EV Charging Grants 2026: What Towns and Nonprofits Can Get
Updated 14 official sources
Quick Answer: Grants for EV charging stations for nonprofits, towns and other organizations mostly come from government and utilities, not foundations.
Full answer and how we checked it
Grantsights analysis of 990-PF grants pulled November 5, 2026 found 26 foundations that made 42 grants worth $5,412,012 naming EV charging, chargers or vehicle electrification, but only 10 of those grants, from 8 foundations and worth $220,932, paid to install chargers at a nonprofit's or town's own site. Their median was $14,868. The federal 30C tax credit, which tax-exempt groups could take as a cash payment, ended for chargers placed in service after June 30, 2026.
This guide is for towns and counties, public libraries, parks, churches, community health centers, housing nonprofits and other organizations that want public or fleet chargers at their own buildings. Homeowners should know the individual version of that credit ended on the same date, but this page is written for organizations. Companies that build and sell charging as a business are outside its scope too.
Data note: The counts come from a Grantsights search of 990-PF grants, pulled November 5, 2026, across all causes, for recipients or purposes that name EV or vehicle charging, chargers, charging stations, or vehicle and fleet electrification. Grantsights sorted all 42 grants by hand. 10 paid for chargers at a nonprofit's or town's own site, 2 paid for siting or feasibility studies, 2 bought electric vehicles for nonprofits and 1 funded affordable public charging models. The rest weren't site projects: 19 went to policy and advocacy groups, 3 to one EV charging apprenticeship program, and 5 were charging stations for laptops and tablets that only matched on the word. Policy and apprenticeship grants make up 84% of the dollars, so the total overstates what's available for a charger. The state table further down comes from an earlier Grantsights pull of environment giving, dated October 29, 2026.
In this guide
- How Grants for EV Charging Stations Actually Work in 2026
- The 30C Credit and Elective Pay: What Ended on June 30, 2026
- NEVI and CFI: Federal Charger Money Runs Through States and Local Governments
- What the IRS and FHWA Don't Tell You About Charger Funding
- Who Paid for Chargers: What 990-PF Filings Show
- 6 Kinds of Charging Projects Foundations Paid For
- Utility Rebates and State Programs: Where Most Charger Money Comes From Now
- What an EV Charger Project Costs and Which Parts Funders Pay For
- Why the Environment List for EV Charging Grants
- How to Write an EV Charging Station Request
- Common Mistakes in EV Charging Grant Requests
- Related Guides for EV Charging Funding
- FAQ: Common Questions
- Sources
Find the foundations most likely to fund your organization
Type your organization's name. We'll show the foundations that fund groups like yours, from their own IRS filings, with the reasons for each. Free, no sign-up. See a sample
Foundations that fund this work
16,860 private foundations gave to land trusts, conservancies, nature centers and environmental groups
From their own IRS Form 990-PF filings (tax years 2020 to 2025). Pick your state to see who gave there, with one foundation in full. About the list
Across the US, these foundations gave 91,290 grants totaling $6,638,442,795.
One payment
Environment and conservation funder list
$39once
All 16,860 foundations, state by state.
- Each grant's amount, recipient, year and purpose
- Whether its filing says it takes requests
- How to apply, and a CSV download
Need every cause, with weekly filing alerts? Grantsights Pro is $199 a year, and a list you buy now counts toward it.
Foundation data from the foundations' own public tax returns (IRS Form 990-PF), not government grants. We never promise funding.
Before you buy: payment, invoices and questions
- Paid by card through Stripe, with an emailed receipt (refund details in our terms).
- For comparison, full foundation databases are subscriptions: Candid Premium is $1,199 a year (nonprofit price, billed annually) and Instrumentl starts at $299 a month (billed annually). This list is $39, once.
- Questions before you buy? Email Erik Jia, who runs Grantsights, at team@grantsights.com.
