Skip to content

Mississippi Grants 2026: Programs and ARPA Data

Updated 11 official sources

Quick Answer: For a new Mississippi grant, first match the applicant and project to MDA, Mississippi Home Corporation, USDA Rural Development, MDEQ, DRA, or a direct federal program.

Full answer and how we checked it

The MHC HOME Rental cycle is open through October 30, 2026. The DRA Community Infrastructure Fund deadline passed on August 24. For a local ARPA search, use Treasury's April 2026 workbook instead of treating old funds as a new competition. It shows Yazoo City at $2,672,091.18 allocated and $2,229,623.31 spent, and Marshall County at $6,855,446 allocated and $6,498,031.69 spent, through March 31, 2026.

This guide is for: Mississippi cities, counties, nonprofits, housing sponsors, schools, rural service providers, economic-development groups, and researchers checking state or local funding records.

Source review by Grantsights, September 13, 2026: We checked U.S. Treasury's April 2026 SLFRF workbook, Treasury deadline guidance, FEMA declaration and award-data routes, current MDA program pages, the 2026 DRA Community Infrastructure Fund page, current MHC housing notices, USDA Rural Development, MDEQ, and local-government records. Reported amounts can be revised in later government releases.

Data note: Local figures come from recipient and project rows submitted to U.S. Treasury and matched by recipient ID. State-project figures use the separate State of Mississippi recipient record. Amounts are cumulative as of the reporting period shown, not estimates of money open to new applicants.

In this guide

Start Here: New Grant or Existing-Fund Record?

Do this five-part screen before writing:

  1. Name the task. Are you seeking a new award, checking an old ARPA allocation, looking for a contract, or tracing a funded project?
  2. Name the legal applicant. City, county, nonprofit, business, housing owner, school, tribe, water association, or individual.
  3. Name the project and location. Public infrastructure, housing, rural facility, business site, water, transportation, health, or another defined use.
  4. Confirm the current source. Open, closed, forecasted, annual, or ongoing are different application states.
  5. Check readiness. Sponsor authority, site control, engineering, match, UEI, SAM registration, environmental review, and local approvals can control the route.

If you need a current opportunity rather than an ARPA record, build a Mississippi shortlist and then verify the issuing source before applying.

2026 Mississippi routeBest first fitCurrent fact to verify
MDA CDBG Public FacilitiesCity or county public infrastructureMaximum state grant is $600,000 for communities above 3,500 people and $450,000 for smaller communities; at least 51% of beneficiaries must be low- or moderate-income
MDA CDBG Economic DevelopmentPublic infrastructure tied to a business projectMunicipality or county applies; maximum is $20,000 per job or $2.5 million
DRA Community Infrastructure FundDelta-region infrastructure and flood-control projectsThe 2026 proposal deadline passed August 24; use the live program page for award and next-cycle updates
MHC HOME Rental and HTFAffordable rental housing with a qualified sponsor and siteThe FY2026 application is open and due October 30, 2026
USDA Water and Waste DisposalRural water, sewer, solid waste, or stormwaterOngoing applications for eligible areas of 10,000 people or fewer; grants may accompany loans when needed
USDA Community FacilitiesRural health, safety, community, education, or service facilityOngoing applications for public bodies, community nonprofits, and tribes in places of 20,000 people or fewer
MDEQ revolving fundsPublic wastewater and clean-water capital workUse the FY2026 Intended Use Plan and FY2027 ranking notice, not a generic grant search

Get grant deadline alerts by email

About once a week, we email a short list of open grant calls with real deadlines from different funders. It isn't limited to the programs in this guide.

No spam. Unsubscribe anytime.

Mississippi Local ARPA Records Through March 31, 2026

Treasury's April 2026 reporting workbook (opens in a new tab) contains the newest public recipient and project rows used here. Match the exact recipient name, state, and Treasury recipient ID. A place name alone is not enough.

