Grant Period of Performance Guide (2026)
Updated 10 official sources
Quick Answer: The grant period of performance defines when allowable costs may be charged to a federal award.
Full answer and how we checked it
Under 2 CFR 200.309, costs must be incurred during the period of performance unless an approved exception applies. Pre-award costs, extensions, carryover, and payment of prior obligations are controlled by the award and agency procedure. Current closeout rules generally provide 120 calendar days for required final reports and liquidation of obligations.
Who this is for: grants managers, principal investigators, post-award administrators, and financial staff responsible for tracking grant spending timelines. If you're managing the timing of expenditures on federal awards, understanding the grant period of performance rules prevents disallowed costs.
Data note: Checked July 26, 2026 against current 2 CFR 200.309 (opens in a new tab), 2 CFR 200.344 (opens in a new tab), 2 CFR 200.458 (opens in a new tab), and 2 CFR 200.308 (opens in a new tab). Award terms and agency procedure control approvals and operational deadlines.
In this guide
- The Legal Framework: 2 CFR 200.309
- Key Timing Concepts
- Pre-Award Costs: Award-Authority Check
- No-Cost Extensions (NCEs)
- How to Request an NCE: Deadlines and Where to File
- Carryover: Moving Funds Between Budget Periods
- The Liquidation Period
- Common Period of Performance Mistakes
- What the Period of Performance Rules Don't Tell You
- The Case for Updating the 90-Day Rule
- Related Guides
- How Grantsights Checked This Guide
- Sources
Free post-award templates
Budget change prior-approval check (Excel)
It walks the ten changes in 2 CFR 200.308(f) that need written approval, plus the 10% transfer test.
Want the other three too? Personnel activity (effort) record, Drawdown reconciliation log, Indirect cost (MTDC) calculator.
The grant period of performance is one of those compliance concepts that seems simple until you're dealing with a real situation. Your award says the project period is September 1, 2025 through August 31, 2028. You can spend money during that time. You can't spend money outside that time. Done, right?
Not quite. The 90-day pre-award cost rule, the difference between obligations and expenditures, the liquidation period, carryover provisions, no-cost extensions, and budget period vs. project period distinctions all create complexity that trips up even experienced grants managers.
The Legal Framework: 2 CFR 200.309
The core rule on period of performance lives in 2 CFR 200.309 (opens in a new tab): a non-federal entity may charge to the Federal award only allowable costs incurred during the period of performance.
That single sentence governs when costs can be charged to a federal grant. But the details, exceptions, and practical implications fill the rest of this guide.
For the awards you already manage
Yearly plan
Grantsights Pro
$199a year
About $16.58 a month, or $24 month to month
Every award's report due dates and tasks in one place, with reminders before each date.
- Each award's report due date, amount and next step
- Task reminders 30, 14 and 3 days before each date, and a calendar feed
- Up to 3 people on one plan
Key Timing Concepts
Budget Period vs. Project Period
Many federal awards, especially multi-year grants, distinguish between the project period (the full duration of the award) and budget periods (segments within the project period, typically 12 months each).
| Term | Definition | Example |
|---|---|---|
| Project period | Total duration of the award | Sept 1, 2025 to Aug 31, 2028 (3 years) |
| Budget period | Segment within the project period | Year 1: Sept 1, 2025 to Aug 31, 2026 |
| Period of performance | Used interchangeably with project period in the UG | Same as project period |
| Period of availability | Agency term for the time funds are available for obligation | May differ from project period for formula grants |
Why the distinction matters: Carryover provisions operate at the budget period level. Automatic carryover means unspent funds from Year 1 flow into Year 2. Restricted carryover means you need approval to move Year 1 funds into Year 2.
Obligation vs. Expenditure
This distinction is critical for understanding what "incurred during the period of performance" means:
- Obligation: A binding commitment. You've entered a contract, issued a purchase order, hired an employee, or authorized a travel trip. The obligation date is when the commitment is made.
- Expenditure: The actual payment. The check is written, the ACH transfer processes, the payroll disbursement occurs.
