Mississippi Grants 2026: Programs and ARPA Data
Updated 11 official sources
Quick Answer: For a new Mississippi grant, first match the applicant and project to MDA, Mississippi Home Corporation, USDA Rural Development, MDEQ, DRA, or a direct federal program.
Full answer and how we checked it
The MHC HOME Rental cycle is open through October 30, 2026. The DRA Community Infrastructure Fund deadline passed on August 24. For a local ARPA search, use Treasury's April 2026 workbook instead of treating old funds as a new competition. It shows Yazoo City at $2,672,091.18 allocated and $2,229,623.31 spent, and Marshall County at $6,855,446 allocated and $6,498,031.69 spent, through March 31, 2026.
This guide is for: Mississippi cities, counties, nonprofits, housing sponsors, schools, rural service providers, economic-development groups, and researchers checking state or local funding records.
Source review by Grantsights, September 13, 2026: We checked U.S. Treasury's April 2026 SLFRF workbook, Treasury deadline guidance, FEMA declaration and award-data routes, current MDA program pages, the 2026 DRA Community Infrastructure Fund page, current MHC housing notices, USDA Rural Development, MDEQ, and local-government records. Reported amounts can be revised in later government releases.
Data note: Local figures come from recipient and project rows submitted to U.S. Treasury and matched by recipient ID. State-project figures use the separate State of Mississippi recipient record. Amounts are cumulative as of the reporting period shown, not estimates of money open to new applicants.
In this guide
- Start Here: New Grant or Existing-Fund Record?
- Mississippi Local ARPA Records Through March 31, 2026
- Marshall County Mississippi ARPA Funds: Exact 2024 to 2026 Amounts
- Are ARPA Funds Still Available in Mississippi in 2026?
- Mississippi Development Authority Grants
- Delta Regional Authority Grants
- Mississippi Housing Grants
- USDA Rural Development in Mississippi
- Mississippi Environmental and Water Funding
- How to Apply for Mississippi Grants
- Common Mississippi Grant Failure Modes
- Six Mississippi Route Examples
- What Mississippi Grant Listings Don't Tell You
- Related Guides
- Sources
Start Here: New Grant or Existing-Fund Record?
Do this five-part screen before writing:
- Name the task. Are you seeking a new award, checking an old ARPA allocation, looking for a contract, or tracing a funded project?
- Name the legal applicant. City, county, nonprofit, business, housing owner, school, tribe, water association, or individual.
- Name the project and location. Public infrastructure, housing, rural facility, business site, water, transportation, health, or another defined use.
- Confirm the current source. Open, closed, forecasted, annual, or ongoing are different application states.
- Check readiness. Sponsor authority, site control, engineering, match, UEI, SAM registration, environmental review, and local approvals can control the route.
If you need a current opportunity rather than an ARPA record, build a Mississippi shortlist and then verify the issuing source before applying.
| 2026 Mississippi route | Best first fit | Current fact to verify |
|---|---|---|
| MDA CDBG Public Facilities | City or county public infrastructure | Maximum state grant is $600,000 for communities above 3,500 people and $450,000 for smaller communities; at least 51% of beneficiaries must be low- or moderate-income |
| MDA CDBG Economic Development | Public infrastructure tied to a business project | Municipality or county applies; maximum is $20,000 per job or $2.5 million |
| DRA Community Infrastructure Fund | Delta-region infrastructure and flood-control projects | The 2026 proposal deadline passed August 24; use the live program page for award and next-cycle updates |
| MHC HOME Rental and HTF | Affordable rental housing with a qualified sponsor and site | The FY2026 application is open and due October 30, 2026 |
| USDA Water and Waste Disposal | Rural water, sewer, solid waste, or stormwater | Ongoing applications for eligible areas of 10,000 people or fewer; grants may accompany loans when needed |
| USDA Community Facilities | Rural health, safety, community, education, or service facility | Ongoing applications for public bodies, community nonprofits, and tribes in places of 20,000 people or fewer |
| MDEQ revolving funds | Public wastewater and clean-water capital work | Use the FY2026 Intended Use Plan and FY2027 ranking notice, not a generic grant search |
Get grant deadline alerts by email
About once a week, we email a short list of open grant calls with real deadlines from different funders. It isn't limited to the programs in this guide.
No spam. Unsubscribe anytime.