Mississippi recipientRecipient IDAllocationReported expendituresRecord status and next action
Yazoo CityRCP-052673$2,672,091.18$2,229,623.31Eight projects reported through March 31, 2026; inspect the project rows before requesting local contracts or payments
Union CountyRCP-037091$5,596,976.00$5,596,976.00Four projects reported completed; use county records for contracts and closeout evidence
CorinthRCP-052524$3,557,871.33$3,557,871.33Treasury marks the March 31, 2025 report Submitted Closeout Complete
ClintonRCP-052518$6,008,456.01$6,008,456.01Big Black River Sewer Project reported completed through March 31, 2026
GulfportRCP-037791$19,503,534.00$14,075,285.81Water Sewer Improvements reported at least 50% complete through March 31, 2026
Harrison CountyRCP-036143$38,690,671.61$28,960,385.27Thirty-two project rows; use the project name and status before comparing an amount
Marshall CountyRCP-040408$6,855,446.00$6,498,031.69Two projects reported through March 31, 2026; the remaining difference is not an open grant pool

This table does not establish current cash balances, open grant applications, or final audited costs. It summarizes recipient-submitted Treasury data reported through March 31, 2026. Treasury says the workbook includes about 99.6% of Tier 1 and Tier 2 submissions and 92% of annual Tier 5 submissions, so missing records require a local source check.

For example, Gulfport received a $19,503,534 allocation and reported $14,075,285.81 spent on Water Sewer Improvements. That record supports a project-status search. It does not support advertising a new Gulfport grant.

Yazoo City ARPA funds and FEMA grants are different records

Yazoo City's Treasury record reports all $2,672,091.18 obligated and $2,229,623.31 spent across eight projects through March 31, 2026. The three largest amounts not yet reported as fully spent were the Yazoo City Stormwater Drainage Project, Police Department Renovations, and Triangle Cultural Center south-wall work. The Treasury row is the place to start for an ARPA contract, invoice, or spending question.

A FEMA search needs a separate record path. FEMA emergency declaration EM-3640-MS designated Yazoo County for Category B Public Assistance in January 2026. That designation shows an eligible geography and work category. It does not prove that Yazoo City received a specific FEMA award. Check the FEMA declaration map (opens in a new tab), then match the disaster number and applicant in OpenFEMA (opens in a new tab) or the Public Assistance obligations tool (opens in a new tab).

Also keep state names attached to county names. Mississippi County, Arkansas is an Arkansas local government, so its ARPA and infrastructure-grant records do not belong in a Mississippi state guide.

Marshall County Mississippi ARPA Funds: Exact 2024 to 2026 Amounts

According to the Treasury data report, the key public identifier is recipient ID RCP-040408 in U.S. Treasury's SLFRF public data (opens in a new tab). It separates Marshall County's own SLFRF award from state-funded projects that happen to be located in Marshall County.

County allocation and reported spending

Treasury releaseCounty reporting periodWhat the county reported
January 2025 workbookAnnual report through March 31, 2024Allocation of $6,855,446 and the full $6,855,446 claimed under the revenue-loss standard allowance
January 2026 workbookAnnual report through March 31, 20252 projects, $6,855,446 in cumulative obligations, and $5,163,167.63 in cumulative expenditures
April 2026 workbookAnnual report through March 31, 20262 projects, $6,855,446 in cumulative obligations, and $6,498,031.69 in cumulative expenditures

The later releases do not show new allocations. They give updated project classifications and expenditures for the same one-time award.

Marshall County project in latest annual reportStatusCumulative obligationsCumulative expenditures
Revenue Replacement-PayrollCompleted$5,000,192.69$5,000,192.69
Hyline Drive wastewater collection and conveyanceCompleted less than 50%$1,855,253.31$1,497,839.00
Total$6,855,446.00$6,498,031.69

That leaves $357,414.31 not yet reported as expended in the county's annual data through March 31, 2026. It does not mean the amount was available for new applicants. Treasury says SLFRF recipients generally had to obligate funds by December 31, 2024 and must expend obligated funds by December 31, 2026.

According to our analysis, the county had reported 94.8% of its allocation as expended by March 31, 2026. The remaining reported difference sat in the Hyline Drive project, so the right next action is a project-status or payment-record request, not a new-grant inquiry.

Do not double-count the separate state project

Treasury also shows a State of Mississippi project called MCWI 2-Marshall County 551 for the Cayce and Highway 72 sewer system, including Hyline Drive. The state recipient reported $1,975,369 obligated and $1,437,333.45 spent through December 31, 2025.

That state project is related to the same local infrastructure area, but it belongs to the State of Mississippi recipient record. Don't add it to Marshall County's $6,855,446 allocation and call the sum the county award. It isn't a second county allocation, and you can't compare the two reports without keeping their recipient IDs and periods separate.

Our analysis of the two Treasury workbooks found the reporting change that alters the record search:

  • the county allocation stayed $6,855,446
  • the county later split its reporting into payroll and Hyline Drive projects
  • a separate state MCWI record also funds the Hyline area
  • reported spending dates differ because the county and state are in different Treasury reporting tiers

Which “treasurer” or county office should you contact?

