Quick Answer: No ReConnect program round is open. When Grantsights checked on November 22, 2026, the newest ReConnect funding notice in the Federal Register was still the fiscal year 2024 notice (opens in a new tab) (Round 5), and its window closed May 21…
Full answer and how we checked it
No ReConnect program round is open. When Grantsights checked on November 22, 2026, the newest ReConnect funding notice in the Federal Register was still the fiscal year 2024 notice (opens in a new tab) (Round 5), and its window closed May 21, 2024 after a deadline extension (opens in a new tab). Grants.gov (opens in a new tab) shows that listing archived and no later ReConnect opportunity, so no deadline has been announced. Corporations, cooperatives, local governments, territories and tribes can apply, nonprofit or for-profit. Round 5 grants ran from $100,000 to $25 million, with a 25 percent cash match on 100 percent grants, waived for tribal, colonia, persistent poverty and socially vulnerable areas. Congress gave the program $50.75 million for FY2026 in Public Law 119-37 (opens in a new tab), half the FY2024 amount, so the next round is likely to be smaller.
This guide is for: general managers, engineers and finance staff at rural telephone companies and cooperatives, electric cooperatives, tribal governments and tribally owned providers, counties, public utility districts, broadband authorities and nonprofits that want to build rural broadband networks with the USDA ReConnect program. It also covers how ReConnect lines up against the National Telecommunications and Information Administration's (NTIA) Broadband Equity, Access, and Deployment (BEAD) program and USDA Community Connect.
Data note: Grantsights pulled the free USAspending.gov (opens in a new tab) API v2 (
spending_by_awardandspending_by_award_count) on November 22, 2026. Filters:program_numbers["10.752"] withaward_type_codes02, 03, 04 and 05 for grants and, separately, 07 and 08 for loans; andprogram_numbers["10.855"] for grants, kept only where USDA's award description reads "PILOT BROADBAND" or "BROADBAND RECONNECT," because USDA records ReConnect grants paid from yearly appropriations under the Distance Learning and Telemedicine listing (10.855) and grants paid from the Infrastructure Investment and Jobs Act (IIJA) under 10.752.time_perioduseddate_type: new_awards_onlyfor FY2025 (October 1, 2024 to September 30, 2025) and FY2026 (October 1, 2025 to September 30, 2026), paged at 100 rows; a second pull byaction_datereturned the same counts, and fetched rows matched the count endpoint. A pull for October 1 to November 22, 2026 returned no ReConnect grants or loans. Amounts are current obligations; records at $0 or below were left out of totals and medians.
In this guide
- ReConnect Program Status and Source Check, November 22, 2026
- How the ReConnect Program Works: Grants, Loans and the 90 Percent Test
- Recent ReConnect Awards From USAspending, FY2025 and FY2026
- How to Apply for a ReConnect Grant or Loan
- What USDA Doesn't Tell You About ReConnect
- ReConnect vs. BEAD vs. Community Connect
- When the ReConnect Program Fits (and When It Doesn't)
- FAQ: Common Questions
- Sources
- Related Guides
ReConnect Program Status and Source Check, November 22, 2026
Grantsights checked 11 official sources on November 22, 2026, and none opens a ReConnect window. USDA's own ReConnect web pages didn't load for this check, so confirm the status there too before you plan around these findings.
