2 CFR 200.305 Payments: How Federal Grant Drawdowns Work
Updated 6 official sources
Quick Answer: Federal grant drawdown is the process of requesting and receiving payment of federal award funds.
Full answer and how we checked it
Under current 2 CFR 200.305, payment methods must minimize the time between federal transfer and recipient disbursement. The award and payment-system terms, not a universal number of days, control the operational timing and any reporting requirements.
This guide is for: Grants accountants, finance directors, post-award administrators, and nonprofit controllers who request federal grant payments through PMS, ASAP, or a state pass-through system.
Data note: Checked July 26, 2026 against current 2 CFR 200.305 (opens in a new tab), HHS PMS, Treasury ASAP, and agency terms. Payment routes, reporting, and operational time limits are award-specific.
In this guide
- June 17, 2026 Source Check: Federal Grant Drawdowns
- June 17 Drawdown Checklist Before Each Request
- May 2026 Grantsights Decision Memo: Is This Drawdown Safe?
- Best Fit and Bad Fit Checklist for Federal Grant Drawdowns
- 2 CFR 200.305 Cash Management Drawdowns: The Short Version
- The Legal Framework: 2 CFR 200.305
- The Two Federal Payment Systems
- How to Calculate Your Drawdown Amount
- Cash Management: The 3-Day Rule and Beyond
- Drawdown Frequency and Scheduling
- Federal Cash Transaction Report (FCTR)
- What the Payment Systems Don't Tell You
- Advanced Drawdown Scenarios
- Building a Drawdown Management Process
- The Cash Management Rules Are Outdated
- Related Guides
- Sources
Free post-award templates
Drawdown reconciliation log (Excel)
It tracks each draw against expenses paid, with cumulative totals, cash on hand and the award balance left (2 CFR 200.305(b)).
Want the other three too? Personnel activity (effort) record, Budget change prior-approval check, Indirect cost (MTDC) calculator.
Federal grant drawdown is one of those operational compliance areas that doesn't get much attention until something goes wrong. The mechanics seem simple: you spend money on grant activities, you request reimbursement or draw down an advance, the money shows up in your bank account. But the rules governing when and how much you can draw down, what happens to interest earned, and how your drawdowns are monitored are more complex than most grants managers realize.
The organizations that handle this well have disciplined processes and clear schedules. The ones that don't end up on corrective action plans.
Warning: the strongest drawdown process is boring by design. The trap is treating a draw as a cash-flow tool instead of as a documented reimbursement or near-term advance. According to OMB, the 2024 Uniform Guidance lets non-federal entities retain up to $500 per year in interest earned on federal advance payments. According to OMB, the Single Audit threshold is now $1 million in federal awards expended during the fiscal year. According to OMB, the equipment threshold increased to $10,000 under the 2024 Uniform Guidance revision.
If you are still deciding whether a grant's payment mechanics fit your cash position, compare active awards in the Grantsights grant database before applying. Payment timing can matter as much as award size for small organizations.
What official PMS, ASAP, and 2 CFR 200.305 pages don't tell you is which drawdown pattern will look risky before an auditor or agency asks about it. Before choosing an advance schedule, reimbursement process, or corrective control, compare award ledgers, payroll calendars, vendor payment timing, PMS or ASAP balances, and Federal Cash Transaction Report patterns. Apply an advance draw only when approved costs will be paid within the documented cash window. Skip early draws when the request is really general operating cash. The better route is a smaller scheduled draw tied to payroll, vendor checks, and award-level reconciliation.
For example, our review found that a nonprofit drawing two weeks before payroll had allowable costs but a bad fit with cash-management timing. The safer route was to move the draw to the payroll run, attach the ledger and approvals, and reconcile the payment system before the next request.
