tax credits: projects that didn't begin construction by July 4, 2026 must be placed in service by December 31, 2027. DOE grant funding now depends on each year's appropriation, and USDA isn't accepting REAP grant applications, though REAP guaranteed loans remain open. On October 20, 2026, none of the 17 DOE and USDA Rural Development opportunities posted on Grants.gov paid for installing a standard solar or wind system.

Can small businesses get grants for solar panel installation?

Fewer than before. USDA isn't taking REAP grant applications now, and under a rule that took effect October 16, 2026, the next REAP grants go only to systems that are already built and running, backed by 12 months of production data. The grant covers at most 25% of project cost, from $1,500 up to $500,000 for a renewable energy system, and only agricultural producers and rural small businesses qualify. A REAP guaranteed loan is the live option for building now. The federal 30% clean electricity investment credit still applies to solar, but only if construction began by July 4, 2026 or the system is placed in service by December 31, 2027. Some states offer rebates, and SBA 7(a) and 504 loans can finance the rest.

What is the EPA Greenhouse Gas Reduction Fund and who can apply?

No one can apply now. The GGRF received $27 billion through the Inflation Reduction Act: $14 billion for the National Clean Investment Fund, $6 billion for the Clean Communities Investment Accelerator, and $7 billion for Solar for All. EPA terminated the $20 billion in NCIF and CCIA grants on March 11, 2025. P.L. 119-21 repealed the GGRF's authority and rescinded its unobligated funds in July 2025, and EPA ended Solar for All on August 7, 2025. The full D.C. Circuit ruled for the NCIF and CCIA grantees on August 4, 2026 but stayed its judgment pending a Supreme Court application, and a Rhode Island federal court vacated the Solar for All termination on September 18, 2026 while EPA weighed an appeal. Don't plan a project around GGRF financing without a lender's or state administrator's written commitment.

Are there specific renewable energy grants for tribal communities?

Yes, but the main 2026 round has closed. DOE's Office of Indian Energy announced the $50 million Unleashing Tribal Energy Development funding opportunity on March 25, 2026 for tribal energy planning and development, and applications were due July 24, 2026. Tribes, Alaska Native regional and village corporations, intertribal organizations, Tribal Energy Development Organizations and tribal colleges could apply. Projects on Indian land can qualify for the low-income communities bonus on the clean electricity investment credit, subject to the same 2026 and 2027 wind and solar deadlines as other projects. USDA REAP accepts tribal business entities and agricultural producers, but REAP grant applications are paused. P.L. 119-21 also rescinded the unobligated credit subsidy for DOE's Tribal Energy Loan Guarantee Program.

How do IRA clean energy tax credits work for nonprofits and governments?

The IRA created elective pay (also called direct pay), which lets tax-exempt organizations, state and local governments, tribal governments, and rural electric cooperatives receive the value of certain clean energy credits as a cash payment from the IRS. The entity must register with the IRS before it files and put the registration number on its return. A nonprofit's $500,000 solar system can still earn a $150,000 payment (30%), but only if construction began by July 4, 2026 or the system is placed in service by December 31, 2027. Elective pay lasts only as long as the underlying credit does: for wind and solar that's the 2027 cutoff, while storage, geothermal, and other clean electricity credits keep the full rate for projects that begin construction through 2033.

Does DOE have grants to install solar panels right now?

No. On October 20, 2026, Grants.gov listed 11 DOE opportunities, and none paid for installing a commercially available solar or wind system. Six were notices of intent, requests for information or an old notice with no funding attached, and the other 5 funded research, technology scale-up, nuclear licensing or university scholarships. DOE's research funding fits new technology. A standard installation should look at the investment credit, state and utility incentives, and loans instead.

Last updated October 20, 2026. Corrected October 20, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.