| Source | What it says | Your takeaway | Checked |
|---|---|---|---|
| FY2024 ReConnect notice (Round 5) (opens in a new tab) | Published February 21, 2024; $100,000 minimum; $25 million grant cap; $50 million loan cap; 25 percent cash match on 100 percent grants | The rules the last round used | November 22, 2026 |
| Deadline extension notice (opens in a new tab) | Window March 22 to May 21, 2024 | The last ReConnect deadline | November 22, 2026 |
| Grants.gov listing RUS-REC-2024-1 (opens in a new tab) | Archived; Assistance Listing 10.752; ceiling $25,000,000; floor $100,000 | No newer ReConnect listing found | November 22, 2026 |
| Public Law 119-37, FY2026 appropriations (opens in a new tab) | $50,750,000 for the pilot program; $20,000,000 of prior-year balances rescinded (section 769) | Money exists for a smaller round | November 22, 2026 |
| Public Law 118-42, FY2024 appropriations (opens in a new tab) | $100,385,000 for the pilot program | The comparison year | November 22, 2026 |
| Public Law 117-58 (Infrastructure Investment and Jobs Act) (opens in a new tab) | $1,926,000,000 for the pilot program, available until spent | Source of the 10.752 grants | November 22, 2026 |
| 7 CFR part 1740 (2025 edition) (opens in a new tab) | Eligible entities, the 90 percent service area test, the rural area definition, reporting | The rule every round follows | eCFR text current as of November 19, 2026 |
| FY2026 Community Connect notice (opens in a new tab) | Window opened May 13, 2026; future Community Connect notices will appear only on USDA's site and the federal grants portal | Community Connect notices are leaving the Federal Register | November 22, 2026 |
| Grants.gov Community Connect FY2026 (opens in a new tab) | $17 million; $100,000 to $5 million; closed June 29, 2026 | Closed | November 22, 2026 |
| NTIA BEAD progress dashboard (opens in a new tab) | Dated November 3, 2026; all 56 Final Proposals approved; all 56 award agreements signed | BEAD money is now with the states | November 22, 2026 |
| NTIA BEAD Restructuring Policy Notice (opens in a new tab) | Published June 6, 2025; replaces parts of the BEAD notice; technology neutral selection | BEAD rules changed mid-program | November 22, 2026 |
According to Grants.gov, the only two Rural Utilities Service opportunities posted on November 22, 2026 were the FY2027 Technical Assistance and Training grant and the FY2027 Solid Waste Management grant, neither of them ReConnect. Grantsights checked the Round 5 notice against 7 CFR part 1740 and the FY2026 appropriations act. One detail matters for the next round: the 2024 notice defined "sufficient access to broadband" as 25 megabits per second (Mbps) down and 3 Mbps up, and the FY2026 law keeps the 25/3 test for its money, so areas that already have 25/3 service won't qualify for it.
Get grant deadline alerts by email
About once a week, we email a short list of open grant calls with real deadlines from different funders. It isn't limited to the programs in this guide.
No spam. Unsubscribe anytime.
How the ReConnect Program Works: Grants, Loans and the 90 Percent Test
According to USDA's Round 5 notice in the Federal Register, the ReConnect program, formally the Rural eConnectivity Program, offered four funding categories worth up to $700 million. The Rural Utilities Service (RUS), part of USDA Rural Development, runs it under section 779 of the Consolidated Appropriations Act, 2018, and the rule at 7 CFR part 1740.
| Round 5 category | Money available | Per-application limit | Terms |
|---|---|---|---|
| 100 percent loan | $200 million | $50 million | Fixed 2 percent; 3-year deferral; not scored, first come, first served |
| 50 percent loan, 50 percent grant | $100 million loans, $100 million grants | $25 million each, always equal | Treasury rate on the loan; 3-year deferral |
| 100 percent grant | $150 million | $25 million | 25 percent cash match of total project cost |
| 100 percent grant, special areas | $150 million | $25 million | No match for Alaska Native Corporations, tribal governments, colonias, persistent poverty areas, socially vulnerable communities |
The minimum request in every category was $100,000, and each applicant could submit only one application. Projects must be fully built within five years of the date funds are released.
Who can apply. According to 7 CFR part 1740 (opens in a new tab), section 1740.9, an applicant may be nonprofit or for-profit and must be a corporation, a limited liability company or partnership, a cooperative or mutual organization, a state or local government or one of its agencies, a territory, or an Indian tribe. Co-applicants aren't eligible, so a county partnering with a provider has to pick one lead.
Where you can build. Three tests apply together:
- Rural area. The rule excludes any city, town or incorporated area of more than 20,000 people and any urbanized area next to a city or town of more than 50,000.