EV charging funding source review, Grantsights, November 6, 2026: Grantsights checked the IRS Alternative Fuel Vehicle Refueling Property Credit page (opens in a new tab), the IRS elective pay questions and answers (opens in a new tab), 26 U.S.C. 30C (opens in a new tab), Public Law 119-21 (opens in a new tab), FHWA's NEVI page (opens in a new tab) and Charging and Fueling Infrastructure page (opens in a new tab), and the Alternative Fuels Data Center (opens in a new tab) against the 42 foundation grants. Where official sources stop: none of them tells a library or a church what its utility will pay toward a make-ready upgrade, what a fair installation quote looks like, or which local funder will chip in. You get those answers from your utility, your electrician and each funder's past gifts.
How Grants for EV Charging Stations Actually Work in 2026
Just 10 grants in the November 5, 2026 pull paid a foundation's money into a charger at a nonprofit's or town's own site, and together they came to $220,932. Charging is infrastructure, and infrastructure money in the U.S. mostly flows through federal formula programs, state agencies and electric utilities. Several of those sources changed in 2025 and 2026, so here's where each one stands.
| Money source | Who can use it | Status as of November 6, 2026 |
|---|---|---|
| 30C refueling property credit, through elective pay | Tax-exempt and government entities in eligible census tracts | Ended for chargers placed in service after June 30, 2026 |
| NEVI Formula Program | States, which may contract with private companies | Running under August 11, 2025 interim final guidance |
| Charging and Fueling Infrastructure grants | States, local governments, tribes, some public authorities | No new notice since Round 2 closed September 11, 2024 |
| Utility rebates and make-ready programs | Utility customers, rules set utility by utility | Varies; look up your utility |
| State incentive programs | Set by each state | Varies; look up your state |
| Foundation grants for a site install | Mostly nonprofits and small towns | The 10 grants counted here, median $14,868 |
Grantsights' view: treat a foundation as the last piece of a charger budget, not the first. Line up the utility rebate and any state money, then ask a local funder for the gap, the way the Walpole Foundation helped its own town. If solar panels are part of the same project, grants for renewable energy covers those funders.
Get grant deadline alerts by email
About once a week, we email a short list of open grant calls with real deadlines from different funders. It isn't limited to the programs in this guide.
No spam. Unsubscribe anytime.
The 30C Credit and Elective Pay: What Ended on June 30, 2026
According to IRS guidance on the Alternative Fuel Vehicle Refueling Property Credit (opens in a new tab), a business or organization that placed qualified property in service from January 1, 2023 to June 30, 2026 can claim 6% of its cost, up to $100,000 per item, where each charging port counts as an item. Groups that meet prevailing wage and apprenticeship requirements qualify for 30% with the same cap. The page says eligible tax-exempt and government entities can claim the credit through elective pay, which turns the credit into a payment from the IRS for groups that owe no income tax.
The end date comes from Public Law 119-21 (opens in a new tab), signed July 4, 2025. Section 70504 changed the termination date in 30C(i) from December 31, 2032 to June 30, 2026. Be careful with older copies of the law: the 2024 edition of 26 U.S.C. 30C (opens in a new tab) still shows the 2032 date, because it was published before that change. The same 2025 law, in section 70503, ended the commercial clean vehicle credit for vehicles acquired after September 30, 2025, which matters to a nonprofit pricing an electric van, per the text of section 70503.
Location rules still apply to chargers placed in service before the cutoff. The statute requires the property to be in an eligible census tract, meaning a low-income community tract under section 45D(e) or a tract that isn't urban. Per the IRS credit page, property placed in service after January 1, 2025 is checked against the 2020 census tract list.
If your group put a charger in service in the first half of 2026, there's still money on the table. According to the IRS elective pay questions and answers (opens in a new tab), 30C is one of 12 credits eligible for elective pay. The IRS elective pay page (opens in a new tab) says an entity must register before filing and put the registration number on its return, and a tax-exempt group makes the election on Form 990-T. Talk to your tax preparer before your return for that year is due.