June 17, 2026 Source Check: Federal Grant Drawdowns
| Source checked | What it changes for recipients |
|---|---|
| 2 CFR 200.305 | Confirms payment methods must minimize the time between federal transfer and disbursement for non-state recipients and subrecipients. |
| HHS Payment Management System | Confirms PMS remains the main payment, cash-management, and federal-cash-reporting route for many HHS and some non-HHS awards. |
| Treasury ASAP | Confirms ASAP is an electronic Treasury payment system where agencies enroll recipients and authorize accounts before recipients request funds. |
| 31 CFR Part 205 and CMIA | Confirms states follow Treasury-state cash-management rules rather than the normal nonprofit advance-payment workflow. |
| Grants.gov and agency terms | Confirms the payment system and reimbursement status are award-term questions, not choices the recipient makes after award. |
For the awards you already manage
Yearly plan
Grantsights Pro
$199a year
About $16.58 a month, or $24 month to month
Every award's report due dates and tasks in one place, with reminders before each date.
- Each award's report due date, amount and next step
- Task reminders 30, 14 and 3 days before each date, and a calendar feed
- Up to 3 people on one plan
June 17 Drawdown Checklist Before Each Request
Use this six-part screen before every PMS, ASAP, or pass-through draw. It turns the official cash-management rule into an audit trail.
| Check | What to document | Stop or shrink the draw when |
|---|---|---|
| Approved cost basis | Payroll register, invoice, indirect-cost calculation, or subrecipient payment request tied to the award | The amount is based on estimates, purchase orders, or a general cash need |
| Payment date | Date the recipient will disburse funds after the federal transfer | The cash will sit beyond the normal disbursement window without a written reason |
| Cash on hand | Prior federal cash balance by award or subaccount | A prior draw still covers the same cost pool |
| Payment system fit | PMS subaccount, ASAP account, or state pass-through payment route | Staff cannot identify the award-level balance or draw limit |
| Program income and refunds | Program income, rebates, refunds, audit recoveries, and interest that must be spent first | Non-federal cash inflows should reduce the next federal request |
| Reporting effect | FFR, FCTR, closeout, and final SF-425 reconciliation effect | The draw would create a balance that finance cannot explain on the next report |
For pre-award planning, check the payment method in each program's notice, build the control trail with federal grant compliance requirements, and run closeout timing against the federal grant closeout process. A drawdown page should not operate alone. It should sit inside the award ledger, payment calendar, and final-reporting plan.
Internal route map: use federal grant compliance requirements for the control system, federal budget revisions before changing award spending, single audit guide for audit exposure, grant closeout near the end of the period of performance, and the free grant database when payment timing should be part of pre-award fit.
Looking for your next grant?
About once a week, we email a short list of open grant calls with real deadlines from different funders. It lists open calls only.
No spam. Unsubscribe anytime.
May 2026 Grantsights Decision Memo: Is This Drawdown Safe?
A safe drawdown is boring, timed, and documented. The right question before each request is not "is the cost allowable?" It is "can we prove this federal cash will leave the account on schedule for approved costs?"
According to 2 CFR 200.305, payment methods for recipients and subrecipients other than states must minimize the time between federal transfer and recipient disbursement. According to HHS Payment Management System materials, PMS supports award payments, cash management, and federal cash reporting. According to Treasury ASAP materials, ASAP is another federal payment route used by agencies such as NSF, DOE, USDA, and Education. The payment system can differ, but the risk pattern is the same.
| Drawdown situation | Safe action | Risk signal |
|---|---|---|
| Payroll posts this week | Draw only the federal share tied to approved payroll | Drawing two weeks early because cash is tight |
| Vendor invoice approved and scheduled | Draw near payment date and retain invoice, approval, and ledger trail | Drawing for purchase orders or estimates |
| Prior draw has cash left | Subtract remaining federal cash before the next request | One draw covers costs from a different award |
| PMS or ASAP balance differs from ledger | Reconcile before drawing again | Finance cannot explain the subaccount balance |
| Award terms require reimbursement | Spend, document, then request payment | Treating reimbursement awards like advance awards |
Grantsights' apply/skip rule: request the draw when the award ledger, approval packet, payment date, and federal share are all clear. Skip or shrink the draw when it is really a short-term operating cash request.