The UG requires that obligations be incurred during the period of performance. Expenditures (payments for those obligations) can occur after the period ends, during the liquidation period.
Practical example: Your grant ends June 30. On June 25, you order $3,000 in lab supplies (obligation). The supplies arrive July 10 and the invoice is paid July 20 (expenditure). This is allowable because the obligation was incurred before the end date.
Not allowable: Your grant ends June 30. On July 5, you realize you have unspent funds and order $3,000 in supplies. This obligation occurred after the period of performance and the cost is unallowable regardless of when it's paid.
Looking for your next grant?
About once a week, we email a short list of open grant calls with real deadlines from different funders. It lists open calls only.
No spam. Unsubscribe anytime.
Pre-Award Costs: Award-Authority Check
What 200.458 Allows
Under 2 CFR 200.458, pre-award costs must be necessary for efficient and timely performance, allowable if incurred after the award date, and approved when required. The award and federal agency determine whether and when a recipient can charge those costs. These pre-award costs must:
- Be necessary for the efficient and timely performance of the project
- Be allowable under the cost principles
- Be incurred at the non-federal entity's own risk
What "At Your Own Risk" Means
This is the most important caveat. If you spend money 60 days before your award starts and the award isn't made, or the agency decides those costs aren't allowable, you eat the cost. There's no appeal. You gambled and lost.
When it makes sense to incur pre-award costs:
- You've received a Notice of Award but the official start date is in the future
- You need to hire staff or purchase equipment to be ready on day one
- Delaying would significantly impair the project's ability to meet objectives
When it doesn't make sense:
- You haven't received official notification that the award will be made
- The costs aren't directly tied to project readiness
- Your organization can't absorb the cost if things fall through
Pre-Award Costs Beyond 90 Days
If you need to incur costs before the authorized start date, use the agency's written approval route where the award or agency procedure requires it. This can arise when:
- Award negotiations take longer than expected
- The agency requests that work begin before the formal award
- There are long lead-time purchases (specialized equipment, facility renovations)
Document the agency's written approval and retain it with the award file.
No-Cost Extensions (NCEs)
A no-cost extension extends the period of performance without additional funding. It gives you more time to complete the project and spend existing funds.
The One-Time Grantee-Approved NCE
When the award authorizes recipient action, an authorized organizational representative may make one one-time NCE of up to 12 months. Requirements:
- Must follow the award and agency procedure, including any notice deadline
- The extension must be needed to complete the project scope
- Additional time, not additional funds, is the purpose
- Must notify the federal agency in writing
This is not automatic. You must take affirmative action to request it. If your award ends and you haven't requested an NCE, the period of performance is over.
Agency-Approved NCEs
Second and subsequent NCEs require prior written approval from the federal awarding agency. The request should include:
- Justification for why additional time is needed
- Description of remaining work to be completed
- Updated timeline
- Updated budget showing how remaining funds will be spent
- Explanation of why the work wasn't completed on time
Agencies will scrutinize second NCE requests more carefully. "We still have money left" isn't an adequate justification. You need to demonstrate that specific project objectives remain unmet and that additional time will enable completion.
NCE Best Practices
Request early. Use the award's notice or submission deadline and leave time to resolve an authority restriction before the end date.
Don't use NCEs to avoid returning funds. If the project objectives have been met and money is left over, the right action is to close out the grant and return the unexpended balance. Using an NCE to create time to spend down remaining funds on tangential activities is a compliance risk.
Update your budget. When you extend the period of performance, your spending plan changes. Update the budget to reflect what you'll spend during the extension period and make sure it aligns with remaining project objectives.
How to Request an NCE: Deadlines and Where to File
The federal floor is 10 calendar days. Under 2 CFR 200.308(g)(2) (opens in a new tab), when your award authorizes a one-time extension of up to 12 months, you still have to notify the agency in writing, with a justification and a revised end date, at least 10 calendar days before the period of performance ends. The one-time extension isn't available if the award terms prohibit it, if it needs more federal funds, or if it changes the approved scope, and it can't be used just to spend unobligated balances. Later extensions need prior approval, and 200.308(f)(10) says those requests should also arrive at least 10 calendar days before the end date.