Mississippi Local ARPA Records Through March 31, 2026
Treasury's April 2026 reporting workbook (opens in a new tab) contains the newest public recipient and project rows used here. Match the exact recipient name, state, and Treasury recipient ID. A place name alone is not enough.
| Mississippi recipient | Recipient ID | Allocation | Reported expenditures | Record status and next action |
|---|---|---|---|---|
| Yazoo City | RCP-052673 | $2,672,091.18 | $2,229,623.31 | Eight projects reported through March 31, 2026; inspect the project rows before requesting local contracts or payments |
| Union County | RCP-037091 | $5,596,976.00 | $5,596,976.00 | Four projects reported completed; use county records for contracts and closeout evidence |
| Corinth | RCP-052524 | $3,557,871.33 | $3,557,871.33 | Treasury marks the March 31, 2025 report Submitted Closeout Complete |
| Clinton | RCP-052518 | $6,008,456.01 | $6,008,456.01 | Big Black River Sewer Project reported completed through March 31, 2026 |
| Gulfport | RCP-037791 | $19,503,534.00 | $14,075,285.81 | Water Sewer Improvements reported at least 50% complete through March 31, 2026 |
| Harrison County | RCP-036143 | $38,690,671.61 | $28,960,385.27 | Thirty-two project rows; use the project name and status before comparing an amount |
| Marshall County | RCP-040408 | $6,855,446.00 | $6,498,031.69 | Two projects reported through March 31, 2026; the remaining difference is not an open grant pool |
This table does not establish current cash balances, open grant applications, or final audited costs. It summarizes recipient-submitted Treasury data reported through March 31, 2026. Treasury says the workbook includes about 99.6% of Tier 1 and Tier 2 submissions and 92% of annual Tier 5 submissions, so missing records require a local source check.
For example, Gulfport received a $19,503,534 allocation and reported $14,075,285.81 spent on Water Sewer Improvements. That record supports a project-status search. It does not support advertising a new Gulfport grant.
Yazoo City ARPA funds and FEMA grants are different records
Yazoo City's Treasury record reports all $2,672,091.18 obligated and $2,229,623.31 spent across eight projects through March 31, 2026. The three largest amounts not yet reported as fully spent were the Yazoo City Stormwater Drainage Project, Police Department Renovations, and Triangle Cultural Center south-wall work. The Treasury row is the place to start for an ARPA contract, invoice, or spending question.
A FEMA search needs a separate record path. FEMA emergency declaration EM-3640-MS designated Yazoo County for Category B Public Assistance in January 2026. That designation shows an eligible geography and work category. It does not prove that Yazoo City received a specific FEMA award. Check the FEMA declaration map (opens in a new tab), then match the disaster number and applicant in OpenFEMA (opens in a new tab) or the Public Assistance obligations tool (opens in a new tab).
Also keep state names attached to county names. Mississippi County, Arkansas is an Arkansas local government, so its ARPA and infrastructure-grant records do not belong in a Mississippi state guide.
Marshall County Mississippi ARPA Funds: Exact 2024 to 2026 Amounts
According to the Treasury data report, the key public identifier is recipient ID RCP-040408 in U.S. Treasury's SLFRF public data (opens in a new tab). It separates Marshall County's own SLFRF award from state-funded projects that happen to be located in Marshall County.
County allocation and reported spending
| Treasury release | County reporting period | What the county reported |
|---|---|---|
| January 2025 workbook | Annual report through March 31, 2024 | Allocation of $6,855,446 and the full $6,855,446 claimed under the revenue-loss standard allowance |
| January 2026 workbook | Annual report through March 31, 2025 | 2 projects, $6,855,446 in cumulative obligations, and $5,163,167.63 in cumulative expenditures |
| April 2026 workbook | Annual report through March 31, 2026 | 2 projects, $6,855,446 in cumulative obligations, and $6,498,031.69 in cumulative expenditures |
The later releases do not show new allocations. They give updated project classifications and expenditures for the same one-time award.
| Marshall County project in latest annual report | Status | Cumulative obligations | Cumulative expenditures |
|---|---|---|---|
| Revenue Replacement-Payroll | Completed | $5,000,192.69 | $5,000,192.69 |
| Hyline Drive wastewater collection and conveyance | Completed less than 50% | $1,855,253.31 | $1,497,839.00 |
| Total | $6,855,446.00 | $6,498,031.69 |
That leaves $357,414.31 not yet reported as expended in the county's annual data through March 31, 2026. It does not mean the amount was available for new applicants. Treasury says SLFRF recipients generally had to obligate funds by December 31, 2024 and must expend obligated funds by December 31, 2026.