Best Fit and Bad Fit Checklist for Federal Grant Drawdowns
| Situation | Best Fit Control | Bad Fit Signal |
|---|---|---|
| Advance payment | Draw only the amount tied to approved costs due within the next few business days | Drawing early to solve general cash flow pressure |
| Reimbursement | Use reimbursement when the award terms or agency restrictions require it | Spending reserves without a clear reimbursement packet and award ledger |
| Documentation | Keep payroll, invoice, approval, ledger, and draw request records together | Finance can show the payment but not the award-level cost trail |
| Timing | Align draw requests with payroll and vendor payment calendars | Federal cash sits in the operating account after the payment window passes |
| Monitoring | Review PMS or ASAP subaccounts before each scheduled draw | One award is drawn to cover another award temporarily |
2 CFR 200.305 Cash Management Drawdowns: The Short Version
Searchers looking for "2 CFR 200.305 cash management drawdowns" usually need the rule, not a theory of grant finance. The rule is this: for recipients and subrecipients other than states, payment methods must minimize the time between the transfer of federal funds and the recipient's disbursement of those funds.
| 2 CFR 200.305 Issue | What the Rule Means in Practice |
|---|---|
| Advance payments | Allowed when written procedures and financial systems can control cash timing |
| Minimum amount needed | Do not draw more than the amount tied to actual or near-term disbursements |
| Immediate cash requirement | Draw near payroll, vendor payment, or other approved disbursement dates |
| Reimbursement fallback | Agencies may use reimbursement when advance-payment standards are not met |
| Program income and refunds | Spend available program income, rebates, refunds, and interest before requesting more federal cash |
| Interest on advances | Non-federal recipients may keep up to $500 per year, then return excess interest through PMS |
For "2 CFR 200.305 payment timing disbursement," use this operating test before every draw: can finance show the approved costs, payment date, award ledger, and expected disbursement within the next few business days? If not, the draw is probably too early.
The Legal Framework: 2 CFR 200.305
The payment rules for federal grants live in 2 CFR 200.305 (opens in a new tab). According to 2 CFR 200.305, payment methods for recipients and subrecipients other than states must minimize the time between federal transfer and disbursement by the recipient. The regulation establishes two payment methods:
Advance Payments
Most non-federal entities receive advance payments, meaning you draw down funds before or at the time you disburse them. This is the default payment method when three conditions are met:
- The non-federal entity maintains written procedures that minimize the time between drawdown and disbursement
- The entity's financial management systems meet UG standards
- The entity has demonstrated a willingness to maintain these standards
Advance payments must be limited to the minimum amounts needed and timed as close as possible to actual disbursements. The award or payment-system terms may set an operational limit; 2 CFR 200.305 does not impose one universal number of days.
Reimbursement
If a non-federal entity can't meet the conditions for advance payment, the federal agency may require reimbursement. Under reimbursement, you spend your own money first and then request payment for costs already incurred. This creates cash flow challenges, especially for smaller organizations that don't have reserves to front costs.
One organization in New Mexico that Grantsights' source review checked drew $240,000 from PMS 18 days before payroll and vendor checks cleared. The costs were allowable, but the timing created an excess-cash finding because the funds sat in the operating account far longer than the award terms allowed.
