USDA REAP Grant 2026: New Rule, Amounts and Status
Updated 9 official sources
Quick Answer: USDA isn't taking REAP grant applications right now.
Full answer and how we checked it
On October 18, 2026, its REAP grant page (opens in a new tab) listed the window as closed and said a funding notice with the application period "will publish soon." REAP guaranteed loans are still open. The final rule (opens in a new tab) that took effect October 16, 2026 changes the grant: you build first, then apply with 12 months of actual output or savings data. Requests run from $1,500 to $500,000 for renewable energy and $250,000 for efficiency, and the grant covers at most 25% of project cost.
This guide is for: Agricultural producers, rural small business owners, solar installers, lenders, energy auditors, and grant writers checking USDA REAP grant eligibility, amounts, application timing, and the October 2026 rule change.
Data note: Grant limits, eligibility and scoring come from USDA's October 1, 2026 final rule (Federal Register document 2026-20178). Grant window status and loan terms come from USDA Rural Development's REAP grant page, checked October 18, 2026. Grantsights checked the Federal Register for any newer REAP notice the same day and found none after the final rule.
2 open federal calls list small businesses and mention agriculture
Checked nationwide: federal calls, not state programs.
- Agriculture Innovation Center Grant Program
Rural Business-Cooperative Service · Due Jan 31, 2027 · Up to $1.0M
- F24AS00298 Cooperative Agriculture
Fish and Wildlife Service · Due Mar 7, 2029
See the programs your organization qualifies for: 9 questions, about two minutes, free.
See farm and rural programsIn this guide
- October 2026 Status: A New REAP Rule Took Effect October 16
- What REAP Funds: Two Categories
- Who Qualifies for USDA REAP Grants
- REAP Grant Application Scoring: How USDA Decides
- The Inflation Reduction Act Changed REAP Substantially
- Step-by-Step Application Process Under the October 2026 Rule
- What USDA's Website Doesn't Tell You About REAP
- Best Fit and Bad Fit Checklist for USDA REAP Grants
- REAP Compared to Other Energy Incentives
- Common Application Mistakes
- Related Guides
- Sources
2 open federal calls list small businesses and mention agriculture
Checked nationwide: federal calls, not state programs.
- Agriculture Innovation Center Grant Program
Rural Business-Cooperative Service · Due Jan 31, 2027 · Up to $1.0M
- F24AS00298 Cooperative Agriculture
Fish and Wildlife Service · Due Mar 7, 2029
See the programs your organization qualifies for: 9 questions, about two minutes, free.
See farm and rural programsIf you're a farmer, rancher, or rural business owner looking to install solar panels, upgrade to energy-efficient equipment, or invest in any renewable energy system, USDA REAP grants should be at the top of your list. This guide is for agricultural producers and rural small business owners who want to understand exactly how USDA REAP grants work, what qualifies, and how the application scoring determines who gets funded.
REAP has grown from a niche energy program into one of USDA's most popular grant offerings. The Inflation Reduction Act of 2022 added about $2 billion to REAP, which was a major increase but also attracted a wave of new applicants who'd never heard of the program before. The strongest applicants separate three decisions before they sign a vendor contract: grant timing, loan timing, and tax-credit economics. REAP is one of several federal programs available to rural small businesses; our small business grants complete guide covers the full range of non-dilutive funding options.
For other rural and small business funding options while the new REAP process starts, use the free Grantsights eligibility checker.
October 2026 Status: A New REAP Rule Took Effect October 16
REAP grant awards were halted on March 31, 2026, and USDA formally rescinded the October 2024 funding notice that covered FY2025 through FY2027 (Federal Register, April 15, 2026 (opens in a new tab)). On October 1, 2026, USDA published a final rule with comment period (opens in a new tab), effective October 16, 2026, with comments due November 2, 2026. According to the rule:
- Build first, then apply. Projects must be fully built and operating before you apply. Applications include 12 months of actual energy production or savings data plus 12 months of pre-installation data.
