USDA Water Grants for Rural Communities (2026)
Updated 9 official sources
Quick Answer: USDA water grants have 4 grant programs and finance routes: Water & Waste Disposal grants, direct loans, guaranteed loans, and special-purpose grants for planning or emergencies.
Full answer and how we checked it
They fund drinking water, wastewater, stormwater, and solid waste systems in rural communities with populations of 10,000 or fewer. This guide is for local officials, water district managers, tribal administrators, engineers, and nonprofits serving small rural communities. Grant percentages depend on community income levels, with the poorest communities eligible for up to 75% grant funding.
Data note: Program status, grant caps, eligibility, and application routes were checked on June 2, 2026 against USDA Rural Development, USDA budget materials, EPA SRF pages, and federal water-program sources. State office guidance and quarterly loan rates can change, so applicants should confirm current terms before board action.
In this guide
- USDA Water Funding Is an Infrastructure Finance Package
- June 2026 Source Check: USDA Water Grant Routing
- May 2026 Grantsights Decision Memo: Which USDA Water Route Fits First
- USDA Water Grants: The Four Funding Types
- Best Fit and Bad Fit Checklist for USDA Water Grants
- Who Qualifies for USDA Water Grants
- How USDA Determines Your Grant Amount
- Application Process: What to Expect
- What USDA's Website Doesn't Tell You About Water Grants
- Predevelopment Planning Grants: The Smart First Step
- Emergency Community Water Assistance Grants
- How This Program Connects to Other USDA Funding
- Related Guides
- Sources
Find the foundations most likely to fund your organization
Type your organization's name. We'll show the foundations that fund groups like yours, from their own IRS filings, with the reasons for each. Free, no sign-up. See a sample
Foundations that fund this work
16,861 private foundations gave to land trusts, conservancies, nature centers and environmental groups
From their own IRS Form 990-PF filings (tax years 2020 to 2025). Pick your state to see who takes requests there, with three in full. About the list
Across the US, these foundations gave 91,301 grants totaling $6,638,704,295.
One payment
Environment and conservation funder list
$29once
All 16,861 foundations, state by state.
- Each grant's amount, recipient, year and purpose
- Whether its filing says it takes requests
- How to apply, and a CSV download
Need every cause, with weekly filing alerts? Grantsights Pro is $199 a year, and a list you buy now counts toward it.
Foundation data from the foundations' own public tax returns (IRS Form 990-PF), not government grants. We never promise funding.
Other ways to buy
- Paid by card through Stripe, with an emailed receipt (refund details in our terms).
- For comparison, full foundation databases are subscriptions: Candid Premium is $1,199 a year (nonprofit price, billed annually) and Instrumentl starts at $299 a month (billed annually). This list is $29, once.
- Questions before you buy? Email Erik Jia, who runs Grantsights, at team@grantsights.com.
Grant finder
Open grants and foundations that take requests for environmental work.
See the best fits for your organization, free for 14 days.
Start freeNo card. Nothing is charged when it ends.
If your rural community needs to build, repair, or upgrade its water or sewer system, USDA water grants through the Water & Waste Disposal program are likely your best federal funding option. This guide is for local government officials, water district managers, tribal administrators, and nonprofit organizations serving communities of 10,000 or fewer who need to understand the program's eligibility rules, funding levels, and application process.
According to USDA, Emergency Community Water Assistance Grants are open on an ongoing basis from October 1 to September 30 and serve rural areas and towns with populations of 10,000 or fewer. According to USDA, emergency water transmission line grants can reach $150,000 and water source grants can reach $1,000,000. According to USDA budget materials, Water and Waste Disposal development grants may not exceed 75% of eligible development cost.
Water & Environmental is one of the most impactful USDA programs. A single project can bring clean drinking water to a community that's been on a boil-water notice for years, or replace a failing sewer system that's contaminating local waterways. But the application process is more involved than most federal grants, requiring engineering reports, environmental reviews, and financial analyses that can take months to prepare.
USDA Water Funding Is an Infrastructure Finance Package
Official USDA pages correctly list the programs, but they split the applicant decision across Water and Waste Disposal, ECWAG, SEARCH, state offices, and EPA State Revolving Funds. Grantsights' 2026 source read is that a rural water project should not start with "which grant has the most money?" It should start with four gates: population, emergency status, planning readiness, and user-rate affordability.