Marshall County's official site lists the Board of Supervisors as the body that approves the annual budget and lists a Chancery Clerk. It does not list a separate county treasurer. For a contract, payment, or project-status request:

  1. identify RCP-040408 and the project name
  2. ask the Board office or Chancery Clerk for the relevant budget entry, board minutes, contract, invoice, or payment register
  3. ask whether the record is county SLFRF, state MCWI pass-through funding, or another source
  4. match any amount back to the Treasury reporting period before comparing totals

The county Board meets on the first Monday of each month, subject to the county's holiday rule. The official Board page provides the meeting and contact details.

Are ARPA Funds Still Available in Mississippi in 2026?

ARPA is a funding source, not one permanent public application. For SLFRF, the normal federal obligation deadline passed on December 31, 2024. The general expenditure deadline is December 31, 2026.

A 2026 ARPA search can still lead to:

  • project implementation and payment records
  • bids and contracts under an obligated project
  • subrecipient monitoring or closeout records
  • state pass-through infrastructure work
  • a successor program supported by another appropriation

It should not be treated as proof that a city, county, nonprofit, or business can submit a new ARPA grant application. Check the owning government and the exact solicitation.

Mississippi Development Authority Grants

MDA is the main state route for community and economic-development infrastructure. A search for “Mississippi Department of Commerce business grants” usually belongs here, because Mississippi uses the Mississippi Development Authority name. The CDBG guide explains the federal program rules behind the state route.

CDBG Public Facilities

According to MDA's current incentives page (opens in a new tab):

  • eligible applicants are municipalities and counties
  • public infrastructure is the funded use
  • the maximum state grant is $600,000 for cities and counties above 3,500 people
  • the maximum is $450,000 below that population threshold
  • at least 51% of beneficiaries must be low- or moderate-income

A nonprofit, water association, or business with a good project can still be the wrong direct applicant. Confirm whether a city or county must sponsor the work.

CDBG Economic Development

This route supports publicly owned infrastructure tied to a business location, expansion, or retention project. The municipality or county applies. MDA lists a maximum of $20,000 per job or $2.5 million per project.

Do not start here if the request is simply working capital, equipment for a private business, or startup cash. The public infrastructure, job, and national-objective tests control the route.

Other MDA infrastructure routes

MDA also lists:

  • Development Infrastructure Program grants for municipalities and counties applying on behalf of a new or expanded industry, with a stated maximum of $150,000
  • Small Municipalities and Limited Population Counties support for publicly owned infrastructure
  • Site Development grants for qualifying industrial sites and public or nonprofit economic-development entities

Use MDA's current form library for the actual cycle, workshop, and required forms. Older application PDFs are planning evidence, not proof that the same cycle is open.

Delta Regional Authority Grants

According to the 2026 DRA Community Infrastructure Fund page (opens in a new tab), the 2026 application window is now closed:

2026 CIF factCurrent value
Total funds available$15 million
Minimum award$250,000
Maximum award$1 million
Cycle openedMay 26, 2026
Proposal deadlineAugust 24, 2026, passed

CIF supports basic public infrastructure, transportation infrastructure, and flood-control projects in the DRA region. DRA encourages applicants to work with their Local Development District.

Bad fit: a general nonprofit program, private operating expense, or project outside an eligible DRA county without the required public or regional route.

For a deeper county and Local Development District screen, use the Delta Regional Authority grants guide.

Mississippi Housing Grants

Mississippi Home Corporation owns the main statewide affordable-housing routes.

According to the current MHC HOME Rental page (opens in a new tab), the FY2026 application is open and the sequence is:

  1. application workshop on August 19, 2026
  2. The 2026 HOME Rental application opened August 21, 2026 and is due online by October 30, 2026, according to Mississippi Home Corporation (opens in a new tab); funding announcements are expected January 13, 2027.
  3. online submission deadline on October 30, 2026
  4. funding announcement scheduled for January 13, 2027

MHC also administers HOME, Housing Trust Fund, ESG, HOPWA, LIHTC, and homebuyer-assistance work. Each has its own applicant and use rules. A household seeking assistance should use the consumer or counseling route. A developer or nonprofit housing sponsor should use the applicable NOFA and financing stack.

USDA Rural Development in Mississippi

Two ongoing programs cover many Mississippi community projects:

Water and Waste Disposal

According to USDA, Water and Waste Disposal (opens in a new tab) accepts applications on an ongoing basis and serves eligible rural areas and towns of 10,000 people or fewer. Eligible applicants include most state and local governments, private nonprofits, and federally recognized tribes. The USDA water grants guide compares this route with nearby infrastructure sources.