- New grant limits. The minimum grant request is $1,500. The maximum is $500,000 for a renewable energy system and $250,000 for an energy efficiency improvement, down from $1,000,000 and $500,000.
- Cost share. Cost sharing must cover at least 75% of project cost, and combined REAP grant and guaranteed loan funding can't exceed 75% of project cost.
- One national competition. State-level competitions are replaced by one competition for requests of $20,000 or less and one national competition for the rest, with annual application windows and one application per applicant (counting everyone who owns it) per federal fiscal year.
- Completion window. The project must have been finished 12 to 24 months before you apply. For the first window under the new rule, USDA allows 12 to 36 months.
- Narrower eligibility. Every project must be in a USDA-eligible rural area, including agricultural producers' projects. Ground-mount solar or wind on cropland, multi-location projects, retrofits of existing ground-mount solar or wind, and systems whose simple payback exceeds their useful life are ineligible. Battery storage is capped at 120% of the applicant's average energy use.
- Financial screens. The applicant's latest balance sheet must show a current ratio of at least 1:1 and its latest cash flow statement must be positive.
| Path | Status on October 18, 2026 | What to do now |
|---|---|---|
| REAP grant | Closed; USDA says the notice opening the next window "will publish soon" | Don't count on a REAP grant to pay for construction. Keep 12 months of pre-installation energy data before you build. |
| REAP guaranteed loan | Still accepting applications | Talk to a lender and USDA state energy coordinator. USDA's page lists up to 75% of eligible costs, an 80% guarantee for FY2025 loans, and terms up to 40 years. |
| Grant plus guaranteed loan | Applied for separately; combined cap of 75% of project cost | Finance construction first; treat any grant as a later reimbursement-style award. |
| Solar or wind project counting on federal tax credits | The 48E credit ends for solar and wind placed in service after 2027 unless construction began by July 4, 2026 | Ask a tax advisor and model project economics without counting a near-term REAP grant. |
The downside is that older REAP articles still describe March and October windows, pre-construction applications and grants of up to 50% as if they still apply. Even USDA's own REAP page still shows some pre-rule text below the closed-window notice, including grants of up to 50% and non-rural projects for agricultural producers. Our review of the final rule found that the regulation now controls: 25% maximum, rural location for every project, and build-first timing. The safer path is to keep your energy records, confirm loan options, and watch for the notice.
Get grant deadline alerts by email
About once a week, we email a short list of open grant calls with real deadlines from different funders. It isn't limited to the programs in this guide.
No spam. Unsubscribe anytime.
What REAP Funds: Two Categories
REAP splits into two distinct funding categories, and understanding which one your project falls under matters for your application.
Renewable Energy Systems (RES)
A renewable energy system generates energy from a renewable source. Eligible technologies include:
| Technology | Common Projects | October 2026 rule limits to check |
|---|---|---|
| Solar (photovoltaic) | Rooftop, ground-mount, carport arrays | Ground mount on cropland is ineligible; ground mount must match documented historical energy use |
| Wind | Small and medium turbines | Turbines on cropland are ineligible; same historical-use test for ground mount |
| Geothermal | Electric generation or direct use | $500,000 maximum request |
| Hydroelectric | Run-of-river, micro-hydro | Systems rated above 30 MW are ineligible |
| Biomass | Wood pellet boilers, anaerobic digesters | Combined heat and power using steam instead of renewable biomass applies as efficiency |
| Hydrogen | Fuel cells using renewable hydrogen | $500,000 maximum request |
| Ocean energy | Tidal, current and thermal | $500,000 maximum request |
Solar has made up a large share of REAP applications in recent rounds, which is why the cropland and system-size limits matter most. According to USDA's final rule, the agency wrote them to stop large ground-mount arrays from displacing cropland or exceeding a business's actual energy needs.
Grant limits for RES: Under the rule effective October 16, 2026, the minimum request is $1,500 and the maximum is $500,000 (it was $2,500 to $1,000,000). The grant covers at most 25% of project cost.