According to our analysis, the county had reported 94.8% of its allocation as expended by March 31, 2026. The remaining reported difference sat in the Hyline Drive project, so the right next action is a project-status or payment-record request, not a new-grant inquiry.
Do not double-count the separate state project
Treasury also shows a State of Mississippi project called MCWI 2-Marshall County 551 for the Cayce and Highway 72 sewer system, including Hyline Drive. The state recipient reported $1,975,369 obligated and $1,437,333.45 spent through December 31, 2025.
That state project is related to the same local infrastructure area, but it belongs to the State of Mississippi recipient record. Don't add it to Marshall County's $6,855,446 allocation and call the sum the county award. It isn't a second county allocation, and you can't compare the two reports without keeping their recipient IDs and periods separate.
Our analysis of the two Treasury workbooks found the reporting change that alters the record search:
- the county allocation stayed $6,855,446
- the county later split its reporting into payroll and Hyline Drive projects
- a separate state MCWI record also funds the Hyline area
- reported spending dates differ because the county and state are in different Treasury reporting tiers
Which “treasurer” or county office should you contact?
Marshall County's official site lists the Board of Supervisors as the body that approves the annual budget and lists a Chancery Clerk. It does not list a separate county treasurer. For a contract, payment, or project-status request:
- identify
RCP-040408and the project name - ask the Board office or Chancery Clerk for the relevant budget entry, board minutes, contract, invoice, or payment register
- ask whether the record is county SLFRF, state MCWI pass-through funding, or another source
- match any amount back to the Treasury reporting period before comparing totals
The county Board meets on the first Monday of each month, subject to the county's holiday rule. The official Board page provides the meeting and contact details.
Are ARPA Funds Still Available in Mississippi in 2026?
ARPA is a funding source, not one permanent public application. For SLFRF, the normal federal obligation deadline passed on December 31, 2024. The general expenditure deadline is December 31, 2026.
A 2026 ARPA search can still lead to:
- project implementation and payment records
- bids and contracts under an obligated project
- subrecipient monitoring or closeout records
- state pass-through infrastructure work
- a successor program supported by another appropriation
It should not be treated as proof that a city, county, nonprofit, or business can submit a new ARPA grant application. Check the owning government and the exact solicitation.
Mississippi Development Authority Grants
MDA is the main state route for community and economic-development infrastructure. A search for “Mississippi Department of Commerce business grants” usually belongs here, because Mississippi uses the Mississippi Development Authority name. The CDBG guide explains the federal program rules behind the state route.
CDBG Public Facilities
According to MDA's current incentives page (opens in a new tab):
- eligible applicants are municipalities and counties
- public infrastructure is the funded use
- the maximum state grant is $600,000 for cities and counties above 3,500 people
- the maximum is $450,000 below that population threshold
- at least 51% of beneficiaries must be low- or moderate-income
A nonprofit, water association, or business with a good project can still be the wrong direct applicant. Confirm whether a city or county must sponsor the work.
CDBG Economic Development
This route supports publicly owned infrastructure tied to a business location, expansion, or retention project. The municipality or county applies. MDA lists a maximum of $20,000 per job or $2.5 million per project.
Do not start here if the request is simply working capital, equipment for a private business, or startup cash. The public infrastructure, job, and national-objective tests control the route.
Other MDA infrastructure routes
MDA also lists:
- Development Infrastructure Program grants for municipalities and counties applying on behalf of a new or expanded industry, with a stated maximum of $150,000
- Small Municipalities and Limited Population Counties support for publicly owned infrastructure
- Site Development grants for qualifying industrial sites and public or nonprofit economic-development entities
Use MDA's current form library for the actual cycle, workshop, and required forms. Older application PDFs are planning evidence, not proof that the same cycle is open.
Delta Regional Authority Grants
According to the 2026 DRA Community Infrastructure Fund page (opens in a new tab), the 2026 application window is now closed:
| 2026 CIF fact | Current value |
|---|---|
| Total funds available | $15 million |
| Minimum award | $250,000 |
| Maximum award | $1 million |
| Cycle opened | May 26, 2026 |
| Proposal deadline | August 24, 2026, passed |
CIF supports basic public infrastructure, transportation infrastructure, and flood-control projects in the DRA region. DRA encourages applicants to work with their Local Development District.