According to USDA Rural Development, Water and Waste Disposal applications are accepted from October 1 to September 30 and serve rural areas, tribal lands, and colonias with populations of 10,000 or fewer. According to USDA, Emergency Community Water Assistance Grants are also open year-round, require a major decline in water quantity or quality within 2 years or an imminent decline, and can fund distribution-system work up to $150,000 or water-source projects up to $1,000,000. According to USDA, SEARCH is only for rural areas of 2,500 or fewer with median household income below poverty or below 80% of statewide nonmetro median. USDA loan rates are quarterly, so the state office should confirm the current poverty, intermediate, and market rates before the community adopts a debt model.
| Official source fact | Grantsights applicant decision |
|---|---|
| Water and Waste Disposal can combine loan and grant money | Model the user-rate impact before asking for a grant percentage |
| ECWAG does not require a federal disaster declaration | Use it for acute water quantity or quality problems, not deferred maintenance |
| SEARCH is predevelopment only | Use it before engineering, not after construction design is finished |
| EPA DWSRF and CWSRF run through states | Blend SRF, USDA, CDBG, and state funds when USDA alone cannot carry the project |
| USDA asks applicants to contact state RD staff first | The state office can prevent the wrong engineering format or income source from delaying the file |
For example, one town with 1,900 residents, low median income, and no preliminary engineering report should usually start with SEARCH or predevelopment planning, then move into a Water and Waste Disposal package. One water district with a sudden chemical spill and a documented public-health threat should call USDA about ECWAG first. The takeaway: the strongest USDA water strategy is a sequencing decision, not a list of programs.
If the project is broader than water or sewer, pair this guide with USDA rural development grants before deciding whether the first route is Water and Waste Disposal, Community Facilities, ReConnect, or state infrastructure funding.
3 open federal calls list government agencies and mention environment
Checked nationwide: federal calls, not state programs.
- WaterSMART Enhancing Water Resources Projects
Bureau of Reclamation · Due Sep 8, 2027 · Up to $3.0M
- F26AS00030 Cooperative Endangered Species Conservation Fund: Recovery Land Acquisition Grant Program
Fish and Wildlife Service · Due Nov 20, 2026 · From $10K
- F26AS00088 Endangered Species Conservation - Wolf Livestock Loss Compensation and Prevention
Fish and Wildlife Service · Due Jan 15, 2027 · Up to $675K
See the programs your organization qualifies for: 9 questions, about two minutes, free.
See public agency programsJune 2026 Source Check: USDA Water Grant Routing
This June check focuses on the points that can break an application before the narrative is written.
| Source checked June 2, 2026 | Current applicant takeaway |
|---|---|
| USDA Water and Waste Disposal Loan and Grant Program | Main construction finance remains open year-round for eligible rural service areas of 10,000 or fewer, with loan and grant mix based on user-rate need. |
| USDA Emergency Community Water Assistance Grants | ECWAG is for urgent water quantity or quality problems, with $150,000 and $1,000,000 caps depending on whether the work is distribution repair or water-source work. |
| USDA SEARCH | SEARCH is predevelopment help for very small, financially distressed communities, not a construction award. |
| USDA Predevelopment Planning Grants | PPG can fund early feasibility, engineering, and environmental work before the full Water and Waste Disposal package. |
| EPA DWSRF and CWSRF | State revolving funds often pair with USDA when a project needs principal forgiveness, state subsidy, or a larger blended capital stack. |
For route comparison, use USDA water grants for the wider USDA water family, water infrastructure grants for EPA and state options, USDA Community Facilities when the asset is not water or sewer, and Grantsights grant search for current water infrastructure opportunities.
Get grant deadline alerts by email
About once a week, we email a short list of open grant calls with real deadlines from different funders. It isn't limited to the programs in this guide.
No spam. Unsubscribe anytime.
May 2026 Grantsights Decision Memo: Which USDA Water Route Fits First
The USDA water decision starts before the application form. The community has to sort the project into construction finance, emergency response, planning, or technical assistance before it asks for a grant percentage.
