LEADER Funding Ireland 2026: Rates, LAGs and CLÁR
Quick Answer: LEADER is the EU and Irish rural development programme for 2023-2027, run locally by Local Action Groups (LAGs; the Department's approvals table lists 33 LAG areas) everywhere except the cities of Dublin, Cork, Limerick, Waterford and Galway.
Full answer and how we checked it
Under the 2023-2027 LEADER Operating Rules, it pays up to 75% of an investment project, capped at €200,000, or €500,000 for a community project with no economic activity; feasibility studies get up to 90% (to €30,000). You start by contacting your LAG with an expression of interest, and nothing can be bought or started before your contract is signed. As of 30 September 2026, the Department's lists show 1,516 approved projects worth €75.5 million, 42% of the €180 million programme. CLÁR 2026 has closed for applications, and the 2026 Town and Village Renewal Scheme is open to councils until 22 January 2027.
This guide is for: community groups, sports clubs, rural businesses, farm families diversifying and social enterprises in rural Ireland who want to know what LEADER pays, how to reach their Local Action Group, and which Department of Rural and Community Development schemes are open now.
Data note: Grantsights checked every rule below on 31 October 2026 against the 2023-2027 LEADER Operating Rules (opens in a new tab) (version 8, dated 19 June 2026), the Department of Rural and Community Development and the Gaeltacht's LEADER, CLÁR, Town and Village Renewal and Local Improvement Scheme pages, and the 2026 scheme outlines. Award figures are Grantsights analysis of the Department's LEADER approved projects lists (opens in a new tab): 33 per-LAG PDFs of projects approved as of 30 September 2026, downloaded on 31 October 2026. The lists show approvals, not payments, and the Department updates them periodically (most recently on 13 October 2026).
Last updated: 31 October 2026.
Grantsights' own tools cover US funding only. What we cover outside the US
In this guide (9 sections)
- LEADER Grant Rates and Ceilings for 2023-2027
- Where LEADER Applies and What It Won't Fund
- How to Apply to Your Local Action Group, Step by Step
- What 1,516 LEADER Approvals Show
- What the Department's LEADER Pages Don't Tell You
- CLÁR 2026: Closed for Applications, Results Due Before Year-End
- Town and Village Renewal, Local Improvement and Community Recognition
- Who Should Apply for LEADER, and Who Should Look Elsewhere
- Sources Checked
A note before you read: Grantsights' grant tools only search United States funding, so this page doesn't sell you anything; every link goes to the Department, your LAG or your council. If an Irish version would help your group, register your interest from Ireland. For business-only grants such as Local Enterprise Office support, our small business grants Ireland guide is the overview; this page goes deeper on LEADER and the rural schemes around it.
LEADER Grant Rates and Ceilings for 2023-2027
LEADER pays a share of your project, never all of it, and the share depends on 2 things: what the project is and whether you're a community or a private applicant. The table is from section 10.2.3 of the operating rules, as read on 31 October 2026.
| Type of project | Applicant | Maximum rate of aid | Maximum grant |
|---|---|---|---|
| Community project, no economic activity | Community | 75% | €500,000 |
| Community project with economic activity | Community | 75% | €200,000 |
| Investment and other supports | Private | 75% | €200,000 |
| Investment and other supports | Community | 75% | €200,000 |
| Accessible services aimed at hard-to-reach communities | Community | 90% | €200,000 |
| Analysis and development (feasibility, plans) | Private or community | 90% | €30,000 |
| Training | Private or community | 100% | €200,000 |
Three rules sit behind that table:
- The €200,000 ceiling is a state aid limit. According to the operating rules, the LAG can't offer more than €200,000 to one applicant because that sits within the €300,000 de minimis threshold for state aid. Only community projects without economic activity can go to €500,000, and they must be free and open to the public, not just club members.
- You put in at least 5% in cash. Private matching funds must include a cash contribution of at least 5% of the total cost, except on training funded at 100%. Community applicants can count some contribution in kind, and farm families diversifying can count the farmer's own labour.
- "Community" has a strict meaning. To get community rates, a group must be non-profit, independent of the State, voluntary and serving the wider community. A tourism business group, a cattle or pony society, or a social enterprise that trades doesn't count, so it's assessed at private rates.
Where LEADER Applies and What It Won't Fund
LEADER covers all of Ireland except areas inside the boundaries of the 5 main cities, according to the Department's LEADER programme page (opens in a new tab). Arts groups should note that LEADER funds rural venues and infrastructure rather than artistic programmes, which our Arts Council funding guide covers. Your project must also fit the Local Development Strategy your LAG wrote, under 3 themes: economic development and job creation, rural infrastructure and social inclusion, and the rural environment and climate change.