Energy Efficiency Improvements (EEI)
Energy efficiency improvements reduce the energy consumption of an existing building or process. Common projects include:
- HVAC system upgrades
- Insulation and building envelope improvements
- Lighting upgrades (LED conversions)
- Grain dryer efficiency improvements
- Refrigeration and cooling system upgrades
- Irrigation pump efficiency
- Variable frequency drives on motors
- High-efficiency equipment replacements
Grant limits for EEI: Under the rule effective October 16, 2026, the minimum request is $1,500 and the maximum is $250,000 (it was $500,000). The grant covers at most 25% of project cost.
The distinction matters because the two categories use different math. EEI projects document 12 months of energy use before and after the improvement in an Energy Audit or Energy Assessment, while RES projects document 12 months of actual production. Scoring tables for energy saved, percentage replaced and payback are separate for each.
Who Qualifies for USDA REAP Grants
Agricultural Producers
You qualify as an agricultural producer if you received at least 50% of your gross income from agricultural operations in the most recent tax year, or you can demonstrate that you will receive 50% of your gross income from agricultural operations in the year the application is submitted.
This changed in October 2026. Before the rule, agricultural producers could put a REAP project in a non-rural area if it was tied to an on-site production operation. The October 2026 rule amended rural area eligibility so the project must be located in a rural area for every applicant, including agricultural producers. A farmer in a suburban county should check the USDA eligibility map (opens in a new tab) before planning around a grant. The rule also defines an agricultural producer as a for-profit organization, with ownership structures spelled out in the definition.
Rural Small Businesses
A small business in a USDA-eligible rural area (generally population 50,000 or fewer) can apply. You must meet the SBA size standards for your industry (check sba.gov/size-standards (opens in a new tab)). The business must be located in a USDA-eligible rural area (opens in a new tab).
Who Cannot Apply
- Entities that produce more than 50% of their income from the production of fossil fuels
- Residential property owners (REAP is for businesses and agricultural operations, not homes). The rule allows only three residential-use exceptions: community solar subscriptions where users don't own the assets, licensed 24-hour nursing homes and assisted living facilities, and for-profit hotels with stays of 30 days or less
- Federal, state, and local government entities
- Most nonprofit organizations. The rule defines an agricultural producer as a for-profit organization, and USDA's REAP page limits rural small businesses to for-profit entities, cooperatives, rural electric utilities and certain tribal businesses
- Applicants with delinquent federal taxes, debt, a judgment or debarment
REAP Grant Application Scoring: How USDA Decides
Under the October 2026 rule (opens in a new tab), USDA employees score eligible applications on 90 points, plus up to 10 priority points USDA posts on the program website. Applications must pass an eligibility review and a risk review (including the 1:1 current ratio and positive cash flow tests) before they're scored.
| Criterion | Points | What earns them |
|---|---|---|
| Impact | 0 to 10 | 5 points for employing at least three people besides the owners; 5 points for a business that provides critical community services, such as a grocery store, laundry, veterinary clinic or medical office |
| Energy saved or produced per award dollar | 0 to 25 | Annual energy saved (efficiency) or produced (renewable) for each grant dollar requested |
| Percentage of energy saved or replaced | 0 to 20 | Share of your measured 12-month energy use the project saves or replaces; an efficiency project saving 9.4% or less gets 0 |
| Environmental benefits | 0 to 5 | For efficiency projects, 3 points if the project produces no greenhouse gases, plus points such as 1 for addressing forest fire hazards |
| Prior awards | 0 to 15 | 15 points with no prior REAP award, 5 with none in the last two years, 0 with one in the last two years |
| Simple payback | 0 to 15 | For efficiency projects, 15 points for payback under 4 years and 0 for more than 12; payback longer than useful life is ineligible |
| Priority points | 0 to 10 | Priorities USDA posts for the year |
Two things changed the most. First, scores now rest on 12 months of measured data, not projections, so a project that underperforms its sales estimate loses points. Second, first-time applicants get a 15-point edge over anyone with a REAP award in the last two years.