- The 90 percent test. At least 90 percent of households in each proposed funded service area (PFSA) must lack sufficient access to broadband, which Round 5 set at 25/3 Mbps wired or licensed fixed wireless. Satellite and unlicensed wireless don't count as service.
- No prior commitment. Areas with an enforceable commitment from another federal or state program to deliver 100/20 Mbps were ineligible in Round 5, and service areas of existing RUS broadband borrowers are off limits to other applicants.
What you must build. Round 5 required a network that can deliver 100 Mbps symmetrical service to every premises in the service area at the same time. That's a higher bar than the FY2026 law's 100/20 build target "to the extent possible," which is one reason to read the next notice before you design anything.
Recent ReConnect Awards From USAspending, FY2025 and FY2026
According to USAspending award records, USDA signed 65 ReConnect grants worth $535.7 million in FY2025 and 34 worth $538.3 million in FY2026, with medians of $5,166,742 and $13,630,510. No round has opened since May 2024, so these awards came from applications already filed, plus congressionally directed projects. For the rest of USDA Rural Development's grants in the same years, see USDA Rural Development recent awards.
| Fiscal year | ReConnect grants | Total | Median grant | Under 10.752 (IIJA money) | Congressionally directed | ReConnect loans (face value) |
|---|---|---|---|---|---|---|
| FY2025 | 65 | $535.7 million | $5.17 million | 0 | 15, $20.2 million | 16, $122.0 million |
| FY2026 | 34 | $538.3 million | $13.63 million | 19, $338.6 million | 4, $6.7 million | 10, $128.0 million |
Grantsights analysis of the 99 grant records shows two signing waves in FY2026: 8 grants dated January 7 to 16, 2026, and 23 dated May 6, 2026, including all 19 paid from IIJA money. Five FY2026 grants top $25 million, Round 5's cap; the Round 4 notice (opens in a new tab) allowed up to $35 million in the most remote areas, and Round 5 let USDA fund leftover Round 4 applications, so the May 2026 batch likely mixes rounds. Grant sizes spread widely: 12 were under $1 million, 25 between $1 million and $5 million, 31 between $5 million and $15 million, 26 between $15 million and $25 million, and 5 above $25 million.
Named recipients from the USAspending pull:
| Recipient | State | Type | Signed | ReConnect grant |
|---|---|---|---|---|
| Unicom, Inc. | AK | Company, 100 percent grant | May 2026 | $35,000,000 |
| Dena Nena Henash | AK | Tribal organization, 100 percent grant | May 2026 | $35,000,000 |
| Alaska Telephone Company | AK | Company | May 2026 | $33,017,636 |
| Okanogan County Public Utility District No. 1 | WA | Local government | May 2026 | $30,195,500 |
| Project Telephone Company | MT | Company | September 2025 | $24,998,534 |
| Oklahoma Western Telephone Company | OK | Company | May 2026 | $24,980,258 |
| Choctaw Nation of Oklahoma | OK | Tribe | May 2026 | $22,297,100 |
| Standing Rock Telecommunications | ND | Company | October 2024 | $22,230,053 |
| Central New Mexico Electric Cooperative | NM | Electric cooperative | December 2024 | $22,068,400 |
| Continental Divide Electric Cooperative | NM | Electric cooperative | May 2026 | $21,722,200 |
| Confederated Tribes of the Colville Reservation | WA | Tribe | November 2024 | $19,179,918 |
| Cleveland County Telephone Co. | MO | Company, 50/50 combination | November 2024 | $17,850,732 plus an equal loan |
| Nicholas County Commission | WV | Local government, 50/50 combination | December 2024 | $12,435,000 plus an equal loan |
| Foothills Rural Telephone Cooperative | KY | Telephone cooperative | August 2025 | $11,409,200 |
| Canby Telephone Association | OR | Company, 100 percent grant | May 2026 | $735,294 |
For example, Unicom received $35,000,000 in May 2026 (award record (opens in a new tab)), and a public utility district in Washington, Okanogan County PUD No. 1, received $30,195,500 the same day (award record (opens in a new tab)). At the small end, congressionally directed grants went to the County of Goodhue in Minnesota ($3,210,000) and the City of Fort Bragg in California ($750,000) in FY2026.