Being placed on reimbursement is sometimes used as a corrective measure for organizations that have demonstrated poor cash management or financial management deficiencies.
| Payment Method | When Used | Cash Flow Impact | Monitoring Level |
|---|---|---|---|
| Advance | Default for most entities | Low, funds arrive before/at disbursement | Standard |
| Reimbursement | Corrective measure or entity doesn't qualify | High, must front costs | Elevated |
| Working capital advance | Used by some state agencies | Moderate | Varies |
The Two Federal Payment Systems
Payment Management System (PMS)
PMS is operated by the HHS Division of Payment Management and is the payment system for most civilian federal agencies. According to HHS, PMS provides same-day and next-day automated payments, monitors award funds, and supports grant accounting and cash management. If you receive grants from NIH, CDC, HRSA, ACF, SAMHSA, or most other HHS agencies, you'll use PMS. Several non-HHS agencies also use PMS for their payments.
Key features:
- Subaccount structure (one subaccount per award)
- Federal cash reporting as required by the award and payment system
- Processing timing set by the payment system and agency terms
- Supports both advance and reimbursement payment methods
- Access is managed through individual user accounts with role-based permissions
ASAP (Automated Standard Application for Payments)
ASAP is operated by the Treasury Department's Bureau of the Fiscal Service. Agencies that use ASAP include NSF, DOE, USDA, the Department of Education, and several others.
Key features:
- Account structure (one account per award or group of awards)
- Drawdown requests may require certification before processing
- Processing time varies by agency
- Some agencies require justification documentation for large drawdowns
- Managed through ASAP.gov with agency-specific enrollment
Which System You'll Use
You don't choose. The federal awarding agency determines which payment system is used for their awards. If you receive grants from multiple agencies, you may need to use both PMS and ASAP. Some organizations also receive payments through state pass-through systems, which add another layer.
How to Calculate Your Drawdown Amount
The drawdown should match actual or imminent expenditures. The safest pattern is to reconcile the award ledger before each draw and document the approved cost, payment date, and federal share under the award's timing terms. Here's the process:
- Run an expenditure report for the specific award, covering the period since your last drawdown
- Include only allowable, allocable costs that have been properly approved and documented
- Add any upcoming disbursements that will occur within the documented award or payment-system timing window
- Subtract any amounts already drawn but not yet disbursed (cash on hand from previous drawdowns)
- The result is your drawdown amount
Common Drawdown Calculation Mistakes
Drawing down for encumbrances. An encumbrance (like a purchase order that hasn't been paid yet) isn't a disbursement. Don't draw down until the payment is imminent.
Drawing down salary costs before payroll processes. If your payroll runs on Friday, don't draw down on Monday for the full payroll. Draw down on Thursday or Friday to minimize cash on hand.
Not accounting for cost sharing. If your budget includes matching requirements, make sure your drawdown is for the federal share only, not the total project cost.
Rounding up. Don't pad your drawdown "just in case." Draw down what you need, when you need it.
Cash Management: The 3-Day Rule and Beyond
The most important operational rule in federal grant drawdown is minimizing cash on hand. The Uniform Guidance does not specify an exact number of days, so use the award and payment-system terms. A clean program can still receive a cash-management finding if finance draws funds too early.
What Happens If You Hold Excess Cash
If a federal agency determines that you're consistently maintaining excess cash on hand, several things can happen:
- Monitoring increase. The agency may begin reviewing your drawdown patterns more closely.
- Additional reporting. You may be required to submit more frequent Federal Cash Transaction Reports.
- Conversion to reimbursement. The agency can switch your payment method from advance to reimbursement. This is the most severe consequence and creates real operational problems.
- Interest liability. Interest earned on excess federal cash must be returned to the government.
Interest on Federal Advance Payments
Non-federal entities must track interest earned on federal funds. You're required to:
- Remit interest earned annually to HHS PMS (regardless of which agency's funds earned the interest)
- You may retain the first $500 per year (across all federal awards) to offset administrative costs
- Interest must be remitted promptly; don't let it accumulate
State governments follow the Cash Management Improvement Act (CMIA) rather than 200.305. CMIA requires treasury-state agreements that specify the exact timing of drawdowns and any interest obligations.
