How to Write a Grant Work Plan (With Template)
Updated 12 official sources
Quick Answer: A grant work plan is a table that maps your project's objectives, activities, responsible staff, timeline, and measurable outputs for each quarter of the grant period.
Full answer and how we checked it
2 CFR 200 doesn't prescribe a format; each NOFO does. Federal reviewers score work plans on specificity, feasibility, and alignment with your budget and evaluation plan. Most agencies want a table format organized by objective, not narrative paragraphs.
Data note: Amounts may shift with annual appropriations.
In this guide
- Work Plan vs. Project Timeline vs. Logic Model
- Standard Work Plan Format
- Full Work Plan Example
- Agency-Specific Work Plan Formats
- How the Work Plan Connects to Other Sections
- Multi-Year Work Plans
- How Reviewers Evaluate Work Plans
- Common Work Plan Mistakes
- Work Plan Checklist
- Related Guides
- What Federal NOFOs Don't Tell You About Grant Work Plans
- How Grantsights Checked This Guide
- Sources
If you're a grant writer putting together a work plan for a federal or foundation proposal, this section is where reviewers assess whether your program design is realistic.
The work plan is the operational backbone of your grant proposal. While your needs statement explains why the project matters and your program design describes the approach, the work plan shows exactly how you'll execute it, month by month, with named staff and measurable milestones.
Reviewers use the work plan to test whether your project is realistic. They're checking: Are the activities specific enough to be actionable? Is the timeline feasible? Does every activity have someone responsible for it? Do the milestones show measurable progress? And does all of this match what's in the budget?
A vague work plan signals a vague project. SAMHSA's manual on developing a competitive application (opens in a new tab) tells applicants to list every activity the NOFO requires in the project timeline and to name the position, not just the person, responsible for each one. The Department of Education scores many proposals on "Quality of the management plan" under 34 CFR 75.210 (opens in a new tab), including whether the plan can achieve objectives on time and within budget. HRSA introduced a Standardized Work Plan (SWP) form (OMB 0906-0049) that structures the format for their competitive grants.
This guide covers the standard work plan format, how it connects to your other proposal sections, agency-specific requirements, and the mistakes that cost applicants review points.
Work Plan vs. Project Timeline vs. Logic Model
These three documents are related but serve different purposes. Confusing them is a common mistake, especially when a NOFO asks for a "project timeline" and the applicant submits a logic model instead.
Work Plan
An operational table that answers: What will you do? Who will do it? When? What will it produce?
Organized by objectives and activities, with columns for responsible staff, timeline, and outputs/milestones. The work plan is the most detailed of the three and is the document your project team will actually use to manage day-to-day implementation.
Project Timeline
A simplified visual (usually a Gantt chart or table) showing when major activities and milestones occur across the project period. A timeline is less detailed than a work plan. It shows sequencing and duration but typically doesn't include responsible staff or detailed outputs.
Some NOFOs use "work plan" and "timeline" interchangeably. When that happens, give them the work plan (more detail is better than less), and include a visual timeline as a complement if page limits allow.
Logic Model
A visual diagram mapping the theoretical pathway: Inputs -> Activities -> Outputs -> Short-term Outcomes -> Long-term Outcomes -> Impact. The logic model answers "why will this work?" by showing the causal chain from your resources to your desired results. It doesn't include timelines or responsible staff.
For a deeper dive on logic models, see our logic model guide.
How they connect: Your logic model's "Activities" column becomes the starting point for your work plan. Your work plan's "Outputs" column feeds into your evaluation plan's data collection strategy. Your evaluation plan tracks whether the logic model's predicted outcomes actually occur.
Looking for your next grant?
About once a week, we email a short list of open grant calls with real deadlines from different funders. It lists open calls only.
No spam. Unsubscribe anytime.
Standard Work Plan Format
Most federal grant work plans use a table format. Here's the structure reviewers expect:
| Objective | Activity | Responsible Staff | Timeline (Quarter) | Output / Milestone |
|---|---|---|---|---|
| What you'll achieve | What you'll do to achieve it | Who will do it | When it happens | What it produces |
Column 1: Objectives
Objectives are the measurable outcomes your project will achieve. They should be SMART: Specific, Measurable, Achievable, Relevant, and Time-bound.
Weak objective: "Improve health outcomes in the community."