Top states, FY2025 and FY2026 combined:
| State | ReConnect grants | Dollars |
|---|---|---|
| Alaska | 11 | $293.1 million |
| New Mexico | 8 | $115.6 million |
| Oklahoma | 5 | $98.5 million |
| Oregon | 8 | $66.7 million |
| Utah | 7 | $54.0 million |
| Washington | 2 | $49.4 million |
| Missouri | 5 | $48.8 million |
Recipient types: by name, companies took 56 of the 99 grants and $647.0 million, cooperatives 18 and $226.4 million, tribes and tribal organizations 6 and $136.0 million, and local governments (counties, cities, towns, a public utility district and broadband authorities) 17 and $62.8 million, mostly through congressionally directed grants. One university (Northern Michigan University, $1.2 million) and one community development corporation in Pennsylvania ($500,000) round it out. These counts are a floor for cooperatives and tribes, because a tribally owned company or a telephone association organized as a co-op is counted here as a company unless its name says otherwise.
Loans: 26 new ReConnect loans with a face value of $250.0 million were signed in FY2025 and FY2026 under 10.752, with medians of $5.32 million and $11.80 million. Most were the loan half of a 50/50 combination. The largest was a $30,554,419 100 percent loan to Beaver Creek Cooperative Telephone Company in Oregon in May 2026.
How to Apply for a ReConnect Grant or Loan
Round 5 scored grant and combination applications on 150 points, while 100 percent loans weren't scored. Until USDA publishes a Round 6 notice, these are the most recent criteria, and any of them can change.
| Round 5 scoring criterion | Points |
|---|---|
| Rurality: 6 or fewer people per square mile, or 100 miles from a city of 50,000, for full points | 25 |
| Economic need: county poverty rate of 20 percent or more for full points | 20 |
| Affordability: at least one low-cost plan fast enough for telework and remote learning | 20 |
| Labor standards | 20 |
| Tribal areas | 15 |
| Applicant is a local government, nonprofit or cooperative | 15 |
| Socially vulnerable communities | 15 |
| Net neutrality commitment by board resolution | 10 |
| Located in a state with the most unserved locations per square mile | 10 |
| Total | 150 |
Here's the order Grantsights recommends while no window is open:
- Register with SAM now. Round 5 required an active registration in the System for Award Management (SAM) and a Unique Entity Identifier (UEI) before you submit. Start at SAM.gov entity registration (opens in a new tab); the steps are in how to register on SAM.gov.
- Map the service area against the 90 percent test. Round 5 required applicants to use the Federal Communications Commission (FCC) Broadband Funding Map and list every existing provider and its speeds. Check BEAD subgrant maps from your state too, because a BEAD award there can block a ReConnect award.
- Get audited financials ready. Part 1740 requires unqualified audited financial statements, a five-year pro forma forecast, a network design, environmental review and, on tribal land, a tribal resolution of consent from non-tribal applicants.
- Line up the match in cash. Third-party match needs a commitment letter; a loan used as match can't be secured by grant-funded assets.
- Watch for the notice. ReConnect applications go through the RUS Application Intake System on USDA's ReConnect site, not the Grants.gov (opens in a new tab) workspace, though a synopsis is posted there. Under section 1740.3, each round's funding amounts and award limits are published in the Federal Register.
Applicants who think a non-rural part of their area is "rural in character" must ask USDA for that determination under 7 U.S.C. 1991(a)(13)(D), and the Round 5 notice warned that it takes time.
What USDA Doesn't Tell You About ReConnect
The ReConnect program has gone 30 months without an application window, and its yearly money fell from $100,385,000 in FY2024 to $50,750,000 in FY2026, with another $20,000,000 of unused balances rescinded. Grantsights' view: don't budget a build on ReConnect alone until a Round 6 notice is out.