The operating rules (section 6.6.2) list sectors LEADER won't fund at all:
- primary agriculture and primary horticulture, including bee-keeping (post-harvest processing such as jam making can qualify)
- commercial fisheries, including fish farming and processing
- buying animals or livestock
- conventional retail, except community shops, farm shops and outlets selling local produce
- courses that form part of normal education, private schools, Montessori schools and crèches
- research bodies and continuous professional development courses
The 5-year rule. You must keep the funded project running as funded for 5 years from the last LEADER payment. If the business closes, the asset is sold or the facility stops being used for its purpose, the LAG will ask for some or all of the grant back. If you're not confident the project will last, don't apply.
For a club building a pitch or dressing rooms, compare LEADER with the Department of Sport's capital scheme in our sports capital grant guide, which often suits larger sports projects better.
How to Apply to Your Local Action Group, Step by Step
Applying takes 6 steps, and the order matters because one wrong move (starting work) makes the whole project ineligible.
- Find your LAG. The Department publishes a contact list for all Local Action Groups (opens in a new tab) with each Implementing Partner's phone number and email. In Cork there are several LAGs by sub-region, and Galway has East, West and Islands groups.
- Register an expression of interest (EOI). Staff can reject an EOI straight away if the project is ineligible, outside a current call or not in the strategy, so ask first whether there's an open call for your type of project.
- Prepare the full application. Expect to need quotes or tenders, planning permission where relevant and proof of your matching funds; larger projects often need a feasibility study or business plan, which LEADER itself can part-fund at up to 90%. The LAG should acknowledge receipt within 10 working days.
- Assessment and evaluation. A project officer visits the site, an administrative check is done, and an evaluation committee scores the project before the LAG's decision-making members vote.
- Sign the contract before you spend. The suggested acceptance period for an offer is 15 working days. Anything started or bought before the LAG receives your signed contract isn't eligible.
- Deliver, then claim. The operating rules say you must have paid for goods or services before you claim reimbursement, so plan bridging finance.
Provisional approval has a 6-month clock. Some LAGs grant provisional approval before tenders or full planning permission. If the tender or the planning decision isn't done within 6 months, you have to apply again, and that 6-month sunset clause can't be extended. If tenders come in above 110% of your estimate, you pay the difference.
What 1,516 LEADER Approvals Show
According to the LEADER approved projects data, the Department's 33 LAG lists held 1,516 projects worth €75.45 million approved under the 2023-2027 programme up to 30 September 2026. Grantsights analysis of those lists puts the median approval at about €28,700. The earliest approvals in the lists date from 2024: 176 approvals in 2024 (€9.9 million), 753 in 2025 (€35.6 million) and 587 so far in 2026 (€30.0 million).
| Approved grant | Projects | Total |
|---|---|---|
| Under €10,000 | 282 | €1.72 million |
| €10,000 to €49,999 | 745 | €18.72 million |
| €50,000 to €99,999 | 231 | €16.48 million |
| €100,000 to €199,999 | 210 | €28.35 million |
| Exactly €200,000 | 43 | €8.60 million |
| Over €200,000 | 5 | €1.59 million |
Data: Department of Rural and Community Development and the Gaeltacht, 2023-2027 Local Action Groups approved projects (per-LAG PDFs as of 30 September 2026), downloaded 31 October 2026. Per-project totals match the Department's LAG table to within a few euro of rounding.
Two-thirds of approvals were under €50,000. Only 5 went above the €200,000 ceiling, all to community projects, the largest being €500,000 for the Leighlin Parish Amenities Hub in Carlow in 2026.
By sub-theme:
| Sub-theme | Projects | Total | Median |
|---|---|---|---|
| Rural Infrastructure | 330 | €19.73 million | €34,059 |
| Rural Tourism and Recreation | 330 | €14.62 million | €26,756 |
| Enterprise Development | 177 | €11.17 million | €42,511 |
| Accessible Services | 155 | €7.31 million | €26,943 |
| Rural Youth | 115 | €5.87 million | €29,889 |
| Green Economy | 83 | €5.13 million | €44,930 |
| Climate Change Mitigation and Adaptation | 94 | €4.19 million | €19,880 |
| Rural Food Production | 46 | €2.38 million | €36,938 |
| Agricultural Diversification | 40 | €1.79 million | €22,105 |
| Climate Change Capacity Building | 54 | €1.42 million | €19,466 |
| Optimising Digital Connectivity | 58 | €0.59 million | €5,361 |
A further 34 projects (€1.26 million) had a sub-theme split across lines in the PDFs and weren't classified.