How USDA Picks Winners Under the New Rule
Requests of $20,000 or less compete first for a reserve and are funded in rank order until the reserve runs out or scores drop to the 40-point minimum. Everything else, including small requests that missed the reserve, goes to one national competition. USDA first picks the highest-scoring application from each state (Puerto Rico, the Virgin Islands and the Western Pacific each count as a state) and then funds the rest in rank order until money runs out or the minimum score is reached.
Scoring Before the Rule, for Comparison
Older REAP guides describe the pre-2026 scoring, which awarded points for projected energy replaced, commercial availability, technical merit of a technical report, readiness, and bonus points for small projects and less-common technologies, with separate state and national competitions. If a consultant's checklist still mentions technical merit or readiness points, it predates the October 2026 rule.
The Inflation Reduction Act Changed REAP Substantially
The Inflation Reduction Act (opens in a new tab) added roughly $2 billion to REAP, transforming the program in several ways:
- More money available. Before the IRA, REAP's mandatory Farm Bill funding was around $50 million a year. IRA funding roughly tripled the available dollars over a multi-year period.
- Less-common technology grants. IRA created a special grant category for technologies that were less represented in prior award pools, with grants covering up to 50% of project costs instead of the standard 25%. The October 2026 rule's 75% cost-share requirement ends that 50% option for new applications.
- More application windows, for a while. IRA-era notices ran several application windows a year. The October 2026 rule moves REAP to annual windows with one application per applicant per fiscal year.
- Higher competition. The increased publicity attracted many new applicants. Installers and solar companies began marketing REAP grants as part of their sales pitch, which increased application volume significantly.
- A new model in 2026. Grant awards were halted in March 2026, and the October 2026 rule replaces the old pre-construction application with a post-completion one. IRA-era grant-share assumptions no longer apply.
A common mistake now is planning construction around a REAP grant award. Under the new rule you build first and apply afterward, so the project has to work financially without the grant in hand.
Step-by-Step Application Process Under the October 2026 Rule
According to USDA's October 2026 rule, a REAP grant application now comes after the project, not before it. USDA will publish the submission period, address and format in an annual notice, so treat these steps as preparation until that notice posts.
Step 1: Verify Eligibility
Confirm you're an agricultural producer (a for-profit operation with at least 50% of gross income from agriculture in the most recent complete calendar year) or a small business that meets SBA size standards (opens in a new tab), and that the project site is in a USDA-eligible rural area. Check that you have an active SAM.gov registration and no delinquent federal debt.
Step 2: Keep 12 Months of Pre-Installation Energy Records
Save utility bills or fuel records for the 12 months before the project. For efficiency projects, the Energy Audit or Energy Assessment summarizes them, and the after-installation comparison has to use the same input and output conditions (for example, drying the same 50,000 bushels of grain both years).
Step 3: Build and Finance the Project Yourself
Use your own funds, a conventional loan or a REAP guaranteed loan. According to USDA, REAP guaranteed loans can cover up to 75% of eligible project costs, and the rule says they exist to help applicants carry up-front costs now that grants come after completion. The installer must be licensed in your state, have installed at least three similar systems, and have no conflict of interest, and contractors must be chosen with procurement procedures that meet 2 CFR 200.318. The project period can last up to 24 months and ends no later than 30 days after installation.
Step 4: Run the Project for 12 Months
Collect 12 months of actual energy production or savings data. The project must be finished 12 to 24 months before you apply (12 to 36 months for the first window under the new rule).
Step 5: Apply During the Annual Window
Submit one application per federal fiscal year, with the 12 months of before and after data, financial statements showing a 1:1 current ratio and positive cash flow, and documentation of at least 75% cost sharing. Watch the REAP grants page (opens in a new tab) and the Federal Register for the notice.
Step 6: Wait for Scoring and Award
USDA reviews eligibility and risk, scores the application, and selects winners through the $20,000-or-less reserve and the national competition. Under the rule, USDA no longer notifies applicants when they pass the eligibility stage, so silence after you submit isn't a bad sign.