NEVI and CFI: Federal Charger Money Runs Through States and Local Governments
The National Electric Vehicle Infrastructure (NEVI) Formula Program provides $5 billion to states, according to FHWA's August 11, 2025 interim final guidance (opens in a new tab), which replaced all earlier NEVI guidance. The federal share is 80%, and private and state money can cover the rest. States can contract with private companies to buy, install, run and maintain chargers, and the company can pay the non-federal share. Stations must sit along designated Alternative Fuel Corridors until a state certifies, and FHWA agrees, that its corridors are fully built out. After that, money can go to any public road or publicly accessible location. FHWA's NEVI page (opens in a new tab) was last updated February 5, 2026.
What that means locally: a library, park or town hall doesn't apply to FHWA for NEVI money. If your site sits near a corridor, the realistic role is host. You offer a location to the company your state picks, or you respond when your state transportation department asks for sites. Federal grants for local governments explains how state pass-through programs reach towns.
The Charging and Fueling Infrastructure (CFI) program is the discretionary side. According to FHWA's CFI page (opens in a new tab), the 2021 infrastructure law provides $2.5 billion over 5 years for 2 kinds of grants: community charging and fueling grants, and corridor grants. Eligible applicants are states and their political subdivisions, metropolitan planning organizations, local governments, special purpose districts or public authorities with a transportation function, tribes, territories, entities they own, and groups of these. Nonprofits aren't on the list, so they join as partners. The page says no date for a future notice is available. The Round 2 notice on Grants.gov (opens in a new tab) closed September 11, 2024. As of November 6, 2026, Grantsights found no newer CFI notice.
School districts have one more federal program to watch. According to EPA, whose Clean School Bus page (opens in a new tab) was last updated October 26, 2026, a request for information closed April 6, 2026, and the agency will share details on a new grant round later in 2026. No round is open as of November 6, 2026.
What the IRS and FHWA Don't Tell You About Charger Funding
The official pages leave 5 points unanswered, and each one trips up local groups.
- "Placed in service" is the date that counts. A charger bought in May but energized in August 2026 missed the 30C window. Groups often underestimate how long utility interconnection takes, and that delay can now cost the whole credit.
- Elective pay needs registration first. The IRS requires pre-filing registration before the return. A common mistake is waiting until the return is due to start it.
- NEVI rewards sites, not applicants. Because states can hand the work to private companies, a town's best move is offering a good location: parking, power capacity, restrooms and hours. Ask your state program office how it picks hosts.
- CFI has no clock. With no notice date, a project that depends on CFI money has no timeline. Don't hold a ready project for it.
- The make-ready cost is the real bill. Trenching, panels and transformer work often cost more than the charger. None of the federal pages price that for you, and your utility's program is usually where that cost gets shared.
Grantsights' honest take: for a small organization in late 2026, the federal tax and grant routes mostly closed or moved to states. Your utility and your state are now the first calls.
Who Paid for Chargers: What 990-PF Filings Show
The 10 site-install grants totaled $220,932 from 8 foundations, with a median of $14,868, in the Grantsights pull of November 5, 2026. These come from private foundations' annual returns, which the IRS describes on its Form 990-PF page (opens in a new tab) as the place they report charitable distributions and activities.
| Funder | Site owner | State | Amount | Filed purpose | Year filed |
|---|---|---|---|---|---|
| B Quest | San Ysidro Health | CA | $81,363 | EV charger installation | 2024 |
| The Ahmanson Foundation | The Campbell Center | CA | $37,700 | An electric vehicle and a charging station | 2022 |
| Scott Foundation | Central Westmoreland Foundation | PA | $32,087 | LED lighting, EV chargers and tools | 2024 |
| The Walpole Foundation | Town of Walpole | NH | $29,681 | Brownfield project with EV chargers and trenching | 2023 |
| B Quest | San Ysidro Health | CA | $24,736 | EV charger installation | 2023 |
| A. Lindsay & Olive B. O'Connor Foundation | Town of Andes | NY | $2,865 | Charging station | 2023 |
| MidWestOne Bank Foundation | Franconia Sculpture Park | MN | $2,500 | Purchase, installation and design of an EV charging station | 2023 |
| MidWestOne Bank Foundation | Franconia Sculpture Park | MN | $2,500 | Same purpose, second grant | 2024 |
| AbbyBank Foundation | COTS | WI | $2,500 | E-bike charging station | 2025 |
One funder shapes the top of this list. B Quest's two grants to San Ysidro Health total $106,099, or 48% of all site-install dollars in the pull. Strip those out and the typical site grant is a few thousand dollars from a local or bank-affiliated foundation, which buys part of a Level 2 charger, not a fast-charging hub.