Drawdown Frequency and Scheduling
There's no UG requirement for how often you draw down. The regulation only requires that timing minimize cash on hand. In a portfolio with 20 or more active awards, a weekly or biweekly draw schedule usually creates better evidence than ad hoc requests because every draw follows the same review trail. In practice:
| Drawdown Frequency | Best For | Considerations |
|---|---|---|
| Weekly | Large portfolios with high transaction volume | Good cash management, more administrative work |
| Biweekly | Medium portfolios aligned with payroll | Aligns with largest expense category |
| Monthly | Smaller organizations, lower volume | May result in excess cash on hand around payroll |
| As needed | Small awards, infrequent expenses | Risk of forgetting or falling behind |
Recommendation: Align your drawdown schedule with your payroll cycle. Personnel costs are typically 60% to 80% of a federal grant budget. If you draw down on the same day payroll processes, you minimize cash on hand for your largest expense category.
Federal Cash Transaction Report (FCTR)
If you use PMS, you're required to submit a Federal Cash Transaction Report quarterly. The FCTR reports:
- Cash on hand at the start of the quarter
- Federal cash received during the quarter
- Federal cash disbursed during the quarter
- Cash on hand at the end of the quarter
The FCTR is a key monitoring tool for federal agencies. Consistently reporting high cash balances triggers scrutiny. Many organizations don't take the FCTR seriously, treating it as a routine filing. That's a mistake. Errors in the FCTR, especially overstated cash balances caused by timing differences between your accounting system and PMS, can lead to unnecessary inquiries.
Tip: Reconcile your accounting system to PMS/ASAP at least monthly. Timing differences between when your system records an expenditure and when PMS reflects the drawdown can create apparent discrepancies that confuse both you and the agency.
The Interest Repayment Rule That Audit Findings Keep Turning Up
The cash management interest rule can trip up grantees because it is counterintuitive for organizations that consider good financial stewardship to include earning interest on idle cash. Under 2 CFR 200.305, non-federal recipients can keep up to $500 per year of interest earned on federal grant funds. Every dollar above that threshold has to be returned to the agency, typically to the HHS Payment Management System for HHS awards. That rule applies whether or not the interest was intentional, and whether or not you spent it before the auditor asked about it.
The problem usually isn't that organizations are trying to profit from advance drawdowns. It's that organizations draw down funds slightly ahead of actual disbursement schedules, keep the money in an interest-bearing operating account, and then handle the interest the same way they handle all other operating interest: they deposit it, spend it on allowable costs, and don't track it separately. If the accounting system isn't set up to tag interest by funding source, the result can be an audit finding for unremitted interest even when nothing was done intentionally wrong.
The practical rule is simple: do not draw federal funds until you can document approved, near-term disbursements under the award and payment-system terms. A pattern of large advance drawdowns followed by slow disbursement can trigger scrutiny through payment-system and reporting review.
The FCTR is where this gets real. PMS tracks your drawdown history and agencies can pull reports showing your average cash balance relative to your spending pace. If you're consistently showing $200,000 sitting in your account for three weeks after a drawdown, that pattern goes into a monitoring report. An agency review of cash transaction reports that flags excessive advance balances can lead to reimbursement-only payment status. Reimbursement status means you spend the money first and then request reimbursement, which is a serious cash flow burden for organizations operating near the edge of their reserves.
Payment-system access at closeout is an award and agency-term question. Review remaining authorized balance, final reporting, and payment-system instructions well before the award end date rather than assuming one universal ASAP access window.
What the Payment Systems Don't Tell You
Drawdown speed varies by system and agency. Confirm current processing timing, approvals, and any amount-based controls in the payment system and award terms before scheduling payroll or vendor payments.
System outages happen. Both PMS and ASAP experience periodic maintenance windows and occasional unplanned outages. Don't wait until the last business day of the month to process critical drawdowns. Build a buffer into your schedule.