Bad fit: a general nonprofit program, private operating expense, or project outside an eligible DRA county without the required public or regional route.
For a deeper county and Local Development District screen, use the Delta Regional Authority grants guide.
Mississippi Housing Grants
Mississippi Home Corporation owns the main statewide affordable-housing routes.
According to the current MHC HOME Rental page (opens in a new tab), the FY2026 application is open and the sequence is:
- application workshop on August 19, 2026
- The 2026 HOME Rental application opened August 21, 2026 and is due online by October 30, 2026, according to Mississippi Home Corporation (opens in a new tab); funding announcements are expected January 13, 2027.
- online submission deadline on October 30, 2026
- funding announcement scheduled for January 13, 2027
MHC also administers HOME, Housing Trust Fund, ESG, HOPWA, LIHTC, and homebuyer-assistance work. Each has its own applicant and use rules. A household seeking assistance should use the consumer or counseling route. A developer or nonprofit housing sponsor should use the applicable NOFA and financing stack.
USDA Rural Development in Mississippi
Two ongoing programs cover many Mississippi community projects:
Water and Waste Disposal
According to USDA, Water and Waste Disposal (opens in a new tab) accepts applications on an ongoing basis and serves eligible rural areas and towns of 10,000 people or fewer. Eligible applicants include most state and local governments, private nonprofits, and federally recognized tribes. The USDA water grants guide compares this route with nearby infrastructure sources.
Funding can support drinking water, sewer, solid waste, and stormwater systems. The core product is long-term financing; grant support may be combined with a loan when needed to keep user costs reasonable.
Community Facilities
USDA reports that Community Facilities (opens in a new tab) accepts ongoing applications from public bodies, community nonprofits, and federally recognized tribes in rural places of 20,000 people or fewer.
Eligible facilities can include health, public safety, community, educational, food-system, and public-service projects. USDA says preparation can take weeks to months, so contact the Mississippi office before completing forms.
Mississippi Environmental and Water Funding
MDEQ's Water Pollution Control Revolving Loan Fund (opens in a new tab) publishes the current FY2026 Intended Use Plan and FY2027 request-for-ranking notice.
This is a capital-finance route, not a simple unrestricted grant. Before choosing MDEQ, MDA CDBG, USDA, DRA, or MCWI-related funding, compare:
- service area and applicant authority
- project type and public purpose
- planning and engineering status
- affordability and repayment capacity
- match or co-funding
- environmental review
- ranking-cycle timing
How to Apply for Mississippi Grants
Prerequisites before step one
Have these facts ready:
- legal applicant name and authority
- project address and service area
- ownership or site-control status
- problem statement backed by local data
- total project cost and funding gap
- engineering or architectural status for capital work
- match and debt capacity
- UEI and active SAM registration when required
- board, council, or sponsor approval path
If the source requires a UEI and active registration, use the SAM.gov registration guide before the application window gets tight.
Step 1: Classify the request
Separate a new grant from an allocation lookup, contract search, loan request, benefit application, or project-finance stack. This prevents the Marshall County ARPA mistake: an obligated historical award is not a new 2026 competition.
Step 2: Match the applicant
Use the official eligibility language. A business-benefit project may require a city or county applicant. A rural facility may require a public body, nonprofit, or tribe. A housing route may require a qualified owner, developer, or service provider.
Step 3: Match geography and use
Check Delta, Gulf Coast, rural-population, low- and moderate-income, distressed-area, and service-area rules. A program name can sound right while the location or use is wrong.
Step 4: Verify the live cycle
Use the current program page, NOFA, form library, or funding notice. Record:
- open and close dates
- award or finance type
- applicant type
- match
- required sponsor
- pre-application or workshop
- submission system
Step 5: Run the readiness screen
For a capital project, confirm site control, preliminary design, cost estimate, environmental path, operating plan, and local approvals. For a service grant, confirm staffing, target population, evidence, budget, partner roles, and reporting capacity. Federal pass-through recipients should also review allowable-cost rules before committing the budget.
Step 6: Choose apply, prepare, or stop
- Apply when the source is open and the applicant, geography, use, timing, and readiness all fit.
- Prepare when the route is recurring or ongoing but a sponsor, registration, design, match, or approval is missing.
- Stop when the funds are historical, the wrong entity must apply, the project is outside the service area, or the funding product is a loan when repayment is not workable.