Strong objective: "By September 30, 2028, 70% of enrolled participants (n=200) will report improved self-management of chronic conditions as measured by the Patient Activation Measure (PAM)."
Number your objectives (Objective 1, Objective 2, etc.) so you can cross-reference them in your budget justification, evaluation plan, and staffing plan.
Most federal work plans have 2 to 5 objectives. More than 5 usually means your objectives are too narrow. Fewer than 2 means they're too broad.
Column 2: Activities
Activities are the specific actions your staff will take to achieve each objective. Each objective should have 3 to 8 activities.
Number activities under each objective (Activity 1.1, 1.2, 1.3 for Objective 1; Activity 2.1, 2.2 for Objective 2). This numbering system lets you reference specific activities in other proposal sections.
What a good activity looks like:
- "Recruit 50 participants per quarter through community health fairs, partner referrals, and targeted outreach in ZIP codes 21201 to 21205" (Activity 1.1)
- "Deliver 12 weekly group education sessions per cycle (4 cycles per year) using the Stanford Chronic Disease Self-Management Program curriculum" (Activity 2.1)
- "Administer the Patient Activation Measure at enrollment, 6 months, and 12 months for all participants" (Activity 3.1)
What a bad activity looks like:
- "Provide services to the target population" (too vague)
- "Set up email account for Program Coordinator, order office supplies, schedule staff meeting for Week 1, create sign-in sheets" (too granular)
Column 3: Responsible Staff
Name the position (not the person, unless they're key personnel) responsible for each activity. Use the same position titles from your staffing plan.
If multiple staff share responsibility, designate a lead. "Program Coordinator (lead); Community Health Workers" is clearer than listing 4 names with no indication of who's accountable.
Column 4: Timeline
Show which quarter(s) each activity occurs in. For a 12-month project:
- Q1 = Months 1 to 3
- Q2 = Months 4 to 6
- Q3 = Months 7 to 9
- Q4 = Months 10 to 12
Use "X" marks or shading to indicate active quarters. Some activities span the full year (ongoing service delivery). Others are one-time events (Year 1 staff training, final report submission).
Column 5: Outputs / Milestones
Outputs are the tangible, countable products of each activity. Milestones are checkpoints that demonstrate progress.
Outputs: "150 participants enrolled," "48 group sessions delivered," "4 quarterly reports submitted" Milestones: "Curriculum adaptation completed by end of Q1," "Partnership MOUs executed by Month 2," "Midpoint evaluation report submitted by Q6"
Make outputs quantifiable. "Training provided" isn't an output. "120 staff trained in trauma-informed care across 6 training sessions" is.
Full Work Plan Example
Here's a sample work plan for a hypothetical 12-month community health grant ($400,000):
Objective 1: By September 30, 2027, enroll 200 adults with unmanaged chronic conditions from ZIP codes 21201 to 21205 in the Healthy Living program.
| Activity | Responsible Staff | Q1 | Q2 | Q3 | Q4 | Output |
|---|---|---|---|---|---|---|
| 1.1 Establish referral partnerships with 4 FQHCs and 2 hospital systems | Program Director | X | 6 signed referral agreements | |||
| 1.2 Conduct community outreach at 8 health fairs and 12 community events | Outreach Coordinator; CHWs | X | X | X | X | 200 participants enrolled |
| 1.3 Complete intake assessments for all enrolled participants | Program Coordinator | X | X | X | X | 200 intake assessments completed |
| 1.4 Assign each participant to a Community Health Worker (max 25:1 ratio) | Program Coordinator | X | X | X | X | All participants assigned within 5 days of enrollment |
Objective 2: By September 30, 2027, 70% of enrolled participants will demonstrate improved self-management of chronic conditions as measured by the Patient Activation Measure.
| Activity | Responsible Staff | Q1 | Q2 | Q3 | Q4 | Output |
|---|---|---|---|---|---|---|
| 2.1 Deliver 12-week group education series (4 cycles of 15 to 20 participants each) using Stanford CDSMP | Program Coordinator; CHWs | X | X | X | X | 48 group sessions; 160 participants completing 8+ sessions |
| 2.2 Conduct monthly individual check-in calls with enrolled participants | CHWs | X | X | X | 1,800 check-in calls completed | |
| 2.3 Connect participants to primary care, nutrition, and behavioral health resources | CHWs | X | X | X | X | 400 referrals made; 70% confirmed attendance |
Objective 3: Evaluate program effectiveness and report results to funder and community stakeholders.