The match is cash, up front and proportional. Round 5 required the 25 percent match to sit in the applicant's operating accounts, and the grant agreement uses a Pledged Deposit Account. Each draw needs proof of a matching share spent: a request for 10 percent of grant funds needs evidence that 10 percent of the match has been spent. In combinations, the loan is advanced before the grant. A common mistake is treating the grant as working capital: under section 1740.12, award and matching funds pay only eligible project costs incurred after the award.
Reporting outlasts construction. Under section 1740.80, awardees file balance sheets, income statements, cash flows, rate summaries and subscriber counts by community within 30 days after every calendar quarter, for the full loan term or the economic life of grant-funded facilities. Add annual audits, annual service-area maps until the build is done, and annual reports for three years after construction. Small providers routinely underestimate that load, which runs for years after the last customer is connected.
Unbuilt areas get clawed back. If parts of the service area aren't built in five years, RUS may rescind or require repayment of part of the award. Grant-funded assets carry a lien, or you post an irrevocable letter of credit for the full grant amount.
Competitors can challenge your area. Existing providers file public notice responses, and RUS may field-test their claimed speeds. Round 5 also had RUS notify NTIA and the state 30 days before any award, and an unresolved state objection over a pending BEAD subgrantee could sink the application. That's a red flag for any area your state may still fund through BEAD's September 2026 round for newly identified locations.
Pre-application costs are a gamble. Round 5 reimbursed up to 5 percent of the award for pre-application costs, with environmental review capped at 3 percent, only if incurred after the notice was published. A vendor that designed the project can't also build it with grant money.
Success rates aren't published where you can check them. Neither the Round 5 notice nor its Grants.gov listing gives an applicant count, so a success rate can't be computed from those sources. What the award data does show is repeat winners: Grantsights analysis of FY2024 to FY2026 records finds 7 of the 96 FY2025 and FY2026 grant recipients, including Unicom, Copper Valley Telephone Cooperative, Cordova Telecom Cooperative and Oregon Telephone Corporation, also signed ReConnect grants or loans in another of those years.
The scoring may change. Labor standards (20 points) and net neutrality (10 points) were Round 5 policy choices. NTIA's June 2025 BEAD notice eliminated BEAD's non-statutory labor requirements, so don't assume the next ReConnect notice keeps every Round 5 point.
ReConnect vs. BEAD vs. Community Connect
Three federal programs pay for rural broadband construction in 2026, and they reach applicants by different doors. BEAD is the largest at $42.45 billion, according to NTIA's BEAD program page (opens in a new tab).
| ReConnect | BEAD | Community Connect | |
|---|---|---|---|
| Who runs it | USDA Rural Utilities Service, directly | NTIA funds it; each state or territory broadband office picks subgrantees | USDA Rural Utilities Service, directly |
| Recent money | $50.75 million for FY2026, plus remaining IIJA funds | $42.45 billion total | $17 million for FY2026 |
| Status, November 22, 2026 | No window since May 21, 2024 | All 56 award agreements signed; NTIA announced a new round for newly identified locations on September 3, 2026 | FY2026 window closed June 29, 2026 |
| Award form | Grants, loans, 50/50 combinations | Subgrants | Grants of $100,000 to $5 million |
| Match | 25 percent cash on Round 5's 100 percent grants, waived in some areas | Check your state broadband office's subgrant rules | 15 percent of the grant, under 7 CFR 1739.14 (opens in a new tab) |
| Area test | 90 percent of households lack 25/3 Mbps | Locations on the state's eligible list | Communities where 10/1 Mbps service doesn't exist |
The 2025 change at BEAD matters for ReConnect applicants. NTIA's June 6, 2025 Restructuring Policy Notice replaced the original rule that limited priority projects to end-to-end fiber with a technology neutral approach, and it eliminated non-statutory labor and climate requirements. NTIA's September 3, 2026 announcement (opens in a new tab) reports $21 billion in savings and lets states direct part of theirs to newly identified unserved locations, including ones affected by defaults or changes in earlier federal and state programs. A provider deciding between the two should check its state's plan first, and avoid drafting a ReConnect application for locations the state still plans to fund. The broadband grants guide covers BEAD, E-Rate and the other federal routes in more depth.