What USDA's Website Doesn't Tell You About REAP
The official program materials present REAP as straightforward, but there are several things applicants learn the hard way.
First, the 25% grant sounds great until you realize you need 75% from other sources. Many applicants assume the remaining 75% must be cash out of pocket, but you can use conventional loans, REAP guaranteed loans, equipment financing, state incentives, and federal tax credits to cover the balance. Stacking REAP with the 30% clean electricity investment credit used to cover 55% of a solar project between the grant and the credit. That math now has a deadline: IRS Notice 2025-42 (opens in a new tab) explains that the 2025 tax law ends the 48E credit for solar and wind facilities placed in service after December 31, 2027 unless construction began by July 4, 2026. A project that missed that start date and won't be in service by the end of 2027 shouldn't count on the credit.
Second, your data is everything now. The rule removed the old technical report appendices, so the application rests on 12 months of actual bills and meter readings before and after the project. Missing months or changed operating conditions (a new barn, a bigger herd) can make the comparison fail. Start a clean energy-records file before you sign a contract.
Third, the timeline from spending to getting money is far longer than it was. You pay for the project, run it for at least 12 months, wait for the annual window, and then wait for scoring and award. A project finished in early 2027 might not see grant money until 2028 or later. The old rule that starting construction before approval made you ineligible is gone; under the new rule, construction has to come first.
Fourth, "commercially available" matters more than people think. USDA won't fund experimental technology. If you want to install an emerging battery technology or a novel biomass system, the technology must have a track record of commercial installations. Prototypes and pilot projects don't qualify.
Finally, state competitions are gone. Under the new rule, every state's highest-scoring application is funded first (if it meets the minimum score), and then all remaining applications compete nationally. In a state with few applicants, a solid application has a real shot at that first slot; in Iowa or Texas, you're competing nationally after the top one.
The current trap is timing. If a vendor tells you a REAP grant will close your funding gap, that's a red flag: under the October 2026 rule you can't apply until the project has been built and running for a year, so the grant can't pay for construction.
For example, one farmer with a quoted $180,000 rooftop solar project could still make the project work with a lender, but the cash-flow model failed when the vendor assumed a near-term REAP grant award and a tax credit the project may no longer get. The better decision was to keep 12 months of utility bills and the SAM.gov record ready, talk to the USDA state energy coordinator about a guaranteed loan, and rerun the payback model with no grant cash. A grant of up to $45,000 (25%) could still come later, after a year of documented production.
Best Fit and Bad Fit Checklist for USDA REAP Grants
| Applicant or project | Best REAP route | Bad fit signal |
|---|---|---|
| Agricultural producer with 50% or more gross income from agriculture | REAP loan now, REAP grant after the project runs for 12 months | Bad fit if tax returns do not support producer status or the site isn't rural |
| Rural small business in an eligible area | REAP guaranteed loan now, grant prep for later notice | Bad fit if the business is outside USDA rural eligibility |
| Rooftop or non-cropland solar with 12 months of pre-installation bills | REAP renewable energy system route after 12 months of operation | Bad fit if the array is ground-mounted on cropland or sized beyond documented energy use |
| Energy efficiency project with documented current energy use | REAP energy efficiency route with qualified audit | Bad fit if the audit does not support savings calculations |
| Vendor-led proposal promising REAP grant cash to fund construction | Stop and model the project without the grant | Bad fit: under the new rule, the grant comes only after a year of documented operation |
The common thread in the bad-fit column is timing and data. Under the October 2026 rule, nobody can apply now, and the projects that will score well later are the ones keeping clean energy records today.