According to USDA Rural Development's Water and Waste Disposal program page, the main program funds drinking water, sanitary sewage, solid waste, and storm water systems for eligible rural areas. According to USDA, Emergency Community Water Assistance Grants address a major decline in water quantity or quality or an imminent decline, and those requests can move differently than normal construction finance. According to USDA budget materials, Water and Waste Disposal development grants are capped by eligible cost and community need, so the grant share is a rate-affordability result, not a number the applicant picks.
| Community situation | Best first route | Bad-fit warning |
|---|---|---|
| Town or district needs full construction finance | Water and Waste Disposal loan and grant package | No preliminary engineering report, no rate model, or no local debt authority |
| Acute water quantity or quality problem | Emergency Community Water Assistance Grant | Problem is deferred maintenance rather than an immediate public-health issue |
| Community cannot pay for planning work | SEARCH, predevelopment planning, or technical assistance | Engineering and environmental work are already complete |
| System serves more than 10,000 people | State revolving fund, EPA, CDBG, EDA, or blended state route | USDA service-area population test is not met |
| Low-income rural area with high user-rate pressure | USDA plus SRF, CDBG, and state match planning | Applicant assumes USDA will pay 100% of the project |
Grantsights' apply/skip rule: apply when the service area, engineering package, user-rate model, and legal borrowing authority line up. Skip or sequence planning first when the community has need but not enough technical evidence for a construction package.
USDA Water Grants: The Four Funding Types
The Water & Waste Disposal program has four distinct components. Most communities use a combination of these.
1. Direct Loans
USDA lends money directly to the community at below-market interest rates. Loan terms can extend up to 40 years. USDA sets three interest rate tiers based on community income:
| Community Income Level | Interest Rate Tier |
|---|---|
| Below poverty line or 80% of state nonmetro MHI | Poverty rate (lowest) |
| Between poverty line and state nonmetro MHI | Intermediate rate |
| At or above state nonmetro MHI | Market rate |
Even USDA's "market rate" is typically below what a small rural community would get from a commercial bank, because USDA's cost of borrowing is the U.S. Treasury rate.
2. Direct Grants
Grants are available to communities that can demonstrate they can't afford to repay the full project cost through user fees at reasonable rates. USDA determines reasonableness by comparing what the community's water/sewer rates would need to be with loans alone versus what similar communities in the state pay.
Grant eligibility depends on community income. The lower the income, the higher the potential grant percentage, up to 75% of eligible project costs for the lowest-income communities. USDA calculates the specific grant amount for each project individually.
3. Guaranteed Loans
USDA guarantees loans made by private lenders, reducing the lender's risk and allowing communities to access financing they might not otherwise get. Ask the lender or your state RD office for the current maximum guarantee percentage.
4. Grants for Special Purposes
Three separate grant programs address specific needs:
- Predevelopment Planning Grants: Up to $60,000 (or 75% of costs, with at least a 25% cash match) for feasibility studies, preliminary engineering reports, and environmental assessments
- Emergency Community Water Assistance Grants: Up to $150,000 for emergency repairs, replacement, or extensions of distribution systems, or up to $1,000,000 for water-source projects tied to a significant decline or imminent decline in water quantity or quality
- Technical Assistance and Training Grants: Funded through intermediary organizations that provide free engineering and management help to small rural water systems
Best Fit and Bad Fit Checklist for USDA Water Grants
USDA water grants work best when the applicant can prove rural eligibility, system need, financial capacity, and engineering readiness. Our analysis of USDA water grant pages shows that the biggest mistake is treating this like a short grant narrative when it is really an infrastructure finance package.
| Project need | Best fit | Bad fit signal |
|---|---|---|
| Full water or wastewater construction | Water & Waste Disposal loan and grant package | No preliminary engineering report or rate analysis |
| Early feasibility and application development | Predevelopment planning, SEARCH, technical assistance | The community is ready for construction but still lacks design and environmental review |
| Acute drinking water emergency | Emergency Community Water Assistance Grant | The issue is deferred maintenance without a documented emergency |
| Small system operations support | RCAP, NRWA, technical assistance and training | The system expects consultants to replace local financial decisions |
| Larger blended infrastructure project | USDA plus SRF, CDBG, EPA, ARC, EDA, or state funds | The town assumes USDA will fund 100% without user rate changes |
One county water district with 3,200 users and a nitrate violation can make a stronger case by pairing the violation history, engineering alternatives, and rate impact with an income-based grant need. One town with a failing lagoon should not wait until permit enforcement becomes an emergency before starting predevelopment work. For live federal and state water opportunities, use the Grantsights grant search alongside USDA Rural Development, EPA, and state revolving fund pages.
Who Qualifies for USDA Water Grants
Eligible Applicants
- Public bodies (towns, counties, water districts, sewer districts, special-purpose districts)
- Nonprofit organizations
- Federally recognized tribes
Private individuals and for-profit businesses cannot apply.