When the ReConnect Program Fits (and When It Doesn't)
ReConnect fits a provider or public body that can carry a 5-year construction project, file quarterly financials within 30 days of each quarter's end for years, and either put up a 25 percent cash match or borrow. In the FY2025 and FY2026 data, Alaska alone took 11 of the 99 grants and $293.1 million, and very remote areas with high poverty scored best.
| Your situation | Signal |
|---|---|
| Rural telephone or electric cooperative with audited financials | Strong fit; cooperatives also earned 15 points in Round 5 |
| Tribe or tribally owned provider building on tribal land | Strong fit; no match in the special-area category and up to 15 points |
| County or public utility district with no network operator | Possible as the lead applicant, but you need an operator and engineering; also ask your congressional office about directed funding |
| Small nonprofit hoping to run a community network | Weak fit unless it partners with a builder; Community Connect's smaller grants may suit it better |
| Provider whose area has a BEAD subgrant | Not eligible for that area; look elsewhere in your territory |
| Nonprofit teaching people to use the internet | Not ReConnect; see grants for digital literacy programs |
| Rural nonprofit that needs a building, not a network | See USDA Community Facilities grants |
For the wider set of options, grants for rural internet compares federal and state routes, and USDA Rural Development grants for 2026 lists the agency's other programs. ReConnect's match and the years before a network pays back often need private money too. For that, the community funder list draws on foundations' own 990-PF grant records, with a free preview of community funders in your state. The federal grant search lists open federal opportunities by agency.
FAQ: Common Questions
Is a ReConnect round open now? No. As of November 22, 2026, the last window closed May 21, 2024 and no Round 6 notice has been published.
Who can apply? Corporations, limited liability companies, cooperatives, state and local governments, territories and tribes, nonprofit or for-profit. Not individuals.
How big are the grants? Round 5 allowed $100,000 to $25 million; the FY2025 and FY2026 median was $6.4 million.
Is there a match? 25 percent cash on Round 5's 100 percent grants, waived in tribal, colonia, persistent poverty and socially vulnerable areas.
How is it different from BEAD? ReConnect is a direct USDA program; BEAD money goes through state broadband offices.
How much is there for 2026? $50.75 million in FY2026 appropriations, with $20 million of older balances rescinded.
Sources
- Federal Register via govinfo, Notice of Funding Opportunity for the Rural eConnectivity Program for Fiscal Year 2024 (opens in a new tab) and extension of submission deadline (opens in a new tab)
- Federal Register via govinfo, ReConnect fiscal year 2022 notice (Round 4) (opens in a new tab)
- Grants.gov, RUS-REC-2024-1, The Rural eConnectivity Program (opens in a new tab), checked November 22, 2026
- govinfo, 7 CFR part 1740, Rural eConnectivity Program (2025 edition) (opens in a new tab) and 7 CFR part 1739, Community Connect (opens in a new tab)
- govinfo, Public Law 119-37 (opens in a new tab), Public Law 118-42 (opens in a new tab) and Public Law 117-58 (opens in a new tab)
- Federal Register via govinfo, FY2026 Community Connect notice (opens in a new tab), and Grants.gov, RDRUS-CC-2026 (opens in a new tab)
- NTIA, BEAD program page (opens in a new tab), BEAD progress dashboard (opens in a new tab), BEAD Restructuring Policy Notice (opens in a new tab) and September 3, 2026 announcement (opens in a new tab)
- USAspending.gov, Unicom award record (opens in a new tab), Okanogan County PUD No. 1 award record (opens in a new tab), and the award search API pulled November 22, 2026
- SAM.gov, entity registration (opens in a new tab)
Related Guides
Rural providers rarely fund a build from one source. Federal grants for rural organizations covers the other agencies that pay for rural projects, and the broadband grants guide explains E-Rate and state broadband offices.