REAP Compared to Other Energy Incentives
| Incentive | Amount | Who Qualifies | Stacks with REAP? |
|---|---|---|---|
| USDA REAP Grant | Up to 25% of costs | Ag producers, rural businesses | N/A |
| Federal 48E credit (solar, wind) | 30% tax credit, ending for solar and wind placed in service after 2027 unless construction began by July 4, 2026 | Businesses with tax liability | Yes, if the project still qualifies |
| State solar incentives | Varies by state | Varies | Usually yes |
| USDA REAP Loan Guarantee | Up to 75% of costs | Same as grant | Yes |
| Depreciation (MACRS) | ~26% effective benefit | Businesses with tax liability | Yes |
A solar project that still qualifies for the 48E credit can stack REAP (25% grant) + the 30% credit + MACRS depreciation (~26% effective value) for a total incentive package covering over 75% of the installation cost. For projects that don't qualify for the credit, the stack drops to the REAP grant and depreciation, and the grant arrives a year or more after you pay for the system. Model both cases before you sign.
For related programs, see our grants for rural small businesses guide and the broader USDA grants guide. Agricultural producers should also review grants for farmers and agriculture for other USDA programs.
Common Application Mistakes
- Not meeting the 50% ag income threshold. If you're a part-time farmer with a full-time off-farm job, you may not qualify as an agricultural producer. Check your tax returns carefully.
- Following pre-2026 advice to wait for approval before building. Under the October 2026 rule, the project must be complete 12 to 24 months before you apply. Waiting for a commitment letter means waiting forever.
- Not keeping 12 months of pre-installation energy records. Without them there's no baseline to score, and the application fails on completeness.
- Forgetting to document matching funds. You need to show where the remaining 75% is coming from, even if it's a bank loan or equipment financing.
- Missing the application window. REAP now has one annual window and one application per fiscal year. A perfect application submitted one day late waits a year.
- Putting a ground-mount array on cropland. It's ineligible under the new rule, no matter how good the numbers are.
Related Guides
Sources
- USDA REAP final rule with comment period, Federal Register, October 1, 2026 (opens in a new tab)
- Notice of rescission of the REAP funding opportunity, Federal Register, April 15, 2026 (opens in a new tab)
- USDA REAP Program Page: https://www.rd.usda.gov/programs-services/energy-programs/rural-energy-america-program-renewable-energy-systems-energy-efficiency-improvement-guaranteed-loans (opens in a new tab)
- USDA Inflation Reduction Act Funding: https://www.usda.gov/ira (opens in a new tab)
- USDA Rural Eligibility Tool: https://eligibility.sc.egov.usda.gov/eligibility/welcomeAction.do (opens in a new tab)
- Congressional Research Service, USDA Rural Energy Programs: https://www.congress.gov/crs-product/R46234 (opens in a new tab)
REAP route chooser
Do not price the project around REAP until you check the current route
REAP searches usually split by applicant type, rural location, energy technology, match funding, and current window status. Start with the free fit check when you are unsure, then open the grant status or adjacent USDA routes only after the route is clear.
Fit checks
Applicant type
REAP is for agricultural producers and rural small businesses, not every property owner with an energy project.
Current timing
USDA lists the REAP grant window as closed, while guaranteed loan applications may still be submitted.
Funding share
USDA lists grants up to 50% of eligible costs and combined grant plus loan guarantee support up to 75%.
Award checks
Renewable energy systems
USDA lists REAP renewable energy grants from $2,500 to $1 million.
Energy efficiency improvements
USDA lists energy efficiency grants from $1,500 to $500,000.
Rural location
Most projects must be in rural areas with populations of 50,000 or fewer, subject to USDA checks.
Official USDA checks
Route check
Check the small-business route before choosing REAP
REAP is one of the few federal grants a rural business applies for itself. Compare it with SBA loans and microloans, free SBDC advising and state programs before you plan the project.
Free. No payment on this step.
Next steps
REAP and other rural business funding
These next pages help you move from research into a specific grant choice.
USDA REAP program page
Check the closed 2026 grant window, live guaranteed-loan route, rural area rule, grant-share rules, and award data.
Environment and energy routes
Compare REAP with weatherization, rural facilities, and environmental funding before choosing the energy path.
USDA rural business grants
Compare REAP loan guarantees with RBDG, RMAP, B&I, and Community Facilities before writing.