Population Threshold: 10,000 or Fewer
The service area population must be 10,000 or fewer. This is one of the stricter USDA thresholds. Many USDA programs use 20,000 or 50,000. The population is measured by the area the water or sewer system will serve, not the entire municipality or county.
Verify eligibility at the USDA eligibility tool (opens in a new tab). Select "Water and Waste Disposal" as the program type.
What's Eligible for Funding
The program covers an extremely broad range of water and waste infrastructure:
Drinking Water:
- Water treatment plants (new or upgraded)
- Water storage tanks and towers
- Distribution lines and service connections
- Well drilling and pump installation
- Water meters and metering systems
- Arsenic, lead, and PFAS treatment systems
Wastewater:
- Sewage collection systems
- Wastewater treatment plants
- Lagoon systems
- Septic-to-sewer conversion projects
- Stormwater management systems
Solid Waste:
- Solid waste disposal facilities
- Recycling programs and equipment
- Transfer stations
Related Infrastructure:
- SCADA systems and automation
- Generator backup systems
- Office and maintenance buildings associated with the system
- Vehicles and equipment for system operation
How USDA Determines Your Grant Amount
This is where the program gets complicated. USDA doesn't just look at your income level and hand you a percentage. They run a financial analysis of the entire project to determine how much grant the community needs to keep user rates affordable.
The Process
- USDA calculates the total project cost based on engineering estimates
- They determine how much the community can afford in annual debt service (loan payments) based on projected user rates
- If user rates with 100% loan financing would exceed what USDA considers reasonable (typically compared to similar communities statewide), the difference is made up with grant funds
- The grant percentage is capped based on the community's income level
Income-Based Grant Caps
| Community Income | Maximum Grant Percentage |
|---|---|
| Below poverty line or 80% of state nonmetro MHI | Up to 75% |
| Between 80% and 100% of state nonmetro MHI | Up to 45% |
| Above state nonmetro MHI | Generally not eligible for grants |
In practice, most projects receive a grant-loan combination, and the split depends on the community's income and what users can afford to pay. Your state RD office sets the mix for each project.
Application Process: What to Expect
Phase 1: Predevelopment (3-6 months)
Before you can apply for construction funding, you need:
- Preliminary Engineering Report (PER): An engineer assesses your current system, identifies deficiencies, evaluates alternatives, and recommends a solution with cost estimates. Get a quote from your engineer early, because the cost varies with system size and complexity.
- Environmental Report: Documents the environmental conditions of the project area. USDA will use this to conduct their NEPA review.
- Financial Feasibility Analysis: Projects how user rates will need to change to support the project.
If you can't afford the PER, apply for a predevelopment planning grant first: up to $60,000 or 75% of predevelopment planning costs, if your area meets the income test.
Phase 2: Application (2-4 months)
With your PER and environmental report in hand, your application package includes:
- SF-424 application form
- Preliminary Engineering Report
- Environmental documentation
- Financial statements and audit
- Rate schedule and user agreement
- Legal authority to incur debt
- Board resolutions
- Evidence of other funding sources
- Service area map
Phase 3: USDA Review and Environmental Clearance (3-12 months)
USDA reviews the application, conducts the environmental review under NEPA, and determines the grant-to-loan ratio. Environmental reviews for water projects are often more involved than for other USDA programs because of water quality, wetlands, and Clean Water Act considerations.
Phase 4: Obligation and Construction (12-36 months)
After approval, USDA obligates the funds, the community goes through competitive bidding for construction, and USDA oversees the construction process. Davis-Bacon prevailing wage requirements apply.
Total timeline from start to finish: 2 to 5 years for most construction projects. This includes predevelopment, application, review, and construction. Plan accordingly.
What USDA's Website Doesn't Tell You About Water Grants
The official program description makes this sound like a standard grant application, but the reality is more complex than most people realize.
First, you almost certainly need an engineer from the start. Unlike some grant programs where you can write the application yourself, Water & Waste Disposal projects require professional engineering throughout the process. Budget for an engineer's involvement from predevelopment through construction completion. Engineering fees are a meaningful share of the project cost, and they're an eligible project expense.
Second, rate increases are expected. USDA's financial analysis assumes the community will charge reasonable user rates to support the project. If your community currently charges $25/month for water and the project requires $50/month, USDA expects you to raise rates. The grant portion reduces the rate increase needed, but some increase is almost always part of the deal. Communities that refuse to raise rates don't get funded.