6 Kinds of Charging Projects Foundations Paid For
Grantsights checked each of these 6 project types against the recipient's work and the filed purpose, all from the November 5, 2026 pull.
- A health center's parking lot. For example, San Ysidro Health received $81,363 from B Quest in 2024 and $24,736 in 2023 for EV charger installation.
- A town project with chargers built in. One town in New Hampshire, Walpole, received $29,681 from the Walpole Foundation in 2023 for a brownfield project that included EV chargers and trenching. The O'Connor Foundation's $2,865 to the Town of Andes, New York in 2023 paid for a charging station.
- A charger bundled with a vehicle or other upgrades. The Ahmanson Foundation gave The Campbell Center $37,700 in 2022 for an electric vehicle and a charging station, and the Scott Foundation gave the Central Westmoreland Foundation in Pennsylvania $32,087 in 2024 for LED lighting, EV chargers and tools.
- A visitor site. MidWestOne Bank Foundation gave Franconia Sculpture Park in Minnesota $2,500 in 2023 and again in 2024 to buy, design and install an EV charging station. AbbyBank Foundation gave COTS in Wisconsin $2,500 in 2025 for an e-bike charging station.
- A study before the build. The Kresge Foundation gave Green the Church $100,000 in 2024 for studies at 8 churches interested in becoming clean energy and EV charging hubs. The Claude Worthington Benedum Foundation gave the Region 1 Planning & Development Council $30,000 in 2023 for a charger siting study across 11 counties in southern West Virginia.
- The vehicle itself. The Del E. Webb Foundation gave Mobile Meals of Southern Arizona $72,000 in 2024 for an electric meal delivery van, and the Florence M. Muller Foundation gave Wayne Community Action Program in New York $32,000 in 2023 for an electric vehicle for a work program. Grants for nonprofit vehicles covers the funders who buy vans and trucks.
One more grant points at public charging access rather than a single site: the Rivian Foundation gave GRID Alternatives $300,000 in 2024 to develop models for more affordable public EV charging. Each of the purposes above names the place or the people served. That's the pattern that got these grants written down.
Utility Rebates and State Programs: Where Most Charger Money Comes From Now
The Alternative Fuels Data Center, run by the U.S. Department of Energy, lists 235 state laws and incentives for California, 106 for Washington, 79 for Minnesota, 76 for Wisconsin, 73 for New York and 56 for Pennsylvania on its state laws and incentives page (opens in a new tab), as of November 6, 2026. Those counts cover all alternative fuels and vehicles, not just charging, and many entries are rules rather than money, so open your state's list and filter for electricity and infrastructure.
Utilities are often the bigger source for a single site, and the data center has 2 pages that help you find them. The data center's utility incentives page (opens in a new tab) sorts programs by residential and non-residential customers and by topic, including infrastructure, and points to a U-Finder tool for finding a utility partner by state or ZIP code. Call your utility's business or public sector team before you get electrician quotes: make-ready programs often require pre-approval, and a project started first may not qualify.
Its federal entry for the Alternative Fuel Infrastructure Tax Credit (opens in a new tab) now reads "Expired: 06/30/2026," which matches the IRS page and the 2025 law.
