2 CFR 200.344 Closeout Checklist: The 120-Day Rule

Updated 21 official sources

Quick Answer: Under 2 CFR 200.344, a recipient has 120 calendar days after the period of performance ends to submit every required final report and liquidate all obligations, unless the agency approves an extension.

Full answer and how we checked it

A subrecipient's baseline deadline to its pass-through entity is 90 days. NIH treats final reports as overdue on day 121, and PMS rejects NIH drawdown requests after day 120. If you're running a federal award that ends within 6 months, start this checklist now.

Who this is for: grants managers, post-award administrators, principal investigators, and financial officers responsible for closing out federal grants and cooperative agreements, at nonprofits, local governments, tribes, universities, and small businesses. If you've got an award ending in the next 6 months, start using this grant closeout checklist now.

Data note: Regulatory thresholds and requirements reflect the 2024 Uniform Guidance revision (effective October 1, 2024) per 2 CFR Part 200, checked against the eCFR text current as of October 15, 2026. Verify current requirements at ecfr.gov (opens in a new tab).

In this guide

Free post-award templates

Drawdown reconciliation log (Excel)

It tracks each draw against expenses paid, with cumulative totals, cash on hand and the award balance left (2 CFR 200.305(b)).

Download the drawdown log (Excel)

Want the other three too? Personnel activity (effort) record, Budget change prior-approval check, Indirect cost (MTDC) calculator.

Free. Built from the 2024 Uniform Guidance (2 CFR 200); your award terms and your own policies still come first. We'll also tell you once if we release a fuller post-award pack.

Grant closeout is the part of the federal grants lifecycle that nobody wants to think about until it's too late. By the time the period of performance ends, the project team has usually moved on to new work, and the administrative details of wrapping up the old grant fall to whoever happens to be available. That's how closeout problems start.

Organizations that handle closeout well start early. The common failure is discovering 30 days before the deadline that the accounts haven't been reconciled, subrecipients haven't sent final invoices, and nobody has decided what to do with the $47,000 mass spectrometer in the basement.

October 2026 Source Review by Grantsights

Grantsights checked this checklist against the current text of 2 CFR 200.344 (opens in a new tab), 200.345 (opens in a new tab), 200.346 (opens in a new tab), and 200.472 (opens in a new tab), the April 22, 2024 Federal Register notice (opens in a new tab) that revised them, the PMS grant closeout process (opens in a new tab), NIH Grants Policy Statement section 8.6 (opens in a new tab), and the NSF Grant General Conditions dated May 29, 2026 (opens in a new tab). We compared the pre-2024 and current text of 200.344 line by line, which is where the changes listed below come from.

Per 2 CFR 200.344(b), all financial, performance, and other required reports are due within 120 calendar days. Per 2 CFR 200.345(a), closeout doesn't end federal rights to disallow costs and recover funds. According to Grants.gov's post-award reporting forms page (opens in a new tab), the SF-425 remains the standard Federal Financial Report. According to the PMS closeout page, PMS flags payment requests on grants more than 90 and/or 120 days past their end date that still carry balances and holds them for agency review.

A closeout checklist only works when it joins finance, program, property, subrecipient, and invention tasks. An award can have a perfect final narrative and still miss day 120 because the final drawdown, equipment record, or subrecipient invoice is unresolved.

Decision checklist:

Checklist itemEvidence to attach
Final financial reportSF-425 (or the agency's equivalent, such as NSF's final ACM$ payment request), ledger tie-out, and drawdown history.
Final performance reportOutcome narrative and required attachments.
Property dispositionInventory, fair market value, and agency instructions.
Post-closeout fileRecord retention date and unresolved issue log.

What Grantsights Analysis of USAspending Shows

Grantsights analysis of USAspending.gov (opens in a new tab) award records for EPA Brownfields cooperative agreements (Assistance Listing 66.818), pulled October 17, 2026, looked at the 102 agreements that started on or after October 1, 2020 and listed an end date between October 1, 2024 and September 30, 2025. The method: we pulled every 66.818 award with activity since fiscal year 2021 from the USAspending search API and compared each award's total obligation with its reported total outlays.