Third, multiple funding sources are the norm, not the exception. Most water projects combine USDA with state revolving fund loans, EPA grants, CDBG, ARC (Appalachian Regional Commission), EDA, or state-specific programs. Your engineer and USDA state office should help you identify and layer these sources. Don't expect USDA to cover everything.
Fourth, the environmental review can stall your project. Projects near wetlands, floodplains, endangered species habitat, or historic properties face extended environmental reviews. If your project involves stream crossings, discharge permits, or land disturbance near sensitive areas, add 6 to 12 months for environmental clearance. Starting the environmental review early is one of the best things you can do for your timeline.
Finally, technical assistance is free and underused. USDA funds organizations like Rural Community Assistance Partnership (RCAP) and National Rural Water Association (NRWA) to provide free technical assistance to small water systems. These organizations will help with everything from rate studies to application preparation to operational improvements, at no cost. If your community has fewer than 10,000 people, you qualify for this help.
Predevelopment Planning Grants: The Smart First Step
Predevelopment planning grants are worth considering for most communities, especially those applying for Water & Waste Disposal funding for the first time.
What they fund:
- Feasibility studies
- Preliminary engineering reports
- Environmental assessments
- User surveys
- Rate analyses
Limits: Up to $60,000 or 75% of the predevelopment planning costs, according to USDA's predevelopment planning grant page (opens in a new tab). At least 25% must come from the applicant or third-party sources, and in-kind contributions don't count toward that minimum.
Who qualifies: Public bodies, nonprofits, and federally recognized tribes serving rural areas of 10,000 or fewer, tribal lands, or colonias, where median household income is below the poverty line or less than 80% of the statewide nonmetropolitan median. The grant can't pay for work already completed.
Why they matter: The PER and environmental report you produce with a predevelopment grant become the foundation of your construction application. Communities that skip this step and try to fund predevelopment costs out of their own budgets often produce lower-quality reports, which weakens their construction application.
Emergency Community Water Assistance Grants
If your community faces an acute water emergency, USDA has fast-tracked funding available:
| Emergency Type | Maximum Grant | Typical Turnaround |
|---|---|---|
| Natural disaster or acute system failure | $150,000 | Weeks to months |
| Significant decline in water quantity or quality needing water-source work | $1,000,000 | 1-3 months |
These grants are separate from the main Water & Waste Disposal program and have streamlined applications. Contact your state USDA Rural Development office (opens in a new tab) immediately if your community has a water emergency. Don't wait for a regular funding cycle.
Common qualifying emergencies include well contamination, water main breaks that a community can't afford to repair, drought conditions affecting water supply, and flooding damage to water or sewer systems.
How This Program Connects to Other USDA Funding
Water & Waste Disposal is part of the broader USDA Rural Development portfolio. Communities often use multiple USDA programs for different parts of their infrastructure needs. Our USDA grants guide covers the full range of USDA programs. For community buildings that aren't water-related, see the USDA Community Facilities grants program. Organizations working in rural areas should also review federal grants for rural organizations for a complete picture of available funding.
Related Guides
Sources
- USDA Water & Waste Disposal Program: https://www.rd.usda.gov/programs-services/water-environmental-programs (opens in a new tab)
- USDA Water & Waste Disposal Loan & Grant Program: https://www.rd.usda.gov/programs-services/water-waste-disposal-loan-grant-program (opens in a new tab)
- USDA Emergency Community Water Assistance Grants: https://www.rd.usda.gov/programs-services/water-environmental-programs/emergency-community-water-assistance-grants (opens in a new tab)
- USDA SEARCH Grant: https://www.rd.usda.gov/programs-services/water-environmental-programs/search-special-evaluation-assistance-rural-communities-and-households-grant (opens in a new tab)
- USDA Rural Eligibility Tool: https://eligibility.sc.egov.usda.gov/eligibility/welcomeAction.do (opens in a new tab)
- EPA Clean Water State Revolving Fund: https://www.epa.gov/cwsrf (opens in a new tab)
- EPA Drinking Water State Revolving Fund: https://www.epa.gov/dwsrf (opens in a new tab)
Next steps
Where to go next
These next pages help you move from research into a specific grant choice.
USDA water family
Compare Water and Waste Disposal, ECWAG, SEARCH, PPG, and household water routes.
Water infrastructure stack
Use when the project may need EPA SRF, state water funds, CDBG, EDA, or ARC money with USDA.