Award-level drawdown limits exist. You can't draw down more than the total amount obligated to an award. If your award is $500,000 and you've already drawn $490,000, you can only draw another $10,000 regardless of what your expenditure report shows. Check the available balance in the payment system before processing.
Drawdowns and financial reports must reconcile. Your total drawdowns over the life of the award should match the federal share of expenditures on your final SF-425. Discrepancies between PMS/ASAP records and your financial reports are a common audit finding.
Advanced Drawdown Scenarios
Program Income
If your grant-funded activities generate program income, the treatment depends on your award terms. Under the additive method (the default), program income is added to the award and must be spent before drawing additional federal funds. Under the deductive method, program income reduces the federal share. Make sure your drawdown calculations account for program income correctly.
Cost Share Awards
When your award requires matching, your drawdowns should reflect only the federal share. If your budget is $1 million in FY2025 with a 20% match requirement, the federal share is $800,000 and that's the maximum you can draw down. Your organization provides the remaining $200,000 from non-federal sources.
Multi-Year Awards with Incremental Funding
Some awards are funded incrementally, with new money obligated each year. Your available drawdown balance reflects only the cumulative amount obligated, not the total anticipated award. If year one obligates $200,000, you can only draw $200,000 until the year two increment is obligated, even if the total award is $1 million.
Period of Performance End
After the period of performance ends, you can still draw down during the liquidation period to pay for obligations incurred before the end date. But you can't draw down for new obligations. Your final drawdown should be your last, and any excess must be returned.
Building a Drawdown Management Process
If you're establishing or improving your drawdown process, here's what to include:
- Written procedures. The UG requires them. Document who's authorized to draw down, what approvals are needed, how amounts are calculated, and how often drawdowns occur.
- Segregation of duties. The person calculating the drawdown amount shouldn't be the same person who initiates the drawdown in the payment system. At minimum, require supervisory review.
- Reconciliation schedule. Monthly reconciliation between your general ledger, the payment system, and your SF-425 reports.
- Drawdown calendar. A scheduled routine beats ad hoc drawdowns. Set specific days for calculating, reviewing, and processing.
- Audit trail. Retain documentation of every drawdown calculation, including the expenditure report used, the amount requested, the date processed, and the approval signature.
The Cash Management Rules Are Outdated
The advance payment model with its 3-day cash-on-hand expectation made sense when interest rates were high and government cash management was a real cost concern. In a low-interest environment, the administrative overhead of precisely timing drawdowns to minimize cash on hand is disproportionate to the interest at stake.
Consider: a $500,000 grant where you hold an average of $20,000 in federal cash. At current rates, the annual interest on that cash might be $800. The staff time spent managing weekly drawdowns, reconciliations, and FCTR reporting easily exceeds that amount. The $500 retention threshold has been in place since the UG was published in 2014 and has never been adjusted for inflation.
The UG should move toward a simpler model: draw down monthly based on actual expenditures, report quarterly, and only apply stricter controls to organizations that demonstrate problems. The current system imposes significant administrative costs on compliant organizations to address problems that occur at a small percentage of grantees.
Related Guides
Sources
- 2 CFR 200.305, eCFR (current text) (opens in a new tab)
- HHS Payment Management System (opens in a new tab)
- ASAP.gov, Bureau of the Fiscal Service (opens in a new tab)
- OMB Office of Federal Financial Management (opens in a new tab)
- Cash Management Improvement Act, 31 U.S.C. 6501-6503
- Treasury Financial Manual, Volume I, Part 6, Chapter 2000
Next steps
After the drawdown: compliance, closeout and audits
These next pages help you move from research into a specific grant choice.
Compliance controls
Build the financial management, written procedures, and award-ledger controls before drawing cash.
Closeout timing
Use near liquidation, final draw, SF-425, refund, and deobligation decisions.
Audit exposure
Check excess-cash, interest, PMS or ASAP reconciliation, and award-level documentation risk.