FindingAgreementsShare of 102
Ended on September 30, 2025 (120-day deadline: January 28, 2026)8684%
Outlays equal obligations more than a year after the end date4544%
Obligations still more than 1% above outlays, $2.49 million in total3635%
Smaller gaps (under 1% or under $1,000)2121%

Two things follow. First, awards that end on September 30 put the whole 120-day window through the November and December holidays, so a January 28 deadline is tighter than it looks. Second, the federal side of closeout is slow: USAspending reflects what agencies report, so an unreported extension or a deobligation the agency hasn't processed can explain a gap, but more than a third of these agreements still showed open balances a year or more after their end dates. Don't treat silence from the agency as a sign the award is closed.

For example, Milwaukee received a $500,000 EPA Brownfields cleanup cooperative agreement whose period of performance ended December 31, 2024, so its 120-day deadline fell on April 30, 2025. Its USAspending.gov award record (opens in a new tab) now shows $500,000 obligated and $500,000 in outlays, which is what a fully liquidated award looks like.

What Official Sources Don't Tell You

Official sources describe the deadline, but they don't tell you which document should be prepared first. The practical gap is dependency order: final reports are often blocked by cost adjustments and subrecipient closeout, not by writing the final narrative. Use the pricing workflow if you need tracked federal closeout deadlines across multiple awards.


For the awards you already manage

Yearly plan

Grantsights Pro

$199a year

About $16.58 a month, or $24 month to month

Every award's report due dates and tasks in one place, with reminders before each date.

  • Each award's report due date, amount and next step
  • Task reminders 30, 14 and 3 days before each date, and a calendar feed
  • Up to 3 people on one plan

The closeout requirements live in 2 CFR 200.344 (opens in a new tab). The key points:

  • A recipient must submit all required reports within 120 calendar days after the end of the period of performance; a subrecipient submits to its pass-through entity within 90 calendar days, unless an earlier date is agreed (200.344(b)).
  • The recipient must liquidate all obligations within the same 120 days, and a subrecipient within 90 days (200.344(c)). The agency or pass-through entity may approve extensions for either when justified.
  • You must promptly refund any unobligated funds you were paid and aren't authorized to keep (200.344(e)).
  • You must account for property bought with federal funds under 200.310 through 200.316 and 200.330 (200.344(g)).
  • The federal agency must "make every effort" to complete all closeout actions no later than one year after the end of the period of performance (200.344(h)).
  • If you don't comply, including not submitting final reports, the agency must report the material failure in SAM.gov through CPARS (200.344(i)).
  • Closeout doesn't affect the federal agency's right to disallow costs or recover funds later (200.345).

What Changed in the 2024 Revision

The 2024 revision, published April 22, 2024 and effective October 1, 2024, kept the 120-day and 90-day deadlines. According to OMB's response to comments in the Federal Register notice, it considered and rejected requests for a longer liquidation period. Grantsights compared the prior and current text of 200.344 and 200.472; these are the changes that matter at closeout:

TopicBefore October 1, 2024Current rule
No final indirect cost rate yetNot addressed in 200.344File the final financial report on time anyway, then a revised one when all rates are final (200.344(b))
Closing with a provisional rateNot addressedAgency and recipient may mutually agree to close using the current or most recently negotiated rate; the recipient isn't required to agree (200.344(h))
Administrative closeout costsNot listed as allowableAllowable until the final report due date, liquidated by then, and charged to the final budget period (200.472(b))
Noncompliance reportingFAPIIS, if reports were still missing after one yearSAM.gov through CPARS, for failure to comply with 200.344 (200.344(i))
Debt collectionDetailed procedures in 200.346Excess payments are a debt collected under 31 CFR part 901 (200.346)

The closeout-cost change is the one most organizations underestimate. Before October 2024, staff time spent preparing final reports after the end date generally had nowhere to go. Now it can be charged, but only through the final report due date, so build it into the final-period budget instead of discovering it on day 100.


Looking for your next grant?