| Activity | Responsible Staff | Q1 | Q2 | Q3 | Q4 | Output |
|---|---|---|---|---|---|---|
| 3.1 Administer PAM at enrollment, 6 months, and program exit | Data Analyst; CHWs | X | X | X | X | 600 PAM assessments completed |
| 3.2 Enter all participant data into Apricot within 48 hours of collection | Data Analyst | X | X | X | X | 100% data entry compliance |
| 3.3 Submit quarterly progress reports to funder | Program Director | X | X | X | 4 quarterly reports submitted | |
| 3.4 Prepare and disseminate final evaluation report | External Evaluator; Program Director | X | Final report completed and distributed to 50+ stakeholders |
Agency-Specific Work Plan Formats
SAMHSA
SAMHSA's Developing a Competitive Application manual (March 2025) includes a sample timeline, not a full work plan template: each row is a key activity with the responsible staff position in parentheses, marked by month for Year 1 and in 6-month blocks for later years. The manual says to include every activity the NOFO requires. (Its "Appendix D: Sample Work Plan" is a plan for writing the application, not a project work plan.) Follow the specific NOFO for any required goal and objective format. SAMHSA grants typically have 3 to 5 goals with objectives under each. SAMHSA places heavy emphasis on using evidence-based practices, so your activities should reference the specific EBP you're implementing and describe it with enough detail that a reviewer can verify it's being implemented with fidelity.
SAMHSA also expects your work plan to include Government Performance and Results Act (GPRA) measures. These are standardized outcome measures that all SAMHSA grantees must report through the SPARS data system. Your work plan activities should include data collection tasks that correspond to GPRA requirements.
Department of Education
ED evaluates proposals against EDGAR selection criteria, which include "Quality of the Project Design" and "Quality of the Management Plan." The management plan functions as a work plan. ED reviewers look for:
- Clear milestones and timelines
- Responsibilities assigned to specific team members
- Alignment between the management plan, budget, and evaluation
- Evidence that the applicant has considered potential barriers and has contingency plans
ED doesn't provide a standardized work plan template, so use the table format described above. Number your objectives to match ED's priorities as stated in the NOFO.
HRSA
HRSA introduced the Standardized Work Plan (SWP) form, which requires applicants to organize activities by budget year with specific fields for goals, objectives, sub-objectives, activities, and deliverables. If your NOFO references the SWP, you must use HRSA's format rather than creating your own.
The SWP requires that each budget year's activities are listed separately, even if activities repeat across years. This means a 3-year grant has three distinct work plan sections. Targets should increase from year to year as the program ramps up.
ACF (Administration for Children and Families)
ACF grants typically request a work plan within the project narrative rather than as a separate attachment. Use a table format embedded in the narrative, followed by a brief paragraph explaining the sequencing and logic behind your activity timeline.
ACF reviewers pay close attention to whether activities are realistic given the staffing and budget. If you're proposing to serve 500 families with 3 case managers, they'll flag that as unfeasible.
How the Work Plan Connects to Other Sections
Your work plan doesn't exist in isolation. It should align with and reference every other major section of your proposal.
Budget
Every activity in your work plan should have a corresponding cost in your budget. If Activity 2.1 involves delivering 48 group sessions, your budget should include the curriculum materials, staff time, and space rental for those sessions. If your budget includes $10,000 for equipment, your work plan should show when that equipment will be purchased and which activities it supports.
Under federal guidelines, equipment is defined as tangible personal property with a per-unit cost of $10,000 or more and a useful life of more than one year (2 CFR 200.1). Equipment purchases should appear in your Year 1 work plan timeline.
Staffing Plan
Each "Responsible Staff" entry in your work plan should correspond to a position in your staffing plan. If your work plan assigns 8 activities to the Program Coordinator, your staffing plan should show enough FTE for that person to actually complete those activities.
Evaluation Plan
Your evaluation plan describes how you'll measure whether objectives are achieved. The work plan should include data collection activities (administering surveys, conducting interviews, pulling database reports) that feed into the evaluation. Cross-reference: "Data collection activities supporting the evaluation plan are included as Activities 3.1, 3.2, and 3.3 in the work plan."