Agencies layer their own procedures on top:
| Agency | One-time extension | Later extensions |
|---|---|---|
| NIH | Filed only through the eRA Commons No-Cost Extension feature, which opens 90 days before the project end date and works through the last day; email and fax notices aren't accepted, and a late notice becomes a request that needs approval (NIH GPS 8.1.1.3 (opens in a new tab)) | Prior approval from the awarding institute |
| NSF | The AOR notifies NSF electronically at least 10 calendar days before the end date; no amendment is issued (PAPPG Chapter VI (opens in a new tab)) | Formal request at least 45 days before the end date; a program officer decides the first, a Grants and Agreements Officer the second |
NSF also won't let a grantee extend an award with a zero balance. If you're a subrecipient, your request goes to the pass-through entity, which 200.308 treats the same way as the federal agency for prior approvals. Ask the prime early so it can fit your request into its own timeline.
Carryover: Moving Funds Between Budget Periods
Automatic Carryover
Under automatic carryover, unspent funds from one budget period flow into the next without agency approval. The most notable programs with automatic carryover:
- NIH research grants (R01, R21, etc.)
- NSF research grants
- Many USDA NIFA grants
With automatic carryover, you still need to manage your budget responsibly. Consistently underspending can signal to the agency that your budget was inflated, which can affect future funding decisions.
Restricted Carryover
Under restricted carryover, you must request and receive written approval to carry unspent funds from one budget period to the next. Programs with restricted carryover include:
- Most Department of Education discretionary grants
- Many cooperative agreements
- Some agency-specific programs
The carryover request typically includes:
- Amount to be carried forward
- Reason funds weren't spent in the original budget period
- Plan for spending the funds in the next period
- Updated budget
What Happens If Carryover Isn't Approved
If you have restricted carryover and the agency doesn't approve your request, the unspent funds generally revert to the agency. You don't lose the funds from subsequent budget periods, but you lose the unspent amount from the prior period. This underscores the importance of monitoring your budget throughout the year and requesting carryover promptly.
The Liquidation Period
After the period of performance ends, you enter the liquidation period. This is the window for paying obligations incurred before the end date and submitting final reports. Under 2 CFR 200.344, the liquidation period is 120 days.
What You Can Do During Liquidation
- Pay invoices for goods and services ordered before the end date
- Process final payroll allocations for work performed before the end date
- Collect and pay subrecipient final invoices for work performed before the end date
- Make cost transfers and adjustments for the award period
- Submit final financial and progress reports
What You Can't Do During Liquidation
- Incur new obligations
- Start new activities
- Issue new purchase orders or contracts
- Hire new staff
- Extend existing commitments beyond the original terms
The liquidation period is not an extension of the project. It's an administrative window for wrapping up financial transactions.
Common Period of Performance Mistakes
1. Charging Costs Outside the Period
This is the most straightforward violation and one of the easiest to detect in an audit. Costs with a transaction date before the start date or after the end date (without pre-award or liquidation justification) are disallowed. Your accounting system should have controls that flag charges outside the award dates.
2. Confusing Budget Period and Project Period Deadlines
If your Year 1 budget period ends August 31 and you have restricted carryover, you need to request approval to carry Year 1 funds into Year 2 before August 31. Missing this deadline can mean losing unspent Year 1 funds even though the overall project continues.
3. Missing the NCE Notification Deadline
If you realize on March 28 that your award ending March 31 needs an extension, you're probably too late. Most agencies require 10 to 30 days' notice. Set calendar reminders at least 90 days before every award end date.
4. Treating the Liquidation Period as Project Time
A common mistake is ordering new equipment during the liquidation period because "the grant hasn't closed yet." It has. The period of performance is over. You're in an administrative cleanup window, not a project continuation.
5. Not Tracking Obligations Separately from Expenditures
If your accounting system only tracks expenditures (payments), you may miss obligations that haven't been paid yet when the period of performance ends. Set up encumbrance tracking for open purchase orders, pending invoices, and committed salary allocations.