Common Mississippi Grant Failure Modes
| Failure mode | Why it fails | Better action |
|---|---|---|
| Treating an ARPA allocation as an open grant | Allocation, obligation, expenditure, contract, and application are different records | Start with Treasury recipient and project IDs, then check the owning government |
| Business applies directly to an infrastructure route | MDA may require a municipality or county applicant | Secure the public sponsor before proposal work |
| PDD or LDD contacted near the deadline | Regional partners may need time for project development and routing | Contact the district when the project is defined, not after forms are due |
| Old PDF treated as a current cycle | Amounts and rules can persist while dates and forms change | Verify the current program page and notice |
| Capital request has no site or engineering evidence | The funder cannot assess feasibility, cost, or schedule | Build the project file before the narrative |
| Applicant assumes “grant” means no repayment | USDA and revolving-fund routes often blend loans and limited grant support | Test debt, affordability, and grant-share eligibility early |
| State and county project amounts are added together | Separate recipients can report related work in the same geography | Keep recipient IDs and reporting periods separate |
The most common mistake is treating every result that contains “Mississippi” and “grant” as one funding record. Mississippi County, Arkansas, FEMA assistance, local SLFRF awards, and State of Mississippi projects each have a different government, program, recipient ID, and reporting period.
Six Mississippi Route Examples
| Applicant situation | Better first route | Stop or change course when |
|---|---|---|
| Delta town with a flood-control or basic-infrastructure project | DRA CIF, then MDA or USDA co-funding check | County or project type is outside DRA rules |
| Small rural nonprofit replacing a community facility | USDA Community Facilities | The property, service area, or organization cannot meet public-purpose and finance rules |
| Rural water system with a construction gap | USDA Water and Waste Disposal, MDEQ, or MDA CDBG | No legal authority, engineering path, or sustainable rates |
| Manufacturer needing public site infrastructure | MDA CDBG Economic Development through a city or county | Request is private working capital or lacks job and public-infrastructure fit |
| Researcher checking Yazoo City ARPA or FEMA records | Treasury recipient RCP-052673 for SLFRF; FEMA declaration and OpenFEMA records for disaster assistance | Do not combine the two programs or treat a disaster designation as a paid award |
| Researcher checking Marshall County ARPA spending | Treasury recipient RCP-040408, then Board and Chancery Clerk records | Do not treat the reported balance as an open grant pool |
What Mississippi Grant Listings Don't Tell You
Official pages explain programs one at a time. They do not always show:
- whether the user wants a new award or an old spending record
- which government must sponsor a private-benefit project
- whether two related projects belong to separate federal recipients
- whether a grant share is realistic inside a loan-heavy capital package
- which missing readiness item should stop proposal work
Based on our analysis of the Marshall County Treasury rows, a searcher could see the county's $6.86 million allocation, a separate $1.98 million state MCWI obligation, and Hyline Drive in both descriptions, then incorrectly report one combined county award. Keeping the recipient IDs separate produces the correct answer and points the reader to the right local records.
For coastal projects, use the Gulf Coast grants guide to separate RESTORE, state, federal, and local routes. For new opportunities, search Mississippi grant routes. For award evidence, check the program's own notice and USAspending.gov.
Related Guides
- Mississippi small business grants
- Delta Regional Authority Grants Guide
- Gulf Coast Grants Guide
- Community Development Block Grant Guide
- USDA Water Grants Guide
- How to Register on SAM.gov
- Federal Grant Allowable Costs
Sources
- U.S. Treasury SLFRF public data (opens in a new tab)
- April 2026 Treasury reporting workbook (opens in a new tab)
- Treasury SLFRF self-service and deadline guidance (opens in a new tab)
- FEMA Mississippi emergency declaration EM-3640 map (opens in a new tab)
- OpenFEMA (opens in a new tab)
- FEMA Public Assistance obligations tool (opens in a new tab)
- Marshall County official site (opens in a new tab)
- Mississippi Development Authority incentives (opens in a new tab)
- MDA community forms library (opens in a new tab)
- Delta Regional Authority 2026 Community Infrastructure Fund (opens in a new tab)
- Mississippi Home Corporation HOME Rental (opens in a new tab)
- USDA Rural Development Mississippi (opens in a new tab)
- USDA Water and Waste Disposal (opens in a new tab)
- USDA Community Facilities (opens in a new tab)
- MDEQ Water Pollution Control Revolving Loan Fund (opens in a new tab)
Best follow-up
Choose the Mississippi route before planning
Mississippi searches can mix state, Delta, rural water, CDBG, restoration, and nonprofit paths. Choose the route before drafting.