Needs Statement
Your objectives should directly address the needs identified in your needs statement. If your needs statement documents that 40% of adults in the target area have unmanaged diabetes, your work plan's objectives should target that specific problem with measurable improvement goals.
Multi-Year Work Plans
Grants of 2 to 5 years require work plans that evolve over time. Here's a typical phasing structure:
Year 1: Startup and Ramp-Up
Activities focus on:
- Hiring and training staff
- Finalizing partnerships and executing MOUs
- Adapting curricula or program materials for the local context
- Establishing data collection systems
- Initial participant recruitment
- Baseline data collection
Set Year 1 enrollment targets below full implementation levels, because you'll likely spend the first 2 to 3 months getting the program running.
Years 2 to 4: Full Implementation
Activities focus on:
- Full-scale service delivery at target enrollment levels
- Ongoing data collection and reporting
- Continuous quality improvement based on data
- Staff professional development
- Midpoint evaluation (usually end of Year 2 or beginning of Year 3)
Final Year: Sustainability and Closeout
Activities focus on:
- Sustainability planning (identifying continued funding sources, integrating the program into existing operations)
- Dissemination of results (reports, presentations, publications)
- Final data collection and evaluation
- Closeout activities (financial reconciliation, final progress reports, equipment disposition)
- Transition planning for participants
How Reviewers Evaluate Work Plans
Based on federal review criteria across SAMHSA, ED, HRSA, and ACF, reviewers assess work plans on these dimensions:
Specificity. Are activities detailed enough to be actionable? Can the reviewer picture what will actually happen?
Feasibility. Can this team, with this budget, realistically accomplish these activities in this timeframe? Reviewers check staffing levels against activity volume. They check the timeline for unrealistic compression (don't propose launching full services in Month 1 when you haven't hired staff yet).
Alignment. Does the work plan match the budget, staffing plan, evaluation plan, and needs statement? Inconsistencies between sections are one of the most common reasons proposals score below the funding line.
Measurability. Does every objective have a clear target with a number, a measurement tool, and a deadline? Are outputs quantified?
Logic. Do activities logically lead to the stated objectives? Is the sequencing reasonable (you can't evaluate an intervention before you've delivered it)?
Common Work Plan Mistakes
Mistake 1: Activities Too Vague
"Provide case management services" doesn't tell a reviewer what case management looks like in your program. How many sessions? What model? How many clients per case manager? Specify: "Each case manager will maintain a caseload of 25 active clients and conduct a minimum of 2 face-to-face contacts per client per month using the Strengths-Based Case Management model."
Mistake 2: Activities Too Granular
Listing every administrative task ("set up email, order supplies, schedule meeting") wastes page space and doesn't help reviewers understand your program. Focus on programmatic activities that directly serve participants or produce deliverables.
Mistake 3: Timeline Not Aligned with Budget
If your budget shows staff starting in Month 1, but your work plan shows hiring happening in Month 3, you've budgeted 2 months of salary for someone who isn't working yet. Or if your work plan shows buying equipment in Q3, but the equipment is in the Year 1 budget with no adjustment for partial-year use, there's a mismatch.
Mistake 4: Objectives That Aren't Measurable
"Improve community health" isn't measurable. "Reduce the rate of emergency department visits among enrolled participants by 15% compared to baseline, as measured by hospital claims data" is measurable. Every objective needs a number, a measurement method, and a timeframe.
Mistake 5: No Contingency Language
Reviewers know things don't always go as planned. A brief note about contingencies shows maturity: "If enrollment targets are not met by Q2, the Program Director will activate secondary recruitment strategies including door-to-door outreach in priority census tracts and expanded social media outreach."
Mistake 6: Not Using the Agency's Template
If HRSA provides the Standardized Work Plan form, use it. If SAMHSA's NOFO includes a sample format, follow it. Submitting your own format when the agency provides a template signals that you didn't read the instructions carefully, and instructions-following is itself a signal reviewers use to evaluate organizational capacity.