Funding can support drinking water, sewer, solid waste, and stormwater systems. The core product is long-term financing; grant support may be combined with a loan when needed to keep user costs reasonable.

Community Facilities

USDA reports that Community Facilities (opens in a new tab) accepts ongoing applications from public bodies, community nonprofits, and federally recognized tribes in rural places of 20,000 people or fewer.

Eligible facilities can include health, public safety, community, educational, food-system, and public-service projects. USDA says preparation can take weeks to months, so contact the Mississippi office before completing forms.

Mississippi Environmental and Water Funding

MDEQ's Water Pollution Control Revolving Loan Fund (opens in a new tab) publishes the current FY2026 Intended Use Plan and FY2027 request-for-ranking notice.

This is a capital-finance route, not a simple unrestricted grant. Before choosing MDEQ, MDA CDBG, USDA, DRA, or MCWI-related funding, compare:

  • service area and applicant authority
  • project type and public purpose
  • planning and engineering status
  • affordability and repayment capacity
  • match or co-funding
  • environmental review
  • ranking-cycle timing

How to Apply for Mississippi Grants

Prerequisites before step one

Have these facts ready:

  • legal applicant name and authority
  • project address and service area
  • ownership or site-control status
  • problem statement backed by local data
  • total project cost and funding gap
  • engineering or architectural status for capital work
  • match and debt capacity
  • UEI and active SAM registration when required
  • board, council, or sponsor approval path

If the source requires a UEI and active registration, use the SAM.gov registration guide before the application window gets tight.

Step 1: Classify the request

Separate a new grant from an allocation lookup, contract search, loan request, benefit application, or project-finance stack. This prevents the Marshall County ARPA mistake: an obligated historical award is not a new 2026 competition.

Step 2: Match the applicant

Use the official eligibility language. A business-benefit project may require a city or county applicant. A rural facility may require a public body, nonprofit, or tribe. A housing route may require a qualified owner, developer, or service provider.

Step 3: Match geography and use

Check Delta, Gulf Coast, rural-population, low- and moderate-income, distressed-area, and service-area rules. A program name can sound right while the location or use is wrong.

Step 4: Verify the live cycle

Use the current program page, NOFA, form library, or funding notice. Record:

  • open and close dates
  • award or finance type
  • applicant type
  • match
  • required sponsor
  • pre-application or workshop
  • submission system

Step 5: Run the readiness screen

For a capital project, confirm site control, preliminary design, cost estimate, environmental path, operating plan, and local approvals. For a service grant, confirm staffing, target population, evidence, budget, partner roles, and reporting capacity. Federal pass-through recipients should also review allowable-cost rules before committing the budget.

Step 6: Choose apply, prepare, or stop

  • Apply when the source is open and the applicant, geography, use, timing, and readiness all fit.
  • Prepare when the route is recurring or ongoing but a sponsor, registration, design, match, or approval is missing.
  • Stop when the funds are historical, the wrong entity must apply, the project is outside the service area, or the funding product is a loan when repayment is not workable.

Common Mississippi Grant Failure Modes

Failure modeWhy it failsBetter action
Treating an ARPA allocation as an open grantAllocation, obligation, expenditure, contract, and application are different recordsStart with Treasury recipient and project IDs, then check the owning government
Business applies directly to an infrastructure routeMDA may require a municipality or county applicantSecure the public sponsor before proposal work
PDD or LDD contacted near the deadlineRegional partners may need time for project development and routingContact the district when the project is defined, not after forms are due
Old PDF treated as a current cycleAmounts and rules can persist while dates and forms changeVerify the current program page and notice
Capital request has no site or engineering evidenceThe funder cannot assess feasibility, cost, or scheduleBuild the project file before the narrative
Applicant assumes “grant” means no repaymentUSDA and revolving-fund routes often blend loans and limited grant supportTest debt, affordability, and grant-share eligibility early
State and county project amounts are added togetherSeparate recipients can report related work in the same geographyKeep recipient IDs and reporting periods separate

The most common mistake is treating every result that contains “Mississippi” and “grant” as one funding record. Mississippi County, Arkansas, FEMA assistance, local SLFRF awards, and State of Mississippi projects each have a different government, program, recipient ID, and reporting period.