Businesses do get LEADER money. Grantsights counted 305 approvals (€21.4 million) to promoters whose names include Ltd, Limited, Teo or T/A, leaving out companies limited by guarantee, clubs, associations and trusts. Their median was €50,000, and 16 reached the €200,000 ceiling. That's a name-based count, so treat it as a close estimate. A case in point: in Carlow, Mount Leinster Distillers Ltd was approved €200,000 in 2025 to turn a warehouse into a bonded warehouse and workspace, and O'Toole Composting Ltd €200,000 in 2026 for a new shredder, while Wise Heat HVAC Solutions Ltd got €24,987.
By county, against the 2023-2027 allocation:
| County | Approved projects | Approved to 30 Sep 2026 | 2023-2027 allocation | Share approved |
|---|---|---|---|---|
| Kerry | 143 | €5.74 million | €8.2 million | 70% |
| Leitrim | 60 | €3.55 million | €6.3 million | 56% |
| Roscommon | 53 | €3.79 million | €6.8 million | 56% |
| Donegal | 114 | €5.44 million | €10.4 million | 52% |
| Galway (3 LAGs) | 87 | €4.59 million | €9.0 million | 51% |
| Tipperary | 68 | €3.78 million | €7.8 million | 48% |
| Cork (6 LAGs) | 129 | €6.08 million | €16.8 million | 36% |
| Dublin Rural | 66 | €1.25 million | €4.7 million | 27% |
| Clare | 40 | €1.68 million | €6.8 million | 25% |
| Kilkenny | 33 | €1.22 million | €6.1 million | 20% |
Allocations are the county figures published by the Department on 27 October 2022 (opens in a new tab). The table shows the six highest and four lowest of 26 counties. Part of each allocation pays for the LAG's own administration and animation work, so project approvals were never meant to reach 100%.
Limits of this data. The lists show approvals, not money paid, and some approved projects will be withdrawn or underspend. They don't show refused or withdrawn applications, so there's no success rate. The Department itself warns that LAGs run different strategies and budgets, so county comparisons are rough.
What the Department's LEADER Pages Don't Tell You
The gov.ie pages explain the structure; the approval lists show how it plays out. A few things only become clear when you read both.
Your county's remaining budget matters more than the national rate. With the 2023-2027 period in its final 14 months, Kerry had approved 70% of its allocation and Kilkenny 20%. A LAG that's committed most of its money may only run narrow calls from now on, while one with money left may be keen to approve projects. Ask your LAG directly how much is uncommitted and when the next call opens.
Most grants are small. According to the LAG approval data, the median approval was about €28,700, and 282 approvals were under €10,000. If you're planning a €200,000 grant, you're aiming at the top 3% of approvals. That's realistic for a strong enterprise or community building project, but plan a smaller version too.
Social enterprises are the most common surprise. The operating rules say a social enterprise doesn't qualify for the community rate of aid because it trades, even if profits go back into the community. Budget for private-rate rules and procurement from the start.
Honest advice on timing: if your LAG has a call open now and your project is ready, apply in this call rather than waiting for a bigger one, because the programme period is running down.
Procurement catches groups out. Promoters getting more than 50% of costs from public money must follow national public procurement guidelines, and a tender above 110% of your estimate leaves you covering the gap. Underestimating costs at EOI stage is a common mistake that sinks good community projects.
Payment comes last. LEADER reimburses money you've already spent, so a club or small business needs a bridging loan or reserves to pay contractors first.
CLÁR 2026: Closed for Applications, Results Due Before Year-End
CLÁR (Ceantair Laga Árd-Riachtanais) funds small projects in designated rural areas that have lost population. According to the Department's CLÁR 2026 launch notice (opens in a new tab) of 10 March 2026, the 2026 programme has €12 million and 3 measures:
| CLÁR 2026 measure | Maximum | How to apply | Status on 31 Oct 2026 |
|---|---|---|---|
| Measure 1: community facilities and amenities | €65,000; councils can seek up to €100,000 for 2 larger projects | Through your local authority | Closed; results due before year-end |
| Measure 2: mobility, cancer care, first responder and meals on wheels vehicles | €50,000 or €100,000 depending on vehicle | Direct to the Department | €2.5 million for 44 vehicles announced 1 October 2026 |
| Measure 3: Our Living Islands | €65,000 for facilities, €100,000 for vehicles | Direct to the Department | Closed; results due before year-end |
The 2026 review added 110 Electoral Divisions with nearly 150,000 people, so more than 1 million people now live in CLÁR areas, and every county except Dublin has some. According to the Department's 1 October 2026 announcement (opens in a new tab), 238 projects worth over €14 million were approved under CLÁR 2025, and over €65 million has gone to some 1,500 projects since 2020. For example, Western Care received €74,700 for a wheelchair accessible van serving Ballyhaunis, and North Offaly Community Development Network CLG €24,800 for a meals on wheels van in Daingean.