Work Plan Checklist
Before submitting, verify:
- Every objective is numbered and SMART (Specific, Measurable, Achievable, Relevant, Time-bound)
- Every activity is numbered and tied to an objective
- Every activity has a responsible staff member (matching your staffing plan titles)
- Every activity has a timeline (quarter or month)
- Every activity has a measurable output or milestone
- Activities align with your budget (no unfunded activities, no budgeted items without corresponding activities)
- The timeline is feasible (hiring before service delivery, data collection before analysis)
- Multi-year plans show progression (ramp-up, full implementation, sustainability)
- The format matches the NOFO requirements or agency template
- Objectives address the needs identified in your needs statement
- Data collection activities correspond to your evaluation plan
- You've used the numbering system from the NOFO's review criteria
Related Guides
What Federal NOFOs Don't Tell You About Grant Work Plans
Reviewers compare your work plan to your budget, and inconsistencies cost you points. If your work plan shows three staff members delivering services but your budget only funds two, reviewers will flag the mismatch. Align every activity in your work plan to a specific budget line before submitting.
The level of detail matters more than the scope of activities. A work plan with five well-defined activities, each with clear milestones, responsible parties, and measurable outputs, will score higher than one with fifteen vague activities. Don't bother listing every minor task. Focus on the activities that drive your outcomes.
Quarterly milestones are the sweet spot for most federal grants. Monthly milestones feel micromanaged, and annual milestones are too vague for reviewers to evaluate. Break your project into quarterly checkpoints with specific, measurable deliverables at each stage.
How Grantsights Checked This Guide
Source review by Grantsights: we rechecked federal merit-review rules, SAMHSA application guidance, HRSA work-plan forms, and ED review language on June 3, 2026. The audit question was whether the page helps applicants convert a project idea into a scored implementation table.
| Source checked | What it proves | Applicant action |
|---|---|---|
| 2 CFR 200.205 (opens in a new tab) | Competitive grants use merit review. | Match work-plan rows to scored criteria. |
| SAMHSA grants (opens in a new tab) | SAMHSA posts NOFOs and application materials by program. | Use the specific NOFO work-plan format. |
| HRSA grants (opens in a new tab) | HRSA posts funding opportunities and forms. | Look for Standardized Work Plan requirements before drafting. |
| ED discretionary grants (opens in a new tab) | ED applicants follow program-specific application packages. | Translate "Quality of the management plan" criteria into work-plan rows. |
| Grants.gov workspace (opens in a new tab) | Applicants submit federal packages through Workspace. | Confirm attachments and names before upload. |
Decision checklist: each work-plan row needs an objective, activity, owner, timing, output, and measurement link. A bad fit row says "conduct outreach" without naming audience, count, geography, or responsible position. For example, an applicant should replace "provide services" with "Program Coordinator will enroll 40 participants per quarter through 3 partner referral sites."
According to 2 CFR 200.205, agencies must use merit review for competitive grants. According to SAMHSA, applicants should follow each NOFO's application materials. According to HRSA, funding opportunities and forms are posted by program. According to Grants.gov, Workspace is the federal application package environment.
What Official Sources Don't Tell You
Official NOFOs list required attachments, but they rarely show how reviewers test feasibility from a work plan. Review criteria such as ED's management-plan factors ask whether the plan can be done on time and within budget, so reviewers look for row-level proof that staffing, timing, outputs, and budget match. Use the Grantsights database to pull the notice's work-plan requirements, then have someone outside the project team test the timeline against them before you submit.
Funded work plans tend to be specific about who does what and when, down to the month. Low-scoring work plans often use language like "staff will implement activities" without naming positions, specific deliverables, or measurable outputs tied to each quarter. Check the NOFO's review criteria and make sure every scored element points to at least one numbered work plan row.
A work plan that describes activities in narrative paragraphs instead of a table can score poorly even with a strong program model. Restructure it into a table with quarterly milestones, named positions, and specific output counts (not just "services provided" but "48 individual counseling sessions, 12 group sessions, and 6 family support meetings per quarter").
Sources
- HRSA: Sample Work Plan Template (opens in a new tab)
- HRSA: Standardized Work Plan (SWP) Form (opens in a new tab)
- SAMHSA: Developing a Competitive Grant Application (opens in a new tab)
- ACL: Project Work Plan Sample Template (opens in a new tab)
- U.S. Department of Education: Grant Performance Report Instructions (opens in a new tab)
- 2 CFR Part 200: Uniform Administrative Requirements (opens in a new tab)
Frequently Asked Questions
What is the difference between a work plan and a logic model?