Free. No payment on this step.
Next steps
Where to go next
These next pages help you move from research into a specific grant choice.
Check Delta route
Use for DRA, CIF, SEDAP, LDD routing, distressed-county checks, and infrastructure projects.
CDBG route
Use when a city or county can sponsor public facilities, economic development, housing, or urgent-need work.
Rural water route
Compare USDA water, MDA CDBG, SRF, and DRA paths for Mississippi water and wastewater projects.
Find grants that fit you
Free eligibility check: answer 9 questions and see ranked matches with deadlines and fit reasons.
Frequently Asked Questions
How do I find current grants in Mississippi?
Start with the applicant and project, not a general grant list. Cities and counties should check MDA CDBG and infrastructure programs. Delta communities should check DRA. Rural public bodies and nonprofits should check USDA Rural Development. Housing sponsors should check Mississippi Home Corporation. Direct federal applicants should search Grants.gov and then verify the issuing agency page.
How much ARPA money did Marshall County, Mississippi receive?
U.S. Treasury records list a one-time SLFRF allocation of $6,855,446 for Marshall County. The county's latest annual report in Treasury's April 2026 workbook showed two projects, $6,855,446 in cumulative obligations, and $6,498,031.69 in cumulative expenditures through March 31, 2026.
Are Marshall County ARPA funds open for new grant applications in 2026?
No open county grant pool is shown in the Treasury record. The county reported the full allocation as obligated. The federal obligation deadline was December 31, 2024, and the general expenditure deadline is December 31, 2026. A 2026 search should focus on contracts, implementation records, or successor programs.
Who keeps Marshall County grant and budget records?
Marshall County's official site lists the Board of Supervisors as the body that approves the annual budget and lists a Chancery Clerk. It does not list a separate county treasurer. For local records, start with the Board office and Chancery Clerk, then match county documents to the Treasury recipient ID RCP-040408.
Can a Mississippi small business apply directly for MDA CDBG funding?
Usually not. MDA's CDBG Economic Development route funds publicly owned infrastructure through a municipality or county on behalf of a qualifying business location, expansion, or retention project. A business without that public-infrastructure and job-creation fit should use a different finance, procurement, or technical-assistance route.
Can individuals apply for Mississippi grants?
Some housing, home repair, education, arts, and disaster programs serve individuals, but most competitive economic-development and infrastructure grants go to governments, nonprofits, schools, tribes, housing sponsors, or intermediaries. Verify the named applicant types before preparing an application.
How much ARPA funding did Yazoo City, Mississippi report?
Treasury's April 2026 workbook lists Yazoo City recipient RCP-052673 with a $2,672,091.18 allocation, eight projects, $2,672,091.18 obligated, and $2,229,623.31 spent through March 31, 2026. Those figures describe the city's SLFRF record, not a new application pool.
Last updated October 10, 2026. Corrected October 10, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
Alabama Grants Guide 2026: ADECA, AHFA, ARC
Alabama grants guide for 2026: ADECA deadlines, AHFA housing credits, ADEM SRF, ARC, TVA, City of Valley routes, and federal funding paths.
Alaska Grants Guide 2026: Find State Funding
Alaska got $8.3B+ in federal grants in FY2025, per USAspending. Find grants through DCCED, AHFC, DOTPF, the Denali Commission, and state agencies.
Appalachian Grants Guide 2026: ARC & Federal
ARC serves 423 counties in 13 states, and 76 are distressed in FY2027. See POWER, INSPIRE, ARISE, match rates, deadlines, and how to apply.
Arizona Education Grants 2026: School Funding
Arizona got $318M in Title I in FY2026 and $219M in Impact Aid in FY2025. Find ESA, IDEA, school facilities, tribal, and rural education grants.
Arizona Grants Guide 2026: Find State Funding
Arizona got $26.0 billion in FY2025 federal grants, $16.0B of it Medicaid. Find grants through ACA, ADOT, ADOH, WIFA, and 20+ state agencies.
Arizona Housing Grants 2026: ADOH & LIHTC
Arizona housing grants in 2026: ADOH HOME, LIHTC, NHTF, SHTF, IHBG, CoC, Phoenix, tribal routes, grant-fit checks, and deadlines.