What an EV Charger Project Costs and Which Parts Funders Pay For
This table is illustrative, not data. Costs swing widely with how far the charger sits from your electrical panel, whether you need new service, and the charger type, so get 2 or more written quotes and your utility's estimate, and plan for at least 5 years of upkeep.
| Cost item | What it includes | Who usually pays |
|---|---|---|
| Site assessment and design | Load study, layout, permits | Utility program, state program or a small foundation grant |
| Make-ready work | Trenching, conduit, panels, transformer upgrades | Often shared with the utility |
| Charger hardware | Level 2 or DC fast charging units | Rebates, state money, foundation gap funding |
| Installation labor | Electrician, inspection | Project budget; prevailing wage rules mattered for 30C |
| Networking and software | Payment, access control, usage data | Operating budget |
| Maintenance and repairs | Service plan, replacement parts | Operating budget; funders rarely pay |
| Signs and accessibility | Parking signs, accessible spaces | Project budget |
Groups underestimate the years after installation. A charger with no budget for its network plan or repairs ends up out of service, which is a red flag for any funder who sees it. Decide up front whether you'll charge drivers a fee to cover those costs.
Why the Environment List for EV Charging Grants
The 42 matched grants spread across causes, but charging projects that carried a cause tag sat mostly under environment, so Grantsights points charger seekers to the environment list. That list also holds the clean energy and climate funders most likely to add a charger to a broader building or energy project. The free preview on the Grantsights environment funder list shows environment funders in your state broadly, not funders picked for chargers.
| State | Environment grants filed | Environment funders | Funders taking requests | Typical environment gift |
|---|---|---|---|---|
| California | 10,552 | 3,139 | 729 | $10,000 |
| New York | 11,217 | 3,587 | 761 | $5,000 |
| Pennsylvania | 2,835 | 816 | 308 | $5,000 |
| Minnesota | 1,552 | 462 | 141 | $10,000 |
| Wisconsin | 1,728 | 566 | 205 | $5,000 |
| New Hampshire | 867 | 329 | 117 | $3,500 |
Nothing in this table is limited to chargers: each figure covers a state's whole environment giving, from Grantsights analysis of 990-PF filings pulled October 29, 2026. The statewide medians of $3,500 to $10,000 line up with the gap-filling role foundations played in the charger grants above. A health center or a church should also check the funders of its own cause, since a charger there usually rides on a broader building or health project. If you go with environment funders, the environment funder list covers every state, and you have 30 days to ask for a refund if it's the wrong fit.
How to Write an EV Charging Station Request
The site-install purposes in this pull were short, most under 10 words, so the filing doesn't show the full proposal. These 5 steps make a charger request read as a community project.
- Say who will plug in. Patients, staff, park visitors, a meal delivery fleet. Count them.
- Show the other money first. List the utility rebate, any state award and your own share, then ask the funder for the gap.
- Tie it to a bigger project when you can. The Walpole and Scott Foundation grants paired chargers with site work and lighting. Bundled requests read as part of a plan.
- Budget years 2 through 5. Network fees and maintenance belong in the plan, and grants for nonprofit operating costs covers who pays ongoing costs.
- Size it to the funder. How to read a 990-PF shows how to check what a funder gave groups like yours. A bank foundation that gives $2,500 won't fund a $60,000 installation.
Common Mistakes in EV Charging Grant Requests
These 5 mistakes sink requests near the $14,868 median.
- Assuming the federal credit still applies. Chargers placed in service after June 30, 2026 don't qualify for 30C, so a budget that counts on it now has a hole.
- Applying to NEVI or CFI directly as a nonprofit. Neither program takes nonprofit applicants. Partner with your town or your state's chosen operator.
- Getting quotes before calling the utility. Make-ready programs can require pre-approval.
- Confusing device charging with vehicle charging. 5 of the 42 grants in this pull were laptop and tablet charging stations. Say "electric vehicle" plainly.
- Mixing up advocacy funders with project funders. 19 of the 42 grants went to policy groups. Those funders back campaigns, not a parking lot charger.