A work plan is an operational document that describes what you'll do, who will do it, and when. It's organized by timeline and focuses on activities and milestones. A logic model is a visual diagram that maps the theoretical pathway from inputs to activities to outputs to outcomes to impact. The logic model answers 'why will this work?' while the work plan answers 'how will we execute it?' Most federal grants require both. Your logic model should inform your work plan: the activities column of the logic model becomes the starting point for the activities in your work plan, but the work plan adds the detail of timing, responsible staff, and measurable milestones that the logic model doesn't include.
Should I use a quarterly or monthly breakdown?
Use quarterly for most federal grants of 12 months or longer. Monthly breakdowns create unnecessarily rigid timelines that are hard to follow exactly, and federal program officers understand that activities shift by a few weeks in practice. However, some NOFOs specifically request monthly timelines, so always check the instructions first. For grants under 12 months, monthly breakdowns make more sense because the project period is compressed. For multi-year grants, use quarterly breakdowns within each year unless the NOFO says otherwise. Agency samples vary: SAMHSA's application manual shows a sample timeline broken out by month for Year 1 and in 6-month blocks after that, and HRSA's Standardized Work Plan form is organized by budget year.
How do I write a multi-year work plan?
Organize the work plan by budget period (usually 12-month increments), then by objective within each period. Year 1 typically emphasizes startup activities: hiring staff, establishing partnerships, developing materials, training, and launching services. Years 2 through 4 focus on full implementation, enrollment targets, and ongoing service delivery. The final year includes sustainability planning, dissemination of results, and closeout activities. Show how targets increase over time. If your enrollment goal is 500 participants over 5 years, you might target 60 in Year 1 (ramp-up), 120 in Years 2 through 4 (full implementation), and 80 in Year 5 (wind-down and transition). HRSA's Standardized Work Plan form requires work plans organized by budget year.
What format do federal agencies expect for work plans?
Most federal agencies expect a table format with columns for objectives, activities, responsible staff, timeline, and outputs or milestones. Some agencies provide their own templates. HRSA uses the Standardized Work Plan (SWP) form with fields for goals, objectives, sub-objectives, activities, and deliverables organized by budget year. SAMHSA's competitive grant application manual shows a sample project timeline that lists each key activity with the responsible staff position and marks the months it happens. The Department of Education's EDGAR selection criteria include 'Quality of the management plan,' which is where a work plan usually gets scored. ACF grants typically request a work plan as a table in the project narrative. If the NOFO provides a template, use it exactly. If not, use the standard table format described in this guide.
How detailed should work plan activities be?
Each activity should be specific enough that someone unfamiliar with your organization could understand what will happen, who will do it, and what the result will be. But don't describe every sub-task. 'Conduct 12 monthly parent education workshops for 20 parents per session, using the Triple P curriculum, at the Jefferson Community Center' is the right level of detail. Breaking that into 'Reserve room at community center, print flyers, distribute flyers, set up chairs, deliver workshop, distribute evaluations' is too granular. A good test: could a reviewer read the activity and estimate how much staff time it requires? If yes, you're at the right level. If the activity is so vague that you can't estimate the effort, it needs more detail.
Last updated October 12, 2026. Corrected October 11, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
Complete Guide
Federal Grant Proposal Guide: Sections & Scoring
Federal grant proposals average 50-100 pages. This guide covers every section and scoring criteria for writing a proposal that reviewers score highly.
How to Write a Data Management Plan for Grants
NIH, NSF, DOE and NASA each want a data management and sharing plan. Compare 5 agencies' rules, page limits and review, plus 2 templates.
How to Write a Grant Dissemination Plan (With Examples)
Write a dissemination plan that scores well with federal reviewers. Covers 6 required components, audience targeting, and budget for 5+ methods.
How to Write a Grant Evaluation Plan (With Examples)
Only 3 of 37 open federal NOFOs scored a separate evaluation plan. Write SMART outcomes, baseline plans, and evaluation budgets that reviewers score.
How to Write a Grant Management Plan (With Examples)
Write a grant management plan reviewers can score: staffing, 2 CFR 200 financial controls, data plans, and the 25 points SAMHSA gives to staffing.
How to Write a Grant Staffing Plan (With Examples)
Build a grant staffing plan that matches your work plan and budget: FTE math, fringe, consultants, and 2 CFR 200.430 effort records reviewers check.