About once a week, we email a short list of open grant calls with real deadlines from different funders. It lists open calls only.

No spam. Unsubscribe anytime.

The Complete Grant Closeout Checklist

Phase 1: Pre-Closeout Planning (90 Days Before End Date)

Start here. The PMS closeout guidance also starts its timeline 3 months before the end date, with final financial forecasts, a review of all project expenses, and a plan for final adjustments. Most closeout problems are preventable if you begin early enough.

Financial review:

  • Review the budget vs. actual spending for each cost category
  • Identify any remaining commitments or encumbrances
  • Determine if a no-cost extension is needed and justified (submit the request now, not at the last minute)
  • Review planned obligations and stop new commitments when the award, organizational policy, and project needs require it
  • Budget for administrative closeout costs (final report preparation, equipment disposition) that 200.472(b) allows through the final report due date
  • Check whether the award's funds cancel at the end of a federal fiscal year; NSF's GC-1 requires final ACM$ payment requests on canceling awards before ACM$ closes in September, regardless of the award end date
  • Notify the PI/project director about the approaching end date and spending freeze timeline

Subrecipient closeout:

  • Notify all subrecipients that the award is ending
  • Set a subrecipient invoice and reporting deadline that allows the pass-through entity to meet its own closeout deadline
  • Request final progress reports from all subrecipients
  • Verify that all subrecipient monitoring activities are current

Equipment and property:

  • Update the equipment inventory for all items purchased under the award
  • Determine the current fair market value and title of equipment that may need disposition
  • Contact the federal agency about equipment disposition if needed

Phase 2: Period of Performance Ends (Day 0)

On the last day of the period of performance:

  • No new project obligations can be incurred after this date (administrative closeout costs under 200.472(b) are the exception)
  • Ensure all planned expenditures have been obligated
  • Begin the 120-day liquidation and reporting period

Phase 3: Liquidation and Reporting (Days 1 through 120)

This is the critical window. Everything needs to happen within 120 days.

Financial closeout:

  • Pay all outstanding invoices for goods and services ordered before the end date
  • Process final salary allocations and adjustments
  • Collect and pay all subrecipient final invoices
  • Review all expenditures for allowability, allocability, and reasonableness
  • Reconcile total expenditures against total drawdowns (see the federal grant drawdown guide)
  • Make final adjustments to correct any mischarges or errors
  • Process the final drawdown or return excess funds before the payment system closes the account

Reporting:

  • Submit the final Federal Financial Report (SF-425), or the agency's equivalent
  • Submit the final progress/performance report
  • Submit the final invention statement (if required by the award)
  • Submit any other reports required by the award terms (property reports, cost share notifications, etc.)

Records:

  • Organize and archive all award records
  • Set the record retention calendar (3 years from submission of the final financial report)
  • Ensure electronic records are backed up and accessible
  • Note any pending audit findings or litigation that extend the retention period

The Closeout Timeline Visualized

The table below maps the 120-day rule and the 1-year agency target onto calendar milestones.

MilestoneWhenWhat Happens
Pre-closeout planningAbout 3 months before the end dateSpending review, subrecipient notices, NCE decision
No-cost extension requestAt least 10 calendar days before the end dateOne-time extension notice or prior approval request under 200.308
Period of performance endsDay 0No new project obligations after this date
Subrecipient reports and liquidation dueDay 90, or an earlier date set by the pass-through entityAll subrecipient support needed for the recipient closeout is received
Final financial adjustmentsBefore the final-report deadlineAll costs posted and reconciled
Final reports submitted, obligations liquidatedDay 120, unless an extension is approvedSF-425 or equivalent, progress report, invention report
NIH reports overdueDay 121NIH starts unilateral closeout steps
Agency closeout targetDay 0 to Day 365Federal agency makes every effort to complete closeout within one year after the period of performance ends
Record retention beginsDay of final financial report submission3-year clock starts

The Most Common Closeout Mistakes

Six problems account for most late or messy closeouts, and each one traces back to the 120-day clock.