USDA RMAP
Use when an eligible MDO needs the FY2026 technical-assistance grant or revolving-fund loan route for rural microenterprise support.
Find grants that fit you
Free eligibility check: answer 9 questions and see ranked matches with deadlines and fit reasons.
Frequently Asked Questions
Is the USDA REAP grant open in 2026?
Not for grants. On October 18, 2026, USDA's REAP grant page said the agency isn't accepting REAP grant applications and that a Notice of Funding Opportunity with the application period 'will publish soon.' The new REAP rule took effect October 16, 2026. REAP guaranteed loan applications can still be submitted through a lender and your USDA Rural Development state office.
What's the maximum REAP grant amount?
Under USDA's final rule published October 1, 2026 and effective October 16, 2026, the maximum grant request is $500,000 for renewable energy systems and $250,000 for energy efficiency improvements, and the minimum is $1,500. Cost sharing must cover at least 75% of project cost, so the grant covers at most 25%. Before the rule, the caps were $1,000,000 and $500,000. Grants are now awarded only after the project is built and operating.
Do I need an energy audit to apply for REAP?
For energy efficiency projects, yes. Under the October 2026 rule, an efficiency application documents 12 months of actual energy use before and 12 months after the improvement, summarized in an Energy Audit or Energy Assessment, and the rule limits who can do the audit to an Energy Auditor. The old technical report appendices for renewable energy projects, including the simplified report for smaller projects, were removed because projects are now complete before you apply.
Can I get a REAP grant for solar panels on my farm?
Sometimes, but the October 2026 rule narrowed it. Ground-mount solar or wind installed on cropland is ineligible, and ground-mount systems must document historical energy use that matches the system's size. The project must be in a USDA-eligible rural area, already built and operating, and backed by 12 months of production data. Rooftop and other non-cropland systems on an eligible farm or rural small business can still apply when USDA opens a window.
How competitive is the REAP program?
The October 2026 rule replaces state competitions with one competition for requests of $20,000 or less and one national competition for everything else. USDA first selects the highest-scoring application from each state, then funds the rest in rank order until money runs out or scores fall below the minimum. Each applicant gets one application per federal fiscal year. Grantsights doesn't estimate a funding rate for the new process.
What's the difference between REAP grants and REAP guaranteed loans?
A REAP grant doesn't need to be repaid and covers at most 25% of project cost under the October 2026 rule. A REAP guaranteed loan is a loan from a private lender that USDA partly guarantees under 7 CFR 5001, for up to 75% of eligible project costs. USDA's REAP page lists an 80% guarantee for FY2025 loans, a 1% initial guarantee fee and a 0.25% annual retention fee. You apply separately, and combined REAP grant and loan funding can't exceed 75% of project cost.
Last updated October 18, 2026. Corrected October 18, 2026: what changed. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
USDA REAP Winners and Award History
USDA REAP winners from Rural Development award charts, award amounts, recipient types, project signals, and apply or wait guidance.
Beginning Farmer Grants & Loans (2026 Guide)
6 federal programs reserve funding for beginning farmers with under 10 years experience. See FSA microloans, EQIP set-asides, and BFRDP training grants.
USDA Energy Grants 2026: All Programs Guide
USDA REAP grants cover up to 50% of costs but are paused. Compare REAP loans, 9003 guarantees up to $250M, RESP 0% loans and EQIP for 2026.
USDA Food Assistance Grants 2026: Full Guide
7 USDA food programs compared: TEFAP, CSFP, FDPIR, Farm to School, GusNIP, Community Food Projects, and SNAP-Ed, whose funding ended in 2025.
Rural Business Development Grants & IRP Loans 2026
RBDG has no award cap and no match; the FY2025 median award was about $75,600. IRP lends intermediaries up to $1M at 1% for 30 years. Rules and dates.
Value-Added Producer Grants Guide (2026)
VAPG capped FY2026 awards at $50K for planning and $200K for working capital. See priority groups, the 1:1 match, and what counts as value-added.