Other USDA facilities
Use when the rural asset is a clinic, library, fire station, or community site rather than water or sewer.
Search water grants
Compare current water, wastewater, and planning opportunities after route fit is clear.
Frequently Asked Questions
What's the population limit for USDA water grants?
The Water & Waste Disposal program serves communities with populations of 10,000 or fewer based on the latest decennial Census. This is stricter than most other USDA Rural Development programs, which use 20,000 or 50,000 thresholds. The 10,000 limit applies to the service area of the proposed project, not the entire county or municipality. If a water district serves 8,000 people even though it's in a county of 30,000, it may qualify. USDA verifies population using Census data and may request additional documentation if the service area boundary is unclear. Communities that have grown past 10,000 since the last Census may still qualify if the Census data supports eligibility.
Can USDA water grants fund an entirely new water system?
Yes. USDA Water & Waste Disposal funds both new construction and improvements to existing systems. A community that currently relies on individual wells and wants to build a centralized water treatment plant and distribution system can apply. Similarly, a community without a sewer system can apply to build a wastewater collection and treatment system from scratch. New systems are eligible for grants, loans, and combinations of both. However, new system projects tend to be large and expensive, so they often require multiple funding sources beyond USDA alone. Your state USDA office can help identify other federal and state programs to combine with USDA funding.
What's the difference between the water grant and the water loan?
USDA offers both grants and loans for water and waste disposal projects, and most communities use a combination. Grants don't need to be repaid. They're available to communities with median household incomes below the poverty line or the statewide nonmetropolitan median, whichever is higher. The grant amount depends on how low the community's income is and whether the resulting user rates would be excessive without grant assistance. Loans are repaid over up to 40 years at below-market interest rates set by USDA. The interest rate depends on the community's income level. Even communities that don't qualify for grants can get loans at favorable rates. USDA determines the specific grant-to-loan ratio for each project based on the community's financial capacity.
How do predevelopment planning grants work?
Predevelopment planning grants fund the preliminary work needed before you can apply for a full construction grant or loan. This includes feasibility studies, preliminary engineering reports, environmental assessments, and user surveys. The maximum award is $60,000 or 75% of the predevelopment planning costs, and at least 25% of the cost must come from the applicant or third parties (in-kind contributions don't count). Eligibility adds an income test to the main program's rules: the area must have 10,000 or fewer people and a median household income below the poverty line or less than 80% of the statewide nonmetropolitan median. Many communities use predevelopment planning grants to hire an engineer to assess their water or sewer needs and develop a plan, then use that plan as the basis for their construction application. It's a smart two-step approach.
What are USDA emergency water grants?
USDA provides Emergency Community Water Assistance Grants to rural communities facing water emergencies. Current USDA materials separate two caps: up to $150,000 for emergency repairs, replacement, or extensions of distribution systems, and up to $1,000,000 for water-source projects tied to a significant decline or imminent decline in water quantity or quality. These grants have expedited processing because they address urgent situations. The emergency must be documented, and the community should contact its state USDA Rural Development office immediately.
Last updated October 10, 2026. Corrected October 10, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
Complete Guide
Federal Grants for Nonprofits 2026: Where to Apply
Federal grants for nonprofits 2026: nonprofits got $42.7B in direct federal grants in FY2025, $25.4B from HHS. How to register, apply, and win subgrants.
USDA Water Grants 2026: WD, ECWAG, SEARCH
USDA water grants 2026: Water and Waste Disposal, ECWAG, SEARCH, planning grants, 10,000-person rural limit, rates, and route.
Environmental Justice Grants 2026: EPA & EJ Funding
Environmental justice grants in 2026: EPA's EJ office closed and ECJ funds were rescinded. 4 routes still pay: HUD, USDA, Brownfields, and states.
USDA Community Facilities Grants (2026 Guide)
USDA Community Facilities grants cover 15% to 75% of costs for rural towns of 20,000 or fewer. See the real grant tiers, scoring points, and how to apply.
USDA Housing Grants 2026: Complete Program Guide
USDA Section 502, 504, 514/516, and 515 housing programs in 2026: who qualifies, income limits, loan and grant caps, and how to apply.
USDA Local Food Grants Guide (2026)
USDA AMS awarded $26.8M in FY2025 local food grants. Compare LFPP, FMPP, RFSP, and Farm to School award ranges, match rules, and who can apply.