1. Starting Too Late

This is the most common mistake. If you wait until the period of performance ends to begin closeout, you're already behind. Subrecipients need time to submit final invoices, and their own deadline (90 days unless you set an earlier date) eats into yours. Your accounts payable department needs time to process payments. Your grants accountant needs time to reconcile. The project director needs time to write the final report. None of that happens in 120 days if you don't start early.

2. Not Collecting Subrecipient Final Invoices

Subrecipients don't always prioritize your timeline. If you don't give them a firm deadline with enough lead time, you'll be chasing invoices on day 115 of your 120-day window. Build penalty clauses into your subaward agreements (like withholding a percentage of the final invoice until all reports are received) to encourage timely submission.

3. Ignoring Equipment Disposition

Equipment purchased with federal funds doesn't automatically become yours when the grant closes. If equipment has a current fair market value above $10,000 per unit, you must follow the disposition procedures in 200.313(e). That usually means compensating the agency for its share of the current value if you keep the item, or of the proceeds if you sell it, unless the agency gives other instructions or the award terms let you keep it outright.

4. Misunderstanding the Liquidation Period

The 120-day window after the period of performance is for liquidating obligations and submitting reports. It's not an extension of the project period. You can pay for things ordered before the end date, but you can't start new activities or make new purchases for the project. Treating the liquidation period as extra project time results in disallowed costs. The one carve-out is administrative closeout cost under 200.472(b).

5. Failing to Return Excess Funds Promptly

If your drawdowns exceed your final expenditures, you owe money back, and under 200.346 that excess is a federal debt. A balance left sitting in the account after the final report is a red flag for auditors. Calculate any excess immediately after your final reconciliation and return it through the appropriate payment system. For NIH awards, NOT-OD-21-102 says a revised final FFR showing a balance due to NIH should be filed no later than 60 days after the original due date, which is 180 days after the project end date.

6. Not Reconciling Cost Share

If your award required matching contributions, your closeout documentation must demonstrate that you met the match requirement for the full period of performance. This includes both cash match and in-kind contributions. If you're short on match, that's a finding. NSF, for one, requires a final cost share notification in Research.gov no later than 120 days after the award end date.


What the Closeout Process Doesn't Tell You

Four obligations outlast the 120-day deadline, and the regulations don't put them on one page.

Federal agencies are slow. Your obligation is to submit everything within 120 days. Under 2 CFR 200.344(h) (opens in a new tab), the agency must make every effort to complete closeout no later than one year after the end of the period of performance. That's a target, not a hard deadline, and the USAspending.gov data above shows open balances on more than a third of the sampled EPA agreements a year after they ended. You may receive questions or requests for additional documentation months after you've submitted your final reports.

Closeout doesn't end your liability. Section 200.345(a) (opens in a new tab) says closeout doesn't affect "the right of the Federal agency or pass-through entity to disallow costs and recover funds on the basis of a later audit or review." The same paragraph requires the agency to make those determinations and notify you within the record retention period (generally three years from your final financial report, longer if litigation, claims, or audit findings are open). This is why record retention matters.

Patent and invention obligations survive closeout. If your award included research activities, your obligations under the Bayh-Dole Act (invention disclosure, election of title, patent prosecution) continue after closeout. Make sure your technology transfer office is aware of all inventions made under the award.

Indirect cost adjustments can follow closeout. If your negotiated indirect cost rate for the final year isn't final when the 120 days run out, 200.344(b) still requires the final financial report on time, followed by a revised final report once all applicable rates are finalized. Section 200.345(a)(2) keeps your right to receive, and your duty to return, final rate adjustments after closeout, unless you and the agency agreed under 200.344(h) to close on the current or most recently negotiated rate. Check with your cognizant agency for indirect costs before you agree to that.


The No-Cost Extension Decision

If you're approaching the end of your period of performance with unspent funds and work still to complete, a no-cost extension (NCE) of up to 12 months may be appropriate. But it's not an automatic entitlement.