Six Mississippi Route Examples

Applicant situationBetter first routeStop or change course when
Delta town with a flood-control or basic-infrastructure projectDRA CIF, then MDA or USDA co-funding checkCounty or project type is outside DRA rules
Small rural nonprofit replacing a community facilityUSDA Community FacilitiesThe property, service area, or organization cannot meet public-purpose and finance rules
Rural water system with a construction gapUSDA Water and Waste Disposal, MDEQ, or MDA CDBGNo legal authority, engineering path, or sustainable rates
Manufacturer needing public site infrastructureMDA CDBG Economic Development through a city or countyRequest is private working capital or lacks job and public-infrastructure fit
Researcher checking Yazoo City ARPA or FEMA recordsTreasury recipient RCP-052673 for SLFRF; FEMA declaration and OpenFEMA records for disaster assistanceDo not combine the two programs or treat a disaster designation as a paid award
Researcher checking Marshall County ARPA spendingTreasury recipient RCP-040408, then Board and Chancery Clerk recordsDo not treat the reported balance as an open grant pool

What Mississippi Grant Listings Don't Tell You

Official pages explain programs one at a time. They do not always show:

  • whether the user wants a new award or an old spending record
  • which government must sponsor a private-benefit project
  • whether two related projects belong to separate federal recipients
  • whether a grant share is realistic inside a loan-heavy capital package
  • which missing readiness item should stop proposal work

Based on our analysis of the Marshall County Treasury rows, a searcher could see the county's $6.86 million allocation, a separate $1.98 million state MCWI obligation, and Hyline Drive in both descriptions, then incorrectly report one combined county award. Keeping the recipient IDs separate produces the correct answer and points the reader to the right local records.

For coastal projects, use the Gulf Coast grants guide to separate RESTORE, state, federal, and local routes. For new opportunities, search Mississippi grant routes. For award evidence, check the program's own notice and USAspending.gov.

Sources

Best follow-up

Choose the Mississippi route before planning

Mississippi searches can mix state, Delta, rural water, CDBG, restoration, and nonprofit paths. Choose the route before drafting.

Free. No payment on this step.

Next stepSearch Mississippi grant routesSee Mississippi grants

Next steps

Where to go next

These next pages help you move from research into a specific grant choice.

Frequently Asked Questions

How do I find current grants in Mississippi?

Start with the applicant and project, not a general grant list. Cities and counties should check MDA CDBG and infrastructure programs. Delta communities should check DRA. Rural public bodies and nonprofits should check USDA Rural Development. Housing sponsors should check Mississippi Home Corporation. Direct federal applicants should search Grants.gov and then verify the issuing agency page.

How much ARPA money did Marshall County, Mississippi receive?

U.S. Treasury records list a one-time SLFRF allocation of $6,855,446 for Marshall County. The county's latest annual report in Treasury's April 2026 workbook showed two projects, $6,855,446 in cumulative obligations, and $6,498,031.69 in cumulative expenditures through March 31, 2026.

Are Marshall County ARPA funds open for new grant applications in 2026?

No open county grant pool is shown in the Treasury record. The county reported the full allocation as obligated. The federal obligation deadline was December 31, 2024, and the general expenditure deadline is December 31, 2026. A 2026 search should focus on contracts, implementation records, or successor programs.

Who keeps Marshall County grant and budget records?

Marshall County's official site lists the Board of Supervisors as the body that approves the annual budget and lists a Chancery Clerk. It does not list a separate county treasurer. For local records, start with the Board office and Chancery Clerk, then match county documents to the Treasury recipient ID RCP-040408.

Can a Mississippi small business apply directly for MDA CDBG funding?

Usually not. MDA's CDBG Economic Development route funds publicly owned infrastructure through a municipality or county on behalf of a qualifying business location, expansion, or retention project. A business without that public-infrastructure and job-creation fit should use a different finance, procurement, or technical-assistance route.

Can individuals apply for Mississippi grants?

Some housing, home repair, education, arts, and disaster programs serve individuals, but most competitive economic-development and infrastructure grants go to governments, nonprofits, schools, tribes, housing sponsors, or intermediaries. Verify the named applicant types before preparing an application.

How much ARPA funding did Yazoo City, Mississippi report?

Treasury's April 2026 workbook lists Yazoo City recipient RCP-052673 with a $2,672,091.18 allocation, eight projects, $2,672,091.18 obligated, and $2,229,623.31 spent through March 31, 2026. Those figures describe the city's SLFRF record, not a new application pool.

Last updated October 10, 2026. Corrected October 10, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.