If USDA is your main funder, track the agency's other awards in USDA Rural Development recent awards, and read how to apply for federal grants on Grants.gov before your first federal application.
Town councils that want broadband as one piece of a wider plan can read grants for small towns, which sets ReConnect beside the water, building and downtown programs a small town applies to.
Frequently Asked Questions
Is the USDA ReConnect program accepting applications in November 2026?
No. When Grantsights checked on November 22, 2026, no ReConnect funding notice had been published since the fiscal year 2024 notice (RUS-REC-2024-1), whose application window ran from March 22 to May 21, 2024. Neither the Federal Register nor Grants.gov showed a Round 6 notice, and no deadline has been announced. Congress did fund the program for FY2026, so a later round is possible.
Who can apply for a ReConnect grant?
Under 7 CFR 1740.9, nonprofit and for-profit corporations, limited liability companies and partnerships, cooperatives and mutual organizations, states and local governments and their agencies, U.S. territories and Indian tribes. Individuals and general partnerships formed by individuals can't apply, and co-applicants aren't allowed: one entity leads and others sign agreements with it.
How much can a ReConnect grant be?
In the last round, requests ran from $100,000 to $25 million for a 100 percent grant, up to $50 million for a 100 percent loan, and up to $25 million each in loan and grant for a 50/50 combination. The median of the 99 ReConnect grants signed in FY2025 and FY2026 was $6,410,158, according to USAspending records.
Does ReConnect require a match?
In Round 5, a 100 percent grant required cash equal to at least 25 percent of the overall project cost. No match applied in the separate 100 percent grant category for Alaska Native Corporations, tribal governments, colonias, persistent poverty areas and socially vulnerable communities. The match is set by each round's notice, so the next round could change it.
What's the difference between ReConnect and BEAD?
ReConnect is run directly by USDA's Rural Utilities Service, and providers apply to USDA for grants, loans or both. BEAD is NTIA's $42.45 billion program, and providers apply to their state or territory broadband office for subgrants. As of NTIA's November 3, 2026 dashboard, all 56 states and territories had approved Final Proposals and signed award agreements.
How much money does ReConnect have for 2026?
Public Law 119-37 appropriated $50,750,000 for the ReConnect pilot program for FY2026, including $750,000 for congressionally directed projects, and rescinded $20,000,000 of unused money from earlier years. That's about half of the $100,385,000 Congress provided for FY2024. The Infrastructure Investment and Jobs Act added $1.926 billion in 2021.
Last updated November 22, 2026. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
Beginning Farmer Grants & Loans (2026 Guide)
6 federal programs reserve funding for beginning farmers with under 10 years experience. See FSA microloans, EQIP set-asides, and BFRDP training grants.
USDA Community Facilities Grants (2026 Guide)
USDA Community Facilities grants cover 15% to 75% of costs for rural towns of 20,000 or fewer. See the real grant tiers, scoring points, and how to apply.
USDA Energy Grants 2026: All Programs Guide
USDA REAP grants cover up to 50% of costs but are paused. Compare REAP loans, 9003 guarantees up to $250M, RESP 0% loans and EQIP for 2026.
USDA Food Assistance Grants 2026: Full Guide
7 USDA food programs compared: TEFAP, CSFP, FDPIR, Farm to School, GusNIP, Community Food Projects, and SNAP-Ed, whose funding ended in 2025.
USDA Grants: Rural Development, REAP & NIFA Guide (2026)
USDA Rural Development grants: VAPG ($200K cap), REAP and ReConnect (both paused), Community Facilities, and NIFA. How to apply through RD Apply.
USDA Grants Guide 2026: Eligibility & How to Apply
Compare 3 USDA grants application routes, program-specific documents, eligibility rules, and the current checklists that control each submission.