According to the CLÁR 2026 launch announcement, community groups apply for Measure 1 through their local authority, not the Department. If your village was added in 2026, check the updated county map now and talk to your council's community section before CLÁR 2027 opens.
Town and Village Renewal, Local Improvement and Community Recognition
Three more Department schemes often get mixed up with LEADER. All three run through your local authority, not a LAG.
Town and Village Renewal Scheme 2026 (open to councils until 22 January 2027). The 2026 scheme (opens in a new tab) launched on 16 September 2026. Main Scheme grants run from €50,000 to €500,000: each council can send one application up to €500,000 and up to 3 more capped at €300,000, plus one extra for councils with an inhabited island or Gaeltacht area. The grant covers up to 90% of costs, or 95% in the North-Western region counties (Donegal, Cavan, Sligo, Mayo, Roscommon, Galway, Leitrim and Monaghan). A Project Development Measure gives up to €50,000 to design a future project. Towns of up to 5,000 people get at least 60% of the money. Since 2016, the scheme has approved over €217 million for almost 2,000 projects. Groups can't apply to the Department directly, so talk to your council's community or rural development section well before the January deadline. If your project involves bringing an empty building back into use as a home rather than a community space, see our vacant property grant guide.
Local Improvement Scheme (LIS). This pays councils to repair private and non-publicly maintained roads that serve farmland, turf or seaweed harvesting, or amenities such as lakes and beaches. Under the 2026 LIS scheme outline (opens in a new tab), residents pay a local contribution of 10% where there are up to 5 beneficiaries and 15% where there are 6 or more, with each beneficiary's share capped at €1,200 if everyone contributes. Free labour or materials don't count. Apply to your council.
Community Recognition Fund. The gov.ie page (last updated 12 December 2025) describes the 2024 fund for towns hosting people from Ukraine and international protection applicants: €50,000 to €500,000 per project, chosen by councils, with the final application window closed on 31 January 2025 and projects to be delivered over 2025 and 2026. Grantsights found no open 2026 round on gov.ie on 31 October 2026, so don't plan around it.
Who Should Apply for LEADER, and Who Should Look Elsewhere
| Your situation | Best route | Why |
|---|---|---|
| Community group, building or facility open to all | LEADER (up to €500,000 at 75%), CLÁR Measure 1 if in a CLÁR area | Highest ceilings for non-commercial projects |
| Sports club pitch or clubhouse | Compare LEADER with the sports capital grant | Sports capital suits larger sports-only projects |
| Rural micro-business, manufacturing or tourism | LEADER enterprise (up to €200,000 at 75%) or your Local Enterprise Office | LEO grants exclude many local service businesses; LEADER may not |
| Shop, café or retailer | Usually not LEADER | Conventional retail is excluded unless it's a community or farm shop |
| Farmer growing or rearing | Department of Agriculture schemes | Primary agriculture is excluded; diversification can qualify |
| Arts organisation or festival | Our Arts Council funding guide, then LEADER for rural venues | LEADER funds rural infrastructure, not artistic programmes |
| Home or farmhouse energy upgrade | Our SEAI grants guide | LEADER isn't the route for home energy upgrades |
| City-based project | Not LEADER | The 5 cities are outside the programme |
Red flag: LAG staff and Implementing Partners help applicants free of charge. If a consultant says they can "guarantee" a LEADER or CLÁR grant, walk away, and ask your LAG what help it offers before paying anyone.