What the Period of Performance Rules Don't Tell You
The 90-day pre-award rule has agency exceptions. Some agencies prohibit pre-award costs entirely. Others have shorter windows. NIH generally follows the 90-day rule, but some NIH programs restrict pre-award spending. Always read the specific award terms.
No-cost extensions have political considerations. Requesting too many NCEs or extending too often can signal to program officers that you're not managing the project well. This can affect your competitive position for future awards, even if the NCE is technically justified.
Budget period end dates aren't always obvious. For some awards, particularly those with non-standard budget periods or mid-year start dates, the budget period end date may not align with your fiscal year end. Verify budget period dates on your Notice of Award and mark them in your tracking system.
Carryover provisions can change. An agency might modify carryover terms in a continuation award. Don't assume that because Year 1 had automatic carryover, Year 2 will too. Review each year's Notice of Award.
The Case for Updating the 90-Day Rule
The 90-day pre-award cost window is too short for many practical situations. Federal award processing times routinely exceed 90 days. An organization might receive an award notification in March with a July 1 start date and know it needs to begin hiring in January to have staff in place by July. That's 180 days, double the allowed window.
The "at your own risk" framing is also problematic. It disproportionately affects smaller organizations that can't afford to absorb costs if an award falls through. Large universities can weather a $50,000 loss on pre-award spending that doesn't get reimbursed. A community nonprofit cannot.
One option would be to extend the pre-award window to 180 days with a sliding scale of agency involvement: costs within 90 days would require notification only, costs between 90 and 180 days would require written approval. This would better reflect the reality of federal award timelines while maintaining appropriate oversight.
Related Guides
How Grantsights Checked This Guide
Grantsights checked this guide against current eCFR Uniform Guidance sections and NIH Grants Policy Statement materials on June 3, 2026. Period-of-performance mistakes often create unallowable costs even when the project work itself is useful.
| Source checked | What we verified | Recipient decision |
|---|---|---|
| 2 CFR 200.309 (opens in a new tab) | Extensions amend the period of performance when approved or allowed under the award. | Do not assume extra time until the rule or approval is clear. |
| 2 CFR 200.458 (opens in a new tab) | Pre-award costs must be necessary, allowable, and approved when required. | Get written approval before spending early. |
| 2 CFR 200.344 (opens in a new tab) | Closeout reports are due no later than 120 calendar days after the period ends unless the agency approves an extension. | Build closeout into the project calendar. |
| 2 CFR 200.308 (opens in a new tab) | Revision rules cover budget and program plan changes, including some extension situations. | Check prior-approval rules before moving time or money. |
| NIH no-cost extension policy (opens in a new tab) | NIH permits some final-budget-period extensions under defined conditions. | Agency-specific rules matter after the general rule. |
Decision checklist: confirm the authorized start date, document any pre-award costs, calendar the end date, request extensions before the award expires, stop charging after the end date, and submit closeout within the required window.
According to 2 CFR 200.309, an approved extension amends the period of performance to the new completion date. According to 2 CFR 200.458, pre-award costs are allowable only when they meet the same tests as post-award costs and are approved when required. According to 2 CFR 200.344, closeout reports are due within 120 calendar days after the period ends unless extended by the federal agency. According to 2 CFR 200.308, some budget and program plan revisions require prior approval.
Our analysis: the safest period-of-performance control is a three-date rule: planned start, authorized start, and chargeable start. Those dates are often not the same. A grant team should make staff code time and invoices by the chargeable start date, not by the project manager's preferred work date. For live federal funding searches, use the Grantsights grant database. For help building closeout controls, see Grantsights pricing.
What official sources miss
Based on our analysis of 2 CFR 200.309, 200.458, 200.308, and 200.344, the winner pattern is calendar control before cost review. According to 2 CFR 200.344, closeout reports are due no later than 120 calendar days after the period ends unless the agency approves an extension. According to 2 CFR 200.458, pre-award costs must meet allowability standards and approval rules. According to NIH policy, some no-cost extensions apply only under defined agency conditions.
Bad fit: do not rely on a no-cost extension to fix spending that happened outside the authorized period. For example, one city project with a June 30 end date should stop charging staff time on July 1 unless an approved extension or agency rule already changed the period of performance.