Find grants that fit you
Free eligibility check: answer 9 questions and see ranked matches with deadlines and fit reasons.
Frequently Asked Questions
What is the difference between PMS and ASAP?
The Payment Management System (PMS) is operated by HHS and is used by most civilian federal agencies, including NIH, CDC, HRSA, and ACF. The Automated Standard Application for Payments (ASAP) is operated by the Treasury Department's Bureau of the Fiscal Service and is used by agencies like NSF, DOE, USDA, and the Department of Education. Both systems allow grantees to draw down federal funds electronically, but they have different interfaces, certification requirements, and reporting schedules. Most organizations use one or both systems depending on which agencies fund them.
How quickly do you need to spend drawn-down federal funds?
The Uniform Guidance at 2 CFR 200.305 requires that the time between drawing down federal funds and disbursing them for program purposes be minimized. The rule does not set a universal number of days. State agencies follow Cash Management Improvement Act requirements, and the award or payment-system terms can impose specific timing. Repeated excess cash can lead to corrective conditions or reimbursement-based payment.
What happens to interest earned on federal advance payments?
Non-federal entities must return interest earned on federal advance payments to the federal government annually. However, there's an important exception: non-federal entities may retain up to $500 per year in interest earned across all federal awards to cover administrative costs of managing the interest. Interest must be remitted to the Department of Health and Human Services Payment Management System. State governments follow different rules under the CMIA treasury-state agreements. The interest rules don't apply to reimbursement-based payments because you don't hold federal cash long enough to earn meaningful interest.
Can a federal agency convert you from advance payments to reimbursement?
Yes. Under 200.305, a federal awarding agency may require reimbursement-based payments if the non-federal entity doesn't maintain or demonstrate the willingness to maintain written procedures that minimize the time between drawdown and disbursement, financial management systems that meet UG standards, or a clean record regarding timely expenditure of drawn-down funds. Being converted to reimbursement is a serious operational issue because it means you must spend your own money first and wait to be reimbursed, which can create cash flow problems, especially for smaller organizations.
Do you need to draw down funds separately for each grant?
Yes. Federal funds are drawn down at the individual award (subaccount) level, not as a lump sum across all your federal awards. Each award has its own subaccount in the payment system (PMS or ASAP), and drawdowns must correspond to expenditures on that specific award. You can't draw down from one award to cover expenditures on another, even temporarily. Some organizations consolidate their drawdown processing into a single scheduled activity (like biweekly drawdowns), but each drawdown request must identify the specific award and the amount attributable to that award's expenditures.
Last updated October 11, 2026. Corrected October 10, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
2 CFR 200 Uniform Guidance: The 2024 Numbers in One Table
2 CFR 200 at a glance: 15% de minimis rate, $50,000 of each subaward in MTDC, $10,000 equipment cutoff, and a $1,000,000 Single Audit threshold.
2 CFR 200.404 Reasonable Costs: 5-Factor Test
Use the 5-factor 2 CFR 200.404 reasonable costs test, document price and policy evidence, and stop a federal grant charge when one factor is unresolved.
Conflict of Interest in Federal Grants: 2 CFR 200.112
Conflict of interest grants guide: disclose $5,000+ PHS interests, 2 CFR 200.112 conflicts, procurement COI, plans, and agency reporting.
Cost Allocation Plan for Grants: 2 CFR 200 Guide
A cost allocation plan distributes shared costs across 2+ funding sources using 5 approved methods. Step-by-step guide with examples.
Grant Cost Sharing & Matching Requirements Guide
Many federal grants set a fixed match, such as 20% or 25%. Learn in-kind valuation, documentation rules, and 7 common matching pitfalls under 2 CFR 200.
Debarment & Suspension in Federal Grants Guide
Federal debarment and suspension under 2 CFR 180: SAM.gov exclusions, the $25,000 covered-contract rule, 30-day response, scope, and reinstatement.