Related Guides for EV Charging Funding
Most of the $5,412,012 matched in this pull went to policy and training, so groups usually find charger money as part of an energy or building project. Solar and storage often come first, and grants for renewable energy and the clean energy grants guide cover those funders. Nonprofits comparing clean energy programs can also read the best grants for clean energy nonprofits in 2026, and groups buying an electric van can compare vehicle funders in grants for nonprofit vehicles.
Towns and counties should read federal grants for local governments and grants for municipalities, and park districts can see grants for parks and recreation departments. Congregations thinking about a charging hub like the Green the Church studies can start with grants for churches. Open federal and state notices for towns and nonprofits are listed in the Grantsights grant database.
FAQ: Common Questions
Are there grants for EV charging stations for nonprofits and towns? A few: 10 foundation grants worth $220,932 paid for site installs in the November 5, 2026 pull.
Can a nonprofit still use the 30C tax credit for EV chargers? Only for chargers placed in service by June 30, 2026, claimed through elective pay.
How do NEVI grants work for local organizations? States receive the money and pick sites and operators; local groups take part as hosts or partners.
Is the Charging and Fueling Infrastructure grant program open in 2026? No. No new notice has been posted since Round 2 closed September 11, 2024.
How much do foundations give for an EV charger? The median site-install grant was $14,868.
Where else can an organization find money for chargers? Your utility and your state, both searchable on the Alternative Fuels Data Center.
Sources
These 13 sources, checked November 6, 2026, back the federal, tax and filing claims above.
- IRS: Alternative Fuel Vehicle Refueling Property Credit (last reviewed May 26, 2026) (opens in a new tab)
- IRS: Elective pay and transferability (opens in a new tab)
- IRS: Elective pay frequently asked questions (opens in a new tab)
- govinfo.gov: 26 U.S.C. 30C (U.S. Code, 2024 edition, before the 2025 change) (opens in a new tab)
- govinfo.gov: Public Law 119-21, sections 70503 and 70504 (opens in a new tab)
- FHWA: National Electric Vehicle Infrastructure (NEVI) Program (opens in a new tab)
- FHWA: NEVI Formula Program interim final guidance, August 11, 2025 (opens in a new tab)
- FHWA: Charging and Fueling Infrastructure Discretionary Grant Program (opens in a new tab)
- Grants.gov: CFI Discretionary Grant Program Round 2 (693JJ324NF00017) (opens in a new tab)
- Alternative Fuels Data Center: State laws and incentives (opens in a new tab), utility incentives (opens in a new tab) and Alternative Fuel Infrastructure Tax Credit entry (opens in a new tab)
- EPA: Clean School Bus Program (opens in a new tab)
- IRS: About Form 990-PF (opens in a new tab)
- Grantsights 990-PF EV charging grant records pulled November 5, 2026, plus the statewide environment figures pulled October 29, 2026
Last updated November 6, 2026. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
Complete Guide
Federal Grants for Nonprofits 2026: Where to Apply
Federal grants for nonprofits 2026: nonprofits got $42.7B in direct federal grants in FY2025, $25.4B from HHS. How to register, apply, and win subgrants.
Grants for Community Radio Stations 2026: Who Funds Them
Grants for community radio stations in 2026: CPB's FY 2026 and 2027 money was rescinded, so 990-PF funders and NEA grants of $10,000 and up matter more.
Amber Grant 2026: Rules, $15 Fee, Grants for Women
The Amber Grant gives three $15,000 grants a month plus three $75,000 year-end grants, for a $15 fee. Other real grants for women, and scam signs.
Federal Grants for HBCUs 2026: Find Federal Funding
Compare 6 federal funding routes for HBCUs, from Title III Part B formula aid to NIH RCMI, DOD HBCU/MI, and USDA 1890 capacity grants.
Federal Grants for K-12 Schools 2026: All Programs
K-12 schools get $80B+ in federal funding yearly across 12+ programs. Title I, IDEA, ESSER wind-down, and competitive grants.
Federal Grants for Rural Organizations (2026)
Federal grants for rural groups in 2026: USDA Community Facilities grants cover up to 75% of costs and EDA up to 80%. Compare 15+ programs by status.