Sources
- 2 CFR 200.309, eCFR (current text) (opens in a new tab)
- 2 CFR 200.458, Pre-Award Costs (opens in a new tab)
- OMB Office of Federal Financial Management (opens in a new tab)
- NIH Grants Policy Statement, Section 8.1.2, Changes in Project Period
- NSF Proposal and Award Policies and Procedures Guide (PAPPG), Chapter VII
Frequently Asked Questions
What is the 90-day pre-award cost rule?
Under 2 CFR 200.458, pre-award costs must be necessary, allowable, and approved when required. Do not rely on a universal 90-day automatic authority. The federal agency and award terms determine whether pre-award costs are permitted, the timing, and the approval route; costs incurred before an award remain at the recipient's risk.
How do you request a no-cost extension?
Most federal awards allow the grantee's authorized organizational representative to approve a one-time, no-cost extension of up to 12 months without prior agency approval. This is called a one-time NCE or grantee-approved NCE. You must notify the agency in writing at least 10 days before the original end date (check your specific agency's requirements, as some require more notice). Second and subsequent NCEs require written prior approval from the federal awarding agency, and you must submit a justification explaining why additional time is needed and what work remains. Don't request an NCE just to spend down remaining funds.
What is the difference between obligation and expenditure?
An obligation is a binding commitment to pay for goods, services, or other costs. It occurs when you enter into a contract, issue a purchase order, or incur a salary obligation for work performed. An expenditure (or disbursement) is the actual payment of money. The distinction matters because obligations must be incurred within the period of performance, but expenditures (payments) for those obligations can occur after the period ends during the liquidation period. For example, you can order equipment on the last day of the period of performance (obligation), and pay the invoice 30 days later during the liquidation period (expenditure).
What happens to unspent funds at the end of a budget period?
This depends on whether your award has automatic or restricted carryover. With automatic carryover, unspent funds from one budget period automatically carry forward to the next budget period without agency approval. Most NIH grants have automatic carryover. With restricted carryover, you must request and receive prior approval to carry unspent funds forward. Department of Education grants typically have restricted carryover. If carryover isn't approved or isn't applicable, unspent funds may need to be returned. Your Notice of Award specifies which carryover provisions apply to your award.
Can you charge costs after the period of performance ends?
You cannot incur new obligations after the period of performance ends. However, you can pay for (liquidate) obligations that were properly incurred before the end date. The liquidation period is typically 120 days after the period of performance ends, which aligns with the closeout reporting deadline. For example, if your period of performance ends June 30 and you have an outstanding invoice for supplies ordered June 15, you can pay that invoice through October 28 (120 days later). But you can't place a new order on July 1, even if funds remain in the budget.
Last updated October 12, 2026. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
2 CFR 200.1 Definitions: MTDC, Equipment, Thresholds
2 CFR 200.1 defines Uniform Guidance terms: MTDC counts the first $50,000 of each subaward, equipment starts at $10,000, micro-purchases run to $15,000.
2 CFR 200.404 Reasonable Costs: 5-Factor Test
Use the 5-factor 2 CFR 200.404 reasonable costs test, document price and policy evidence, and stop a federal grant charge when one factor is unresolved.
Conflict of Interest in Federal Grants: 2 CFR 200.112
Conflict of interest grants guide: disclose $5,000+ PHS interests, 2 CFR 200.112 conflicts, procurement COI, plans, and agency reporting.
Cost Allocation Plan for Grants: 2 CFR 200 Guide
A cost allocation plan distributes shared costs across 2+ funding sources using 5 approved methods. Step-by-step guide with examples.
Grant Cost Sharing & Matching Requirements Guide
Many federal grants set a fixed match, such as 20% or 25%. Learn in-kind valuation, documentation rules, and 7 common matching pitfalls under 2 CFR 200.
Debarment & Suspension in Federal Grants Guide
Federal debarment and suspension under 2 CFR 180: SAM.gov exclusions, the $25,000 covered-contract rule, 30-day response, scope, and reinstatement.