When an NCE makes sense:

  • The project objectives haven't been fully met and additional time will enable completion
  • Delays were beyond your control (supply chain, staffing, etc.)
  • There's a meaningful amount of work and funding remaining

When an NCE doesn't make sense:

  • You just want more time to spend down the budget on things not directly related to the project
  • The project objectives have been met but money is left over
  • You're using it to avoid returning funds

Under 2 CFR 200.308(g)(2) (opens in a new tab), a recipient can initiate a one-time extension of up to 12 months without prior approval only if the award's terms and conditions authorize it, and it must notify the agency in writing, with a justification and the revised end date, at least 10 calendar days before the period of performance ends. The same paragraph says a one-time extension "may not be exercised for the sole purpose of using unobligated balances." Prior approval is still required if the terms prohibit the extension, it needs more federal funds, or it changes the approved scope. Any further no-cost extension needs prior approval under 200.308(f)(10), and agencies may approve more than one.

On NCEs: Request them earlier rather than later. An NCE request submitted 6 months before the end date signals planning. One submitted 2 weeks before the end date leaves the agency little time to act, and if it isn't approved you'll be stuck with the original end date. At NSF, GC-1 says late project reports delay administrative actions, including no-cost extensions, and submitting the Project Outcomes Report signals that no further extension is expected.


Agency-Specific Closeout Requirements

All four agencies below use the same 120-day baseline from 2 CFR 200.344, but the systems and report names differ:

AgencyFinal financial reportFinal program reportWhere
NIHFinal FFR (SF-425)Final RPPR and Final Invention Statement (HHS 568)FFR in PMS; RPPR and invention statement in eRA Commons
NSFFinal payment request (no separate final financial report for ACM$ awards)Final annual project report and Project Outcomes ReportACM$ and Research.gov
EducationPer award termsFinal performance reportG6
USDA NIFAFinal financial reportFinal reportREEport for competitive awards

NIH: According to NIH's Grants Policy Statement section 8.6 (opens in a new tab), recipients must submit a final FFR, Final RPPR, and Final Invention Statement and Certification within 120 calendar days of the project period end date, and the reports become overdue on day 121. If they're still missing a year after the end date, NIH unilaterally closes the award and reports the failure in SAM.gov. The FFR goes through PMS, while the Final RPPR and Final Invention Statement go through the eRA Commons closeout feature (opens in a new tab); the invention statement is required even if the project produced no inventions. According to NIH notice NOT-OD-21-102 (opens in a new tab), PMS automatically rejects drawdown requests made more than 120 days after the period of performance end date, so the last NIH draw has to happen inside the window. Invention disclosures themselves are reported through iEdison.

NSF: According to NSF's reporting guidance (opens in a new tab), the final annual project report covers only the last funded year, and the Project Outcomes Report for the General Public is a summary of no more than 800 words that NSF posts publicly exactly as submitted; both are due in Research.gov within 120 days of the award end date. NSF's GC-1 requires final payment requests through ACM$ within 120 calendar days and treats those entries as the final financial data. For equipment, GC-1 vests title in the recipient unless NSF issues other disposition instructions within 120 days of the award end date. Patent and invention reporting goes through iEdison.

Department of Education: ED's grants management and payment system is now G6, its Grants Management System (opens in a new tab). Additional reporting requirements may apply for formula and discretionary grants, so check the grant award notification.

USDA: NIFA competitive awards report through REEport. Other USDA agencies set closeout reporting in their own award terms.

Always check your award terms for agency-specific instructions. The Uniform Guidance sets the floor, but your award terms may require additional steps.


Post-Closeout: What to Watch For

Even after you've submitted everything and the agency has acknowledged receipt, keep these items on your radar for at least 3 years:

Audit coverage. If your award is selected as a major program in a Single Audit, the auditors will test transactions from the award even after closeout. Section 200.345(a)(4) keeps subpart F audit requirements in force. Maintain your records and be prepared to produce documentation.

Agency questions. Federal program officers and grants management specialists may contact you with questions months or years after closeout. Having organized, accessible records makes these interactions routine rather than crises.

Rate adjustments. If your indirect cost rate for the award's final year is later finalized at a different amount, you may need to submit amended financial reports and adjust your final drawdown accordingly, unless the award was closed on an agreed rate under 200.344(h).