Sources Checked
All sources were read or downloaded on 31 October 2026:
- Department of Rural and Community Development and the Gaeltacht, LEADER programme for Rural Development (opens in a new tab) (last updated 24 May 2025)
- 2023-2027 LEADER Operating Rules, version 8 (opens in a new tab) (19 June 2026), from the Department's operating rules and guidelines collection (opens in a new tab)
- LEADER Local Action Groups approved projects (opens in a new tab) (last updated 13 October 2026; data as of 30 September 2026) and LAG contact details (opens in a new tab) (last updated 29 July 2026)
- 2023-2027 LEADER county allocations (opens in a new tab) (27 October 2022)
- CLÁR 2026 launch (opens in a new tab) (10 March 2026) and CLÁR Measure 2 allocations (opens in a new tab) (1 October 2026)
- Town and Village Renewal Scheme (opens in a new tab) (last updated 17 September 2026) and its 2026 scheme outline (opens in a new tab)
- Local Improvement Scheme (opens in a new tab) and its 2026 scheme outline (opens in a new tab)
- Community Recognition Fund (opens in a new tab) (last updated 12 December 2025)
Frequently Asked Questions
How much LEADER funding can I get in Ireland?
Under the 2023-2027 LEADER Operating Rules (version 8, June 2026), most projects can get up to 75% of costs, with a ceiling of €200,000. Community projects with no economic activity can get up to €500,000, though the rate is still 75% at that level. Feasibility and development studies get up to 90%, capped at €30,000, and training up to 100%, capped at €200,000. You must put in at least 5% of the cost as cash, except on training projects funded at 100%.
Can a private business get LEADER funding?
Yes, if it's in a rural area and fits your Local Action Group's strategy. Private enterprises can get up to 75% of investment costs to a maximum of €200,000, and up to 90% (to €30,000) for analysis and development work. Some sectors are excluded, including primary agriculture, fisheries, conventional retail other than community and farm shops, crèches and private schools. A social enterprise is treated as a private business for the rate of aid because it trades commercially.
Who do I apply to for LEADER funding?
You apply to the Local Action Group (LAG) for your area, usually through its Implementing Partner, often the local development company. The Department's LAG contact list on gov.ie gives the phone number and email for each one. You register an expression of interest first, and the LAG tells you whether the project fits its Local Development Strategy before you fill in a full application.
Is CLÁR funding open in 2026?
Not for new applications. CLÁR 2026 opened on 10 March 2026 with €12 million and the closing date has passed. The Department announced €2.5 million for 44 vehicles under Measure 2 on 1 October 2026 and says Measure 1 (community facilities, up to €65,000, or €100,000 for 2 larger projects per council) and Measure 3 (islands) results will come before year-end. Watch for CLÁR 2027 in spring.
How much LEADER money has been approved so far?
The Department's list of approved projects, as of 30 September 2026, shows 1,516 projects worth €75,452,431 under the 2023-2027 programme. That's 42% of the €180 million allocated for 2023-2027. Grantsights analysis of the 33 LAG project lists found a median approval of about €28,700, with 43 projects at the €200,000 ceiling.
Can I start work before my LEADER grant is approved?
No. The operating rules say any activity started, or goods or services bought, before the LAG receives your signed contract isn't eligible, and LAGs can't approve projects retrospectively. The LAG must check that work hasn't started, sometimes by site visit or dated photos. Starting early is the surest way to lose the grant.
Last updated October 31, 2026. Published by Grantsights from public sources. See our editorial policy, how we build and check guides, corrections and how we make money.
Related Guides
Arts Council Ireland Funding 2026: Awards and Deadlines
Arts Council Ireland bursaries pay up to €20,000, and 23% of eligible bids won in 2026. See every open award, the next deadlines and who got funded.
EV Grant Ireland 2026: €3,500 Grant, Chargers and VRT
SEAI's EV grant pays €3,500 on new electric cars up to €50,000, plus €300 for a home charger. See VRT relief, BIK, county data and scams to avoid.
Heat Pump Grant Ireland 2026: Up to €14,500 Explained
SEAI's heat pump grant now pays up to €14,500, with a €2,000 boiler scrappage grant. See the heat loss test, real 2025 costs, county data and scams.
Help to Buy Scheme Ireland: €35,000 Rules for 2026
Help to Buy now refunds up to €35,000 on new homes worth €500,000 or less. See the 10% and tax rules, Budget 2027 dates, self-build rules and county data.
Small Business Grants Ireland 2026: LEO and EI Funding
LEO grants reach €150,000 and Enterprise Ireland invests €50,000 or €100,000 pre-seed. See 2026 rules, who's excluded and where €22.4m went in 2025.
Solar Panel Grant Ireland 2026: €1,800 SEAI Grant
SEAI pays up to €1,800 for solar panels and €600 for a battery, or up to €9,000 on certain welfare payments. See 2026 rules, county uptake and scams.