If the closeout issue involves shifting funds before the end date, check the federal grant budget revisions guide and the 2 CFR 200 Uniform Guidance guide before you move costs.

Subrecipient findings. If a subrecipient's Single Audit reveals findings related to your subaward after you've already closed out, you may still need to address those findings.


Sources

Frequently Asked Questions

How long do you have to close out a federal grant?

Under 2 CFR 200.344(b) and (c), a recipient must submit all financial, performance, and other required reports and liquidate all obligations no later than 120 calendar days after the period of performance ends. A subrecipient's baseline deadline to its pass-through entity is 90 calendar days, or an earlier date the two agree on. The agency or pass-through entity may approve an extension when it's justified, so ask before day 120 rather than after. NIH treats its final reports as overdue on day 121. The federal agency then has a target of one year after the end of the period of performance to finish its own closeout actions.

What happens to unspent grant funds at closeout?

Under 2 CFR 200.344(e), you must promptly refund any federal funds you were paid that you aren't authorized to keep. Reconcile total drawdowns against total allowable expenditures; if you drew more than you spent, return the excess through the payment system the agency uses (PMS for HHS awards, ACM$ for NSF). Funds the agency obligated but you never drew are deobligated by the agency after it receives your closeout reports. Under 2 CFR 200.346, any amount you were paid beyond what you're entitled to is a debt to the federal government, collected under the federal claims collection standards in 31 CFR part 901.

Do you still need to keep records after a grant closes out?

Yes. The record retention requirement under 200.334 is 3 years from the date you submit the final financial report, not 3 years from the end of the grant's period of performance. This distinction matters because your final report might be submitted several months after the period of performance ends, pushing the retention start date out. If there are unresolved audit findings, litigation, or claims, you must retain records until those matters are fully resolved, even if that extends beyond the standard 3-year period. Equipment records run 3 years from final disposition. See the records retention guide for details.

What do you do with equipment purchased with grant funds at closeout?

Equipment disposition depends on title, current fair market value, and the award terms. Under 2 CFR 200.313(e), recipient- or subrecipient-owned equipment with a current per-unit fair market value of $10,000 or less may be retained, sold, or otherwise disposed of with no further responsibility to the federal agency or pass-through entity. For equipment above $10,000, the agency is entitled to its percentage share of the current market value or sale proceeds, and you may be allowed to keep $1,000 of sale proceeds for selling costs. NSF's grant conditions vest title in the recipient unless NSF issues other instructions within 120 days of the award end date. Update the property records either way.

Can costs be charged to a grant after the period of performance ends?

Mostly no. You can't incur new project obligations after the end date, but you can pay obligations properly incurred before it during the 120-day liquidation period. For example, if you ordered supplies before the end date and the invoice arrives after, you can pay that invoice. The 2024 Uniform Guidance added one exception: under 2 CFR 200.472(b), administrative closeout costs, such as salaries of staff preparing final reports, equipment disposition costs, and related indirect costs, may be incurred until the final report due date. They must be liquidated before that date and charged to the final budget period unless the agency says otherwise.

What changed in grant closeout under the 2024 Uniform Guidance?

The revision effective October 1, 2024 kept the 120-day and 90-day deadlines. It added three practical changes: you must file a final financial report on time even without a final indirect cost rate, then file a revised one when the rate is finalized (200.344(b)); the agency and recipient may mutually agree to close using the current or most recently negotiated rate (200.344(h)); and administrative closeout costs are now allowable until the final report due date (200.472(b)). Material failure to complete closeout is now reported in SAM.gov through CPARS (200.344(i)).

Does NSF require an SF-425 at closeout?

No, not for awards paid through ACM$. NSF's Grant General Conditions (GC-1) say the recipient must submit final payment requests through ACM$ no later than 120 calendar days after the award end date, and NSF uses those entries as the final financial data with no additional final financial report. The PI still owes a final annual project report and a Project Outcomes Report for the General Public in Research.gov within the same 120 days.

Last updated October 17, 2026